Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 3 Morse St Ne, Washington, Dc 20002 Due diligence/geotechnical investigation. Installation of four 6-inch diameter hollow-stem auger soil borings to depths of feet below grade. Groundwater samples will be collected from each boring through the auger. Borings will be open no longer than 24 hours and will be abandoned on the same day as drilling by tremi-grouting, using a 2 pounds bentonite to 1 gallon of water slurry, per doee regulations. Idw will be properly managed. Date: July 6, 2016 Contractor: Na Jemals Tko Llc; Ecc Inc Client: Jemals Tko L L C | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600269 |