Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 901 4th Street Nw Washington Dc Site work in public row for the proposed development at the corner of 4th and i st nw. A separate application for this site has been submitted to the psc has been submitted for the new driveway, canopy, vault, curb cut and bike racks. Date: December 17, 2015 Contractor: Mvp Llc Permit type: Landscaping; replacement tree, excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: May 1, 2017 | |||||
SCORE 86 901 4th Street Nw Washington Dc Dc bar is hereby requesting a public space committee meeting hearing for the bike racks, new driveway, and canopy for the proposed development at the corner of 4th and i st nw. All other public space improvements, including streetlight, trees, etc. Are included in permit application 120737, and should not be referenced in this permit. Date: December 22, 2015 Contractor: Mvp Llc Permit type: Paving; driveway(s) new- commercial, fixture; bike rack(s), projections; canopy, excavation; vault(s) lxw | Permit status: Assigned | Expiration date: May 1, 2017 | |||||
SCORE 86 901 4th Street Nw Washington Dc Dc bar space committee meeting permit including the bike racks and canopy for the proposed development at the corner of 4th and i st nw. All other public space improvements, including streetlight, trees, etc. Are included in permit application 120737, and should not be referenced in this permit. Date: December 22, 2015 Contractor: Mvp Llc Permit type: Fixture; bike rack(s), projections; canopy, excavation; vault(s) lxw | Permit status: Assigned | Expiration date: May 1, 2017 | |||||
SCORE 86 901 4th Street Nw Washington Dc Landscaping; replacement tree, excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; valves (excavation), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench) Contractor: Mvp Llc Permit status: 3 | Expiration date: May 1, 2017 | Permit id: 0 | |||||
SCORE 86 Contractor: Mvp Llc Permit status: 12 | Expiration date: January 1, 2018 | Permit id: 0 | |||||
SCORE 86 Date: December 2, 2016 Contractor: Mvp Llc Permit status: 8 | Expiration date: January 1, 2017 | Permit id: Pa120905 | |||||
SCORE 86 901 4th Street Nw Washington Dc Dc bar space committee meeting permit including the bike racks and canopy for the proposed development at the corner of 4th and i st nw. All other public space improvements, including streetlight, trees, etc. Are included in permit application 120737, and should not be referenced in this permit. Date: February 9, 2017 Contractor: Mvp Llc Permit type: Fixture; bike rack(s), projections; canopy, excavation; vault(s) lxw | Permit status: Assigned | Expiration date: January 1, 2018 | Permit id: 0 | |||||
SCORE 86 901 4th Street Nw Washington Dc Landscaping; replacement tree, excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; valves (excavation), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench) Contractor: Mvp Llc Permit status: 3 | Expiration date: May 1, 2017 | Permit id: 0 | |||||
SCORE 86 Contractor: Mvp Llc Permit status: 1 | Expiration date: January 1, 2018 | Permit id: 0 | |||||
SCORE 86 901 4th Street Nw Washington Dc Dc bar space committee meeting permit including the bike racks and canopy for the proposed development at the corner of 4th and i st nw. All other public space improvements, including streetlight, trees, etc. Are included in permit application 120737, and should not be referenced in this permit. Contractor: Mvp Llc Permit status: Approved (pending payment | Expiration date: January 1, 2018 | Permit id: 0 |