Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 4 New York Avenue Nw Washington Dc Removal of (2) existing site lighting poles and the re-installation of the same site lighting poles in a new location at a later date. Date: June 4, 2014 Contractor: Mitch Permuy Client: Ba New York Avenue, Llc Ba New York Avenue, Llc | Permit type: Fixture; street fixture or furniture (exception) | Permit status: Cancel/withdrawn | Expiration date: January 2, 2015 | |||||
SCORE 100 4 New York Avenue Nw Washington Dc Removal of (3) street light poles and then reinstall the light poles at a later date and new location as shown on the attached civil drawings by richter & associates. Date: June 4, 2014 Contractor: Mitch Permuy Client: Ba New York Avenue, Llc Ba New York Avenue, Llc | Permit type: Over head work; streetlight damage deposit | Permit status: Cancel/withdrawn | Expiration date: February 27, 2015 | |||||
SCORE 100 Contractor: Mitch Permuy Permit status: 3 | Expiration date: January 2, 2015 | Permit id: 0 | |||||
SCORE 100 4 New York Avenue Nw Washington Dc Over head work; streetlight damage deposit (office use only), over head work; pole installation (single or first one), over head work; pole removal (single or first one), excavation; electric connection (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole removal (each addl), over head work; streetlight(s) installation Contractor: Mitch Permuy Permit status: 3 | Expiration date: February 27, 2015 | Permit id: 0 | |||||
SCORE 100 Contractor: Mitch Permuy Permit status: 3 | Expiration date: January 2, 2015 | Permit id: 0 | |||||
SCORE 100 4 New York Avenue Nw Washington Dc Over head work; streetlight damage deposit (office use only), over head work; pole installation (single or first one), over head work; pole removal (single or first one), excavation; electric connection (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole removal (each addl), over head work; streetlight(s) installation Contractor: Mitch Permuy Permit status: 3 | Expiration date: February 27, 2015 | Permit id: 0 | |||||
SCORE 100 34 Wisconsin Ave Nw, Washington, Dc 20016 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf1wm2ghju3rfh21cutktzi Date: November 13, 2012 Contractor: Mitch Permuy Client: Bozzuto Development | Permit type: Electrical | Permit status: Permit issued | Permit id: E71887622 | |||||
SCORE 100 17 K St Nw, Washington, Dc 20006 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildevutpscac102eysbmlbg9 Date: March 9, 2013 Contractor: Mitch Permuy Client: Peter Cole | Permit type: Electrical | Permit status: Permit issued | Permit id: E44881912 | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 8, 2016 | Expiration date: September 8, 2016 | Permit id: 2014-037906 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 8, 2016 | Expiration date: September 8, 2016 | Permit id: 2014-037907 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 8, 2016 | Expiration date: September 8, 2016 | Permit id: 2014-037908 Ep | |||||
SCORE 100 42 East Ave Austin Tx 78701 Change exst elec serv from over head to underground see 201000716 for repermit Date: September 14, 2007 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Void | Expiration date: March 17, 2008 | Permit id: 2007-151262 Ep | |||||
SCORE 100 Date: September 18, 2007 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Void | Expiration date: April 7, 2008 | Permit id: 2007-151995 Ep | |||||
SCORE 100 Date: June 28, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 16, 2016 | Expiration date: August 16, 2016 | Permit id: 2016-076288 Ep | |||||
SCORE 100 Date: December 17, 2007 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 20, 2009 | Expiration date: January 20, 2009 | Permit id: 2007-127768 Ep | |||||
SCORE 100 Date: July 30, 2008 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 30, 2009 | Expiration date: January 30, 2009 | Permit id: 2007-127807 Ep | |||||
SCORE 100 Date: August 8, 2008 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 18, 2008 | Expiration date: August 18, 2008 | Permit id: 2008-062654 Ep | |||||
SCORE 100 Date: June 29, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 15, 2016 | Expiration date: July 15, 2016 | Permit id: 2016-038896 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 30, 2016 | Expiration date: August 30, 2016 | Permit id: 2014-0379 Ep | |||||
SCORE 100 Date: January 29, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: October 4, 2016 | Permit id: 2015-010591 Ep | |||||
SCORE 100 Date: March 17, 2008 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 2, 2008 | Expiration date: April 2, 2008 | Permit id: 2008-018547 Ep | |||||
SCORE 100 3607 S Lamar Blvd Bldg 1 Austin Tx 78704 New mutlifamily res apts includes clubfitnessbusiness and courtyards 1 2 3 over shell podium separate permit Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 20, 2017 | Permit id: 2015-123189 Ep | |||||
SCORE 100 1 San Antonio St Austin Tx 78701 New mixed use wcore areas 1st fl shell retail a 3480sf retail b 11030sf restauarnt a 7330sf restaurant b 6325sf leasinglobby 4638sf office lobby 435sf core and boh garage b37 320695sf mezz rest shell 2750sf shell office 24 21660sf apts 238 roof 8th fl amenity areas Date: May 16, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 16, 2016 | Expiration date: September 16, 2016 | Permit id: 2014-037869 Ep | |||||
SCORE 100 Date: January 11, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 15, 2017 | Permit id: 2015-150245 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 29, 2013 | Expiration date: July 29, 2013 | Permit id: 2012-035717 Ep | |||||
SCORE 100 Date: June 18, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 25, 2013 | Expiration date: July 25, 2013 | Permit id: 2013-0285 Ep | |||||
SCORE 100 Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: February 18, 2017 | Permit id: 2015-135437 Ep | |||||
SCORE 100 Date: April 21, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: December 12, 2016 | Permit id: 2016-045576 Ep | |||||
SCORE 100 Date: March 27, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 17, 2014 | Expiration date: July 17, 2014 | Permit id: 2014-008236 Ep | |||||
SCORE 100 Date: June 7, 2007 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 18, 2007 | Expiration date: June 18, 2007 | Permit id: 2007-127339 Ep | |||||
SCORE 100 Date: December 17, 2007 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 20, 2009 | Expiration date: January 20, 2009 | Permit id: 2007-127772 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132979 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-1329 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132981 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132982 Ep | |||||
SCORE 100 Date: January 26, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132983 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132984 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132985 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132986 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132987 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132988 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132989 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-1329 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132991 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132992 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132993 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132994 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132995 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132996 Ep | |||||
SCORE 100 Date: December 22, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132997 Ep | |||||
SCORE 100 Date: December 22, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132998 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-132999 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-1330 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-133001 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-133002 Ep | |||||
SCORE 100 Date: November 26, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-133003 Ep | |||||
SCORE 100 Date: November 26, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-133004 Ep | |||||
SCORE 100 126 Mc Callen Pass Bldg Trash Austin Tx 78753 New trash compactor enclosure for multifamily res apts bldg dd Date: September 30, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-133006 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: January 10, 2017 | Permit id: 2013-133007 Ep | |||||
SCORE 100 Date: September 14, 2007 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Void | Expiration date: March 17, 2008 | Permit id: 2007-151263 Ep | |||||
SCORE 100 Date: May 27, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 23, 2015 | Expiration date: June 23, 2015 | Permit id: 2014-031873 Ep | |||||
SCORE 100 Date: May 27, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 30, 2015 | Expiration date: June 30, 2015 | Permit id: 2014-031874 Ep | |||||
SCORE 100 Date: May 27, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 21, 2015 | Expiration date: October 21, 2015 | Permit id: 2014-031875 Ep | |||||
SCORE 100 Date: May 27, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 13, 2015 | Expiration date: July 13, 2015 | Permit id: 2014-031876 Ep | |||||
SCORE 100 Date: May 27, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 26, 2015 | Expiration date: August 26, 2015 | Permit id: 2014-031877 Ep | |||||
SCORE 100 Date: May 27, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 26, 2015 | Expiration date: August 26, 2015 | Permit id: 2014-031878 Ep | |||||
SCORE 100 Date: April 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 3, 2016 | Expiration date: May 3, 2016 | Permit id: 2014-0378 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 25, 2016 | Expiration date: February 25, 2016 | Permit id: 2014-037871 Ep | |||||
SCORE 100 Date: April 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 12, 2016 | Expiration date: February 12, 2016 | Permit id: 2014-037873 Ep | |||||
SCORE 100 Date: April 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 14, 2016 | Expiration date: January 14, 2016 | Permit id: 2014-037874 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 12, 2016 | Expiration date: February 12, 2016 | Permit id: 2014-037875 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 25, 2016 | Expiration date: February 25, 2016 | Permit id: 2014-037876 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 25, 2016 | Expiration date: February 25, 2016 | Permit id: 2014-037877 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 7, 2016 | Expiration date: March 7, 2016 | Permit id: 2014-037878 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 30, 2016 | Expiration date: March 30, 2016 | Permit id: 2014-037879 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 30, 2016 | Expiration date: March 30, 2016 | Permit id: 2014-0378 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 15, 2016 | Expiration date: April 15, 2016 | Permit id: 2014-037881 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 29, 2016 | Expiration date: April 29, 2016 | Permit id: 2014-037882 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 29, 2016 | Expiration date: April 29, 2016 | Permit id: 2014-037883 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 20, 2016 | Expiration date: May 20, 2016 | Permit id: 2014-037884 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 24, 2016 | Expiration date: May 24, 2016 | Permit id: 2014-037885 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 1, 2016 | Expiration date: June 1, 2016 | Permit id: 2014-037887 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 2, 2016 | Expiration date: June 2, 2016 | Permit id: 2014-037888 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 17, 2016 | Expiration date: June 17, 2016 | Permit id: 2014-037889 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 22, 2016 | Expiration date: June 22, 2016 | Permit id: 2014-0378 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 1, 2016 | Expiration date: July 1, 2016 | Permit id: 2014-037891 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 7, 2016 | Expiration date: July 7, 2016 | Permit id: 2014-037892 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 11, 2016 | Expiration date: July 11, 2016 | Permit id: 2014-037893 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 13, 2016 | Expiration date: July 13, 2016 | Permit id: 2014-037894 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 21, 2016 | Expiration date: July 21, 2016 | Permit id: 2014-037895 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 21, 2016 | Expiration date: July 21, 2016 | Permit id: 2014-037896 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 10, 2016 | Expiration date: August 10, 2016 | Permit id: 2014-037897 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 29, 2016 | Expiration date: August 29, 2016 | Permit id: 2014-037899 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 30, 2016 | Expiration date: August 30, 2016 | Permit id: 2014-037901 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 31, 2016 | Expiration date: August 31, 2016 | Permit id: 2014-037902 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 31, 2016 | Expiration date: August 31, 2016 | Permit id: 2014-037903 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 7, 2016 | Expiration date: September 7, 2016 | Permit id: 2014-037904 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 7, 2016 | Expiration date: September 7, 2016 | Permit id: 2014-037905 Ep | |||||
SCORE 100 98 San Jacinto Blvd Austin Tx 78701 New construction of a structural frame for a mixed use shell building and garage town lake residences condominiums Date: April 16, 2008 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 23, 2010 | Expiration date: April 23, 2010 | Permit id: 2008-004322 Ep | |||||
SCORE 100 Date: June 16, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 19, 2014 | Expiration date: June 19, 2014 | Permit id: 2014-062461 Ep | |||||
SCORE 100 Date: June 24, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 24, 2015 | Expiration date: April 24, 2015 | Permit id: 2014-066374 Ep | |||||
SCORE 100 111 Sandra Muraida Way Austin Tx 78703 Interior remodel to existing multifamily parking garage to create private secure spacesspaces 356 357 Date: November 24, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2014-125075 Ep | |||||
SCORE 100 111 Sandra Muraida Way Austin Tx 78703 Interior remodel to existing multifamily parking garage to create private secure spacesspaces 456 457 Date: November 24, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2014-125076 Ep | |||||
SCORE 100 Date: July 7, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 25, 2014 | Expiration date: July 25, 2014 | Permit id: 2014-070592 Ep | |||||
SCORE 100 311 Bowie St Austin Tx 78703 New swimming pool in highrise mixed use buildingreplaces exp pr 2013028646 pr Date: November 13, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 25, 2015 | Expiration date: February 25, 2015 | Permit id: 2014-070862 Ep | |||||
SCORE 100 Date: August 7, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 21, 2014 | Expiration date: August 21, 2014 | Permit id: 2014-083242 Ep | |||||
SCORE 100 Date: May 1, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 16, 2015 | Expiration date: June 16, 2015 | Permit id: 2015-051284 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052798 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052775 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052776 Ep | |||||
SCORE 100 501 West Ave Austin Tx 78701 Finishout for entrance lobby commercial spce on level 1 including covered outdoor space Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052777 Ep | |||||
SCORE 100 501 West Ave Austin Tx 78701 Finishout for amenity area pool deck fitnessyogaloungecommunity spce librarygameroom mechanicalutility rooms restrooms and multifamily residential units level 6 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052778 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052779 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-0527 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052781 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052782 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052783 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052784 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052785 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-0528 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052786 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052787 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052788 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052789 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052791 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052792 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052793 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052799 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052794 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052795 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052796 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052797 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052801 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052802 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052803 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052804 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052805 Ep | |||||
SCORE 100 Date: September 12, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052806 Ep | |||||
SCORE 100 Date: June 10, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 15, 2015 | Expiration date: June 15, 2015 | Permit id: 2015-0700 Ep | |||||
SCORE 100 Date: June 10, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 15, 2015 | Expiration date: June 15, 2015 | Permit id: 2015-070034 Ep | |||||
SCORE 100 311 Bowie St Unit 35 Austin Tx 78703 Interior remodel to existing multifamily unit add door to create 1 unit c1b9 Date: May 18, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 19, 2015 | Expiration date: May 19, 2015 | Permit id: 2015-007385 Ep | |||||
SCORE 100 Date: January 5, 2010 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 19, 2010 | Expiration date: January 19, 2010 | Permit id: 2010-000716 Ep | |||||
SCORE 100 Date: January 11, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 15, 2017 | Permit id: 2015-150244 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101606 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101609 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101613 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101625 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 8, 2015 | Expiration date: October 8, 2015 | Permit id: 2015-101631 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 8, 2015 | Expiration date: October 8, 2015 | Permit id: 2015-101633 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-1016 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101645 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101648 Ep | |||||
SCORE 100 Date: September 16, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101659 Ep | |||||
SCORE 100 Date: September 16, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101661 Ep | |||||
SCORE 100 Date: September 16, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101663 Ep | |||||
SCORE 100 Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 20, 2017 | Permit id: 2015-1231 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create coctail lounge amenity area level 19 for tenants use only note see conditional use permit for restricted hours of operation Date: October 19, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 22, 2015 | Expiration date: October 22, 2015 | Permit id: 2015-124409 Ep | |||||
SCORE 100 Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 12, 2017 | Permit id: 2015-128237 Ep | |||||
SCORE 100 Date: May 25, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: November 29, 2016 | Permit id: 2016-0609 Ep | |||||
SCORE 100 Date: May 25, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 27, 2016 | Expiration date: May 27, 2016 | Permit id: 2016-060952 Ep | |||||
SCORE 100 Date: March 21, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 19, 2016 | Expiration date: July 19, 2016 | Permit id: 2016-008813 Ep | |||||
SCORE 100 Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 13, 2017 | Permit id: 2016-009756 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res amenity spaces leasing office lobby and corridors ground floor level 1 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 14, 2015 | Expiration date: January 14, 2015 | Permit id: 2013-007856 Ep | |||||
SCORE 100 Date: February 5, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 8, 2013 | Expiration date: February 8, 2013 | Permit id: 2013-011096 Ep | |||||
SCORE 100 Date: January 28, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: October 1, 2014 | Permit id: 2013-081118 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 2, 2016 | Expiration date: May 2, 2016 | Permit id: 2013-1136 Ep | |||||
SCORE 100 Date: November 3, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 10, 2016 | Expiration date: May 10, 2016 | Permit id: 2014-024448 Ep | |||||
SCORE 100 Date: November 3, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 17, 2016 | Expiration date: March 17, 2016 | Permit id: 2014-024449 Ep | |||||
SCORE 100 Date: April 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 9, 2015 | Expiration date: December 9, 2015 | Permit id: 2014-037872 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 26, 2016 | Expiration date: May 26, 2016 | Permit id: 2014-037886 Ep | |||||
SCORE 100 Date: July 9, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 4, 2014 | Expiration date: September 4, 2014 | Permit id: 2014-064594 Ep | |||||
SCORE 100 Date: November 12, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 14, 2015 | Expiration date: July 14, 2015 | Permit id: 2014-089008 Ep | |||||
SCORE 100 111 Sandra Muraida Way Austin Tx 78703 Interior remodel to existing multifamily parking garage to create private secure spacesspaces 256 257 Date: November 24, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2014-125074 Ep | |||||
SCORE 100 507 West Ave Austin Tx 78701 Interior remodel to existing retailoffice with new exterior egress stair Date: February 10, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 8, 2015 | Expiration date: April 8, 2015 | Permit id: 2014-129317 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101635 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101649 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 25, 2015 | Expiration date: September 25, 2015 | Permit id: 2015-101653 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101655 Ep | |||||
SCORE 100 11 S Lamar Blvd Austin Tx 78704 Remodel to add decorative fountain to 2nd floor courtyard for existing multifamily res apts Date: February 16, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 4, 2016 | Expiration date: March 4, 2016 | Permit id: 2015-118237 Ep | |||||
SCORE 100 98 San Jacinto Blvd Unit Gar Austin Tx 78701 New mixed use basement storagechiller9088sf and garage 1st flr shell retail 9713sf lobbyoffices core building services and garage 2nd thru 5th floors garage 6th thru 31st floors core area and unit basics 32nd floor fitness library pool deck and amenity area and kitchen Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 23, 2010 | Expiration date: April 23, 2010 | Permit id: 2008-0938 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 14, 2010 | Expiration date: April 14, 2010 | Permit id: 2008-093801 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 22, 2010 | Expiration date: March 22, 2010 | Permit id: 2008-093802 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 22, 2010 | Expiration date: March 22, 2010 | Permit id: 2008-093803 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 23, 2010 | Expiration date: March 23, 2010 | Permit id: 2008-093804 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 23, 2010 | Expiration date: March 23, 2010 | Permit id: 2008-093806 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 24, 2010 | Expiration date: March 24, 2010 | Permit id: 2008-093807 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 24, 2010 | Expiration date: March 24, 2010 | Permit id: 2008-093808 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 16, 2010 | Expiration date: April 16, 2010 | Permit id: 2008-093809 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 14, 2010 | Expiration date: April 14, 2010 | Permit id: 2008-0938 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 14, 2010 | Expiration date: April 14, 2010 | Permit id: 2008-093811 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 16, 2010 | Expiration date: April 16, 2010 | Permit id: 2008-093812 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 13, 2010 | Expiration date: May 13, 2010 | Permit id: 2008-093813 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 13, 2010 | Expiration date: May 13, 2010 | Permit id: 2008-093814 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 21, 2010 | Expiration date: May 21, 2010 | Permit id: 2008-093815 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 21, 2010 | Expiration date: May 21, 2010 | Permit id: 2008-093816 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 28, 2010 | Expiration date: June 28, 2010 | Permit id: 2008-093817 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 19, 2010 | Expiration date: August 19, 2010 | Permit id: 2008-093818 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 30, 2010 | Expiration date: June 30, 2010 | Permit id: 2008-093819 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 30, 2010 | Expiration date: June 30, 2010 | Permit id: 2008-0938 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 25, 2010 | Expiration date: June 25, 2010 | Permit id: 2008-093821 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 24, 2010 | Expiration date: August 24, 2010 | Permit id: 2008-093822 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 18, 2010 | Expiration date: August 18, 2010 | Permit id: 2008-093823 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 27, 2010 | Expiration date: August 27, 2010 | Permit id: 2008-093824 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 29, 2010 | Expiration date: September 29, 2010 | Permit id: 2008-093825 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 25, 2010 | Expiration date: June 25, 2010 | Permit id: 2008-093826 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Withdrawn | Expiration date: August 23, 2011 | Permit id: 2008-093827 Ep | |||||
SCORE 100 801 W 5th St Austin Tx 78703 New construction water fountain for multifamily condos replace bldg permit bp08021461 Date: April 2, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 16, 2009 | Expiration date: July 16, 2009 | Permit id: 2009-022854 Ep | |||||
SCORE 100 Date: July 9, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 24, 2011 | Expiration date: February 24, 2011 | Permit id: 2009-0721 Ep | |||||
SCORE 100 Date: November 13, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 4, 2016 | Expiration date: August 4, 2016 | Permit id: 2015-132447 Ep | |||||
SCORE 100 Date: January 11, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 15, 2017 | Permit id: 2015-150246 Ep | |||||
SCORE 100 Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 13, 2017 | Permit id: 2016-009757 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 New construction parking garage shell multifamily apartmentscore areas include plaza amenity deckgarage 235851 condominium 273890 Date: October 24, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 17, 2014 | Expiration date: December 17, 2014 | Permit id: 2010-028726 Ep | |||||
SCORE 100 98 San Jacinto Blvd Unit Fsr2701 Austin Tx 78701 Interior remodel to mf residential unit to complete interior finishes for occupancyreplaces exp pmt 2010065122 bpepppmp Date: April 11, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 27, 2011 | Expiration date: April 27, 2011 | Permit id: 2011-025378 Ep | |||||
SCORE 100 98 San Jacinto Blvd Unit Fsr2902 Austin Tx 78701 Interior remodel to existing multifamily res to complete interior finishes for occupancy Date: January 14, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 17, 2011 | Expiration date: February 17, 2011 | Permit id: 2010-064891 Ep | |||||
SCORE 100 Date: January 14, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 4, 2011 | Expiration date: March 4, 2011 | Permit id: 2010-065043 Ep | |||||
SCORE 100 Date: January 14, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Void | Expiration date: January 30, 2011 | Permit id: 2010-065122 Ep | |||||
SCORE 100 2415 1 2 Seton Ave Austin Tx 78705 Temp electric power pole refer 2011060228 installation for wiring to the crane and bulk hoist and concrete pump and building Date: November 18, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2011 | Expiration date: December 22, 2011 | Permit id: 2011-105029 Ep | |||||
SCORE 100 Date: January 11, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 29, 2013 | Expiration date: July 29, 2013 | Permit id: 2012-000905 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 10, 2008 | Expiration date: November 10, 2008 | Permit id: 2007-002102 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: September 26, 2008 | Expiration date: September 26, 2008 | Permit id: 2007-002103 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: September 26, 2008 | Expiration date: September 26, 2008 | Permit id: 2007-002104 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: September 26, 2008 | Expiration date: September 26, 2008 | Permit id: 2007-002105 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2008 | Expiration date: November 18, 2008 | Permit id: 2007-002106 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2008 | Expiration date: November 18, 2008 | Permit id: 2007-002107 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2008 | Expiration date: November 18, 2008 | Permit id: 2007-002109 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2008 | Expiration date: November 18, 2008 | Permit id: 2007-0021 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2008 | Expiration date: November 18, 2008 | Permit id: 2007-002111 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 10, 2008 | Expiration date: November 10, 2008 | Permit id: 2007-002112 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 10, 2008 | Expiration date: November 10, 2008 | Permit id: 2007-002113 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2008 | Expiration date: November 18, 2008 | Permit id: 2007-002114 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 21, 2008 | Expiration date: November 21, 2008 | Permit id: 2007-002115 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 21, 2008 | Expiration date: November 21, 2008 | Permit id: 2007-002116 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 21, 2008 | Expiration date: November 21, 2008 | Permit id: 2007-002117 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: November 21, 2008 | Expiration date: November 21, 2008 | Permit id: 2007-002119 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2008 | Expiration date: December 22, 2008 | Permit id: 2007-0021 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2008 | Expiration date: December 22, 2008 | Permit id: 2007-002121 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2008 | Expiration date: December 22, 2008 | Permit id: 2007-002122 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2008 | Expiration date: December 22, 2008 | Permit id: 2007-002124 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2008 | Expiration date: December 22, 2008 | Permit id: 2007-002125 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2008 | Expiration date: December 22, 2008 | Permit id: 2007-002126 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 31, 2008 | Expiration date: December 31, 2008 | Permit id: 2007-002127 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: December 31, 2008 | Expiration date: December 31, 2008 | Permit id: 2007-002128 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: January 13, 2009 | Expiration date: January 13, 2009 | Permit id: 2007-002129 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: January 13, 2009 | Expiration date: January 13, 2009 | Permit id: 2007-0021 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: January 14, 2009 | Expiration date: January 14, 2009 | Permit id: 2007-002131 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: January 13, 2009 | Expiration date: January 13, 2009 | Permit id: 2007-002123 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: July 24, 2008 | Expiration date: July 24, 2008 | Permit id: 2006-019454 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: January 14, 2009 | Expiration date: January 14, 2009 | Permit id: 2007-002108 Ep | |||||
SCORE 100 Permit type: Electrical permit | Permit status: Final | Completion date: January 20, 2009 | Expiration date: January 20, 2009 | Permit id: 2007-002118 Ep | |||||
SCORE 100 Date: September 13, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052807 Ep | |||||
SCORE 100 Date: September 13, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052808 Ep | |||||
SCORE 100 Date: September 13, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052809 Ep | |||||
SCORE 100 Date: September 13, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 11, 2017 | Permit id: 2015-052811 Ep | |||||
SCORE 100 111 Sandra Muraida Way Austin Tx 78703 New mixed use wcore areas and unit basics 352399 sfgarage 175621sf basement thru 4th including balconiesdecksshell retail 14555sf Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 6, 2014 | Expiration date: June 6, 2014 | Permit id: 2012-008477 Ep | |||||
SCORE 100 Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 9, 2014 | Expiration date: January 9, 2014 | Permit id: 2012-008478 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 3 Austin Tx 78703 Tenant finishout amenity level fitness club theater business center amenity deck 3rd floor Date: April 15, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 31, 2014 | Expiration date: July 31, 2014 | Permit id: 2012-008479 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 4 Austin Tx 78703 Tenant finishout multifamily res unit details 4th floor Date: October 15, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 27, 2014 | Expiration date: October 27, 2014 | Permit id: 2012-0084 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 5 Austin Tx 78703 Tenant finishout multifamily res unit details 5th floor Date: January 23, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 1, 2014 | Expiration date: May 1, 2014 | Permit id: 2012-008481 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 6 Austin Tx 78703 Tenant finishout multifamily res unit details 6th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 8, 2014 | Expiration date: January 8, 2014 | Permit id: 2012-008482 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 7 Austin Tx 78703 Tenant finishout multifamily res unit details 7th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 8, 2014 | Expiration date: January 8, 2014 | Permit id: 2012-008483 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 8 Austin Tx 78703 Tenant finishout multifamily res unit details 8th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 8, 2014 | Expiration date: January 8, 2014 | Permit id: 2012-008484 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 9 Austin Tx 78703 Tenant finishout multifamily res unit details 9th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 10, 2014 | Expiration date: January 10, 2014 | Permit id: 2012-008485 Ep | |||||
SCORE 100 Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 23, 2014 | Expiration date: January 23, 2014 | Permit id: 2012-008486 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 11 Austin Tx 78703 Tenant finishout multifamily res unit details 11th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 6, 2014 | Expiration date: February 6, 2014 | Permit id: 2012-008487 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 12 Austin Tx 78703 Tenant finishout multifamily res unit details 12th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 13, 2014 | Expiration date: February 13, 2014 | Permit id: 2012-008488 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 13 Austin Tx 78703 Tenant finishout multifamily res unit details 13th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 13, 2014 | Expiration date: February 13, 2014 | Permit id: 2012-008489 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 14 Austin Tx 78703 Tenant finishout multifamily res unit details 14th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 26, 2014 | Expiration date: February 26, 2014 | Permit id: 2012-0084 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 15 Austin Tx 78703 Tenant finishout multifamily res unit details 15th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 27, 2014 | Expiration date: February 27, 2014 | Permit id: 2012-008491 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 16 Austin Tx 78703 Tenant finishout multifamily res unit details 16th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 12, 2014 | Expiration date: March 12, 2014 | Permit id: 2012-008492 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 17 Austin Tx 78703 Tenant finishout multifamily res unit details 17th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 2, 2014 | Expiration date: April 2, 2014 | Permit id: 2012-008493 Ep | |||||
SCORE 100 111 Sandra Muraida Way Unit 18 Austin Tx 78703 Tenant finishout multifamily res unit details 18th floor Date: March 16, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 28, 2014 | Expiration date: April 28, 2014 | Permit id: 2012-008494 Ep | |||||
SCORE 100 Date: January 31, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Void | Expiration date: August 26, 2012 | Permit id: 2012-009572 Ep | |||||
SCORE 100 Date: February 10, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 29, 2012 | Expiration date: February 29, 2012 | Permit id: 2012-013507 Ep | |||||
SCORE 100 505 W 22nd St Austin Tx 78705 New construction shell multifamily group residential wcore areas unit basics 314659 and parking garage 271006 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 9, 2013 | Expiration date: August 9, 2013 | Permit id: 2012-035707 Ep | |||||
SCORE 100 505 W 22nd St Unit 1 Austin Tx 78705 Finish out 1st floor lobbycorridorsrestroomsofficeselevatorgameroomtheatreelectrical roommaintenance room and trash room Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 30, 2013 | Expiration date: July 30, 2013 | Permit id: 2012-035708 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 6, 2013 | Expiration date: August 6, 2013 | Permit id: 2012-035709 Ep | |||||
SCORE 100 505 W 22nd St Unit 7 Austin Tx 78705 Finish out group residential units fitness roompool deck and courtyard Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 27, 2013 | Expiration date: July 27, 2013 | Permit id: 2012-0357 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 28, 2013 | Expiration date: July 28, 2013 | Permit id: 2012-035711 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 28, 2013 | Expiration date: July 28, 2013 | Permit id: 2012-035712 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 26, 2013 | Expiration date: July 26, 2013 | Permit id: 2012-035713 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 27, 2013 | Expiration date: July 27, 2013 | Permit id: 2012-035714 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 29, 2013 | Expiration date: July 29, 2013 | Permit id: 2012-035715 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 29, 2013 | Expiration date: July 29, 2013 | Permit id: 2012-035716 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 29, 2013 | Expiration date: July 29, 2013 | Permit id: 2012-035718 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 6, 2013 | Expiration date: August 6, 2013 | Permit id: 2012-035719 Ep | |||||
SCORE 100 Date: May 7, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 31, 2013 | Expiration date: July 31, 2013 | Permit id: 2012-0357 Ep | |||||
SCORE 100 Date: May 3, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: April 28, 2013 | Permit id: 2012-043763 Ep | |||||
SCORE 100 422 W Riverside Dr Bldg Gar Austin Tx 78704 New shell bldg lower level first floor lease space 3932sf 2 mf units on 1st floor and parking garage 106675sf Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 9, 2016 | Expiration date: August 9, 2016 | Permit id: 2013-113649 Ep | |||||
SCORE 100 24 Nueces St Austin Tx 78705 Tenant finishout for unit details level 12 two story res unitsleasing officelobby and support space Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 10, 2013 | Expiration date: June 10, 2013 | Permit id: 2012-054328 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 4, 2013 | Expiration date: June 4, 2013 | Permit id: 2012-054329 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 6, 2013 | Expiration date: June 6, 2013 | Permit id: 2012-0543 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 13, 2013 | Expiration date: June 13, 2013 | Permit id: 2012-054331 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 23, 2013 | Expiration date: July 23, 2013 | Permit id: 2012-054332 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 12, 2013 | Expiration date: July 12, 2013 | Permit id: 2012-054333 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 12, 2013 | Expiration date: July 12, 2013 | Permit id: 2012-054334 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 5, 2013 | Expiration date: August 5, 2013 | Permit id: 2012-054335 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 5, 2013 | Expiration date: August 5, 2013 | Permit id: 2012-054336 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 9, 2013 | Expiration date: August 9, 2013 | Permit id: 2012-054337 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 17, 2013 | Expiration date: July 17, 2013 | Permit id: 2012-054338 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 9, 2013 | Expiration date: August 9, 2013 | Permit id: 2012-054339 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 18, 2013 | Expiration date: July 18, 2013 | Permit id: 2012-054341 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 9, 2013 | Expiration date: October 9, 2013 | Permit id: 2012-054342 Ep | |||||
SCORE 100 Date: January 6, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: February 16, 2015 | Permit id: 2014-000824 Ep | |||||
SCORE 100 Date: January 25, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 19, 2013 | Expiration date: February 19, 2013 | Permit id: 2013-007484 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units corridors and amenity spaceresidential level 19 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 9, 2015 | Expiration date: September 9, 2015 | Permit id: 2013-007857 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential leve 7 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 12, 2015 | Expiration date: January 12, 2015 | Permit id: 2013-007858 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level 8 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 22, 2014 | Expiration date: December 22, 2014 | Permit id: 2013-007859 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units corridors and amenity spacesresidential level 6 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2013-0078 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level 10 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2013-007861 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level 11 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 1, 2015 | Expiration date: April 1, 2015 | Permit id: 2013-007862 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level 12 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 6, 2015 | Expiration date: April 6, 2015 | Permit id: 2013-007863 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level 13 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 6, 2015 | Expiration date: April 6, 2015 | Permit id: 2013-007864 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level 14 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 28, 2015 | Expiration date: May 28, 2015 | Permit id: 2013-007865 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level15 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 28, 2015 | Expiration date: May 28, 2015 | Permit id: 2013-007866 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidentail level 16 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 5, 2015 | Expiration date: June 5, 2015 | Permit id: 2013-007867 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidentail level 17 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 9, 2015 | Expiration date: June 9, 2015 | Permit id: 2013-007868 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidenital level18 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 15, 2015 | Expiration date: July 15, 2015 | Permit id: 2013-007869 Ep | |||||
SCORE 100 Date: November 3, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 25, 2016 | Expiration date: July 25, 2016 | Permit id: 2014-0244 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 20, 2013 | Expiration date: September 20, 2013 | Permit id: 2013-017385 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 6, 2013 | Expiration date: August 6, 2013 | Permit id: 2013-017386 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 12, 2013 | Expiration date: November 12, 2013 | Permit id: 2013-017387 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 23, 2014 | Expiration date: January 23, 2014 | Permit id: 2013-017388 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 13, 2013 | Expiration date: December 13, 2013 | Permit id: 2013-017389 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 5, 2014 | Expiration date: February 5, 2014 | Permit id: 2013-0173 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 24, 2013 | Expiration date: October 24, 2013 | Permit id: 2013-017391 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 26, 2013 | Expiration date: November 26, 2013 | Permit id: 2013-017392 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 20, 2014 | Expiration date: February 20, 2014 | Permit id: 2013-017393 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 14, 2014 | Expiration date: February 14, 2014 | Permit id: 2013-017394 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 21, 2014 | Expiration date: March 21, 2014 | Permit id: 2013-017395 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 5, 2014 | Expiration date: March 5, 2014 | Permit id: 2013-017396 Ep | |||||
SCORE 100 12 E Parmer Ln Bldg Club Austin Tx 78753 New construction 3521 sf accessory clubhouse and patio 1190sf to multifamily res Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 28, 2013 | Expiration date: June 28, 2013 | Permit id: 2013-017397 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 12, 2013 | Expiration date: November 12, 2013 | Permit id: 2013-017398 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 30, 2014 | Expiration date: January 30, 2014 | Permit id: 2013-017399 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 24, 2013 | Expiration date: October 24, 2013 | Permit id: 2013-0174 Ep | |||||
SCORE 100 12 E Parmer Ln Bldg G4 Austin Tx 78753 New construction accessory garage maintenace to mulitfamily res Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 20, 2014 | Expiration date: February 20, 2014 | Permit id: 2013-017401 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 26, 2013 | Expiration date: November 26, 2013 | Permit id: 2013-017402 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 19, 2014 | Expiration date: March 19, 2014 | Permit id: 2013-017403 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 30, 2013 | Expiration date: October 30, 2013 | Permit id: 2013-017404 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 30, 2013 | Expiration date: October 30, 2013 | Permit id: 2013-017405 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 19, 2014 | Expiration date: March 19, 2014 | Permit id: 2013-017406 Ep | |||||
SCORE 100 Date: February 27, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 7, 2013 | Expiration date: March 7, 2013 | Permit id: 2013-0188 Ep | |||||
SCORE 100 Date: February 27, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 19, 2013 | Expiration date: March 19, 2013 | Permit id: 2013-018873 Ep | |||||
SCORE 100 Date: February 27, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 27, 2013 | Expiration date: March 27, 2013 | Permit id: 2013-018874 Ep | |||||
SCORE 100 Date: February 27, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 24, 2013 | Expiration date: April 24, 2013 | Permit id: 2013-018876 Ep | |||||
SCORE 100 Date: February 27, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 11, 2013 | Expiration date: March 11, 2013 | Permit id: 2013-018877 Ep | |||||
SCORE 100 Date: February 27, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 24, 2013 | Expiration date: April 24, 2013 | Permit id: 2013-018878 Ep | |||||
SCORE 100 Date: February 27, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 27, 2013 | Expiration date: March 27, 2013 | Permit id: 2013-018879 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 15, 2012 | Expiration date: August 15, 2012 | Permit id: 2012-079903 Ep | |||||
SCORE 100 422 W Riverside Dr Unit Club Austin Tx 78704 Tenant finish out to create accessory club fitness to existing multifamily res Date: April 27, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 1, 2015 | Expiration date: December 1, 2015 | Permit id: 2014-079219 Ep | |||||
SCORE 100 Date: October 26, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Void | Expiration date: April 24, 2013 | Permit id: 2012-1075 Ep | |||||
SCORE 100 Date: October 30, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 14, 2012 | Expiration date: November 14, 2012 | Permit id: 2012-109682 Ep | |||||
SCORE 100 Date: July 31, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 31, 2013 | Expiration date: July 31, 2013 | Permit id: 2013-0793 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 29, 2016 | Expiration date: August 29, 2016 | Permit id: 2014-037898 Ep | |||||
SCORE 100 3607 S Lamar Blvd Bldg 3 Austin Tx 78704 New mutlifamily res apts wcovered parking 4471sf over shell podium separate permit Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 20, 2017 | Permit id: 2015-123191 Ep | |||||
SCORE 100 422 W Riverside Dr Austin Tx 78704 New construction 750sf accessory rooftop deck to existing multifamily Date: February 26, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 12, 2016 | Expiration date: August 12, 2016 | Permit id: 2015-029675 Ep | |||||
SCORE 100 Date: May 2, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 25, 2013 | Expiration date: July 25, 2013 | Permit id: 2013-028541 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 1 Austin Tx 78704 New construction mixed use 23634sf not for occupancy below the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 26, 2015 | Expiration date: October 26, 2015 | Permit id: 2013-039506 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 2 Austin Tx 78704 New construction mixed use 20634sf shell not for occupancy below the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 20, 2015 | Expiration date: March 20, 2015 | Permit id: 2013-039507 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 3 Austin Tx 78704 New construction mixed use shell 14352sf existing alamo to remain 23466sf not for occupancy Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 1, 2014 | Expiration date: August 1, 2014 | Permit id: 2013-039508 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 1 Unit B Austin Tx 78704 New construction multifamily res144641sf and accessory club fitness 2389sf above the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2015 | Expiration date: December 30, 2015 | Permit id: 2013-039509 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 2 Unit A Austin Tx 78704 New construction multifamily res44958sf and accessory leasing amenity above the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 1, 2015 | Expiration date: April 1, 2015 | Permit id: 2013-0395 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 2 Unit B Austin Tx 78704 New construction multifamily res39240sf and accessory club fitness5180sf and amenity deck level 2 12616sf above the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 14, 2015 | Expiration date: July 14, 2015 | Permit id: 2013-039511 Ep | |||||
SCORE 100 Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 24, 2015 | Expiration date: March 24, 2015 | Permit id: 2013-039512 Ep | |||||
SCORE 100 Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 17, 2014 | Expiration date: October 17, 2014 | Permit id: 2013-039513 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 1 Unit A Austin Tx 78704 New construction multifamily res92456sf and amenity deck level one above the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 8, 2016 | Expiration date: March 8, 2016 | Permit id: 2013-039514 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 1 Unit Gar Austin Tx 78704 New construction parking garage 125355sf below the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 27, 2015 | Expiration date: October 27, 2015 | Permit id: 2013-039515 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 2 Unit Gar Austin Tx 78704 New construction parking garage 123108sf below the podium Date: August 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 20, 2015 | Expiration date: March 20, 2015 | Permit id: 2013-039516 Ep | |||||
SCORE 100 Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 31, 2014 | Expiration date: July 31, 2014 | Permit id: 2013-039517 Ep | |||||
SCORE 100 11 S Lamar Blvd Bldg 1 Unit B Austin Tx 78704 New construction multifamily res3180sf 1st level apartments below the podium Date: July 26, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 17, 2016 | Expiration date: February 17, 2016 | Permit id: 2013-040156 Ep | |||||
SCORE 100 311 Bowie St Austin Tx 78703 New shell mixed use building wcore areas 1st flr shell retail 4040sf office lobby 1484sf apt lobby 1784sf garage 211800sf floors 17 shell offices floors 89 45346sf shell units floors 1036 include amenity areas 10th flr dog walk 4348sf tenant loung 4431sf and pool deck7226sf Date: May 13, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 19, 2015 | Expiration date: May 19, 2015 | Permit id: 2013-045901 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 21, 2015 | Expiration date: January 21, 2015 | Permit id: 2013-045902 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 5, 2014 | Expiration date: September 5, 2014 | Permit id: 2013-045903 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 9, 2014 | Expiration date: September 9, 2014 | Permit id: 2013-045904 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 5, 2014 | Expiration date: November 5, 2014 | Permit id: 2013-045906 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 12, 2014 | Expiration date: November 12, 2014 | Permit id: 2013-045907 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 12, 2014 | Expiration date: November 12, 2014 | Permit id: 2013-045908 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2013-045909 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2014 | Expiration date: November 18, 2014 | Permit id: 2013-0459 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 20, 2014 | Expiration date: November 20, 2014 | Permit id: 2013-045911 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 20, 2014 | Expiration date: November 20, 2014 | Permit id: 2013-045912 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 21, 2014 | Expiration date: November 21, 2014 | Permit id: 2013-045913 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 16, 2015 | Expiration date: January 16, 2015 | Permit id: 2013-045914 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 16, 2015 | Expiration date: January 16, 2015 | Permit id: 2013-045915 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 23, 2015 | Expiration date: January 23, 2015 | Permit id: 2013-045916 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: January 30, 2015 | Expiration date: January 30, 2015 | Permit id: 2013-045917 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 3, 2015 | Expiration date: February 3, 2015 | Permit id: 2013-045918 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 12, 2015 | Expiration date: February 12, 2015 | Permit id: 2013-045919 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 23, 2015 | Expiration date: February 23, 2015 | Permit id: 2013-0459 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 27, 2015 | Expiration date: February 27, 2015 | Permit id: 2013-045921 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 10, 2015 | Expiration date: March 10, 2015 | Permit id: 2013-045922 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 2, 2015 | Expiration date: September 2, 2015 | Permit id: 2013-045924 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 3, 2015 | Expiration date: April 3, 2015 | Permit id: 2013-045925 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 28, 2015 | Expiration date: April 28, 2015 | Permit id: 2013-045926 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 17, 2015 | Expiration date: April 17, 2015 | Permit id: 2013-045927 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 17, 2015 | Expiration date: April 17, 2015 | Permit id: 2013-045928 Ep | |||||
SCORE 100 Date: November 12, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 25, 2015 | Expiration date: February 25, 2015 | Permit id: 2013-045929 Ep | |||||
SCORE 100 4818 Berkman Dr Bldg Ph1 Austin Tx 78723 New construction multifamily res w accessory club and leasing work to include shell area 2304sf 88not for occupancy Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 13, 2017 | Permit id: 2016-009754 Ep | |||||
SCORE 100 Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 13, 2017 | Permit id: 2016-009755 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 14, 2010 | Expiration date: April 14, 2010 | Permit id: 2008-093801 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 24, 2010 | Expiration date: August 24, 2010 | Permit id: 2008-093822 Ep | |||||
SCORE 100 Date: March 7, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: April 10, 2018 | Permit id: 2015-128237 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 16, 2010 | Expiration date: April 16, 2010 | Permit id: 2008-093812 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 21, 2010 | Expiration date: May 21, 2010 | Permit id: 2008-093816 Ep | |||||
SCORE 100 Date: January 14, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Void | Expiration date: January 30, 2011 | Permit id: 2010-065122 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 13, 2010 | Expiration date: May 13, 2010 | Permit id: 2008-093813 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 30, 2010 | Expiration date: June 30, 2010 | Permit id: 2008-093819 Ep | |||||
SCORE 100 Date: January 14, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 4, 2011 | Expiration date: March 4, 2011 | Permit id: 2010-065043 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 14, 2010 | Expiration date: April 14, 2010 | Permit id: 2008-0938 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 24, 2010 | Expiration date: March 24, 2010 | Permit id: 2008-093808 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 23, 2010 | Expiration date: March 23, 2010 | Permit id: 2008-093804 Ep | |||||
SCORE 100 98 San Jacinto Blvd Unit Fsr2701 Austin Tx 78701 Interior remodel to mf residential unit to complete interior finishes for occupancyreplaces exp pmt 2010065122 bpepppmp Date: April 11, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 27, 2011 | Expiration date: April 27, 2011 | Permit id: 2011-025378 Ep | |||||
SCORE 100 98 San Jacinto Blvd Unit Fsr2902 Austin Tx 78701 Interior remodel to existing multifamily res to complete interior finishes for occupancy Date: January 14, 2011 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 17, 2011 | Expiration date: February 17, 2011 | Permit id: 2010-064891 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 25, 2010 | Expiration date: June 25, 2010 | Permit id: 2008-093826 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 25, 2010 | Expiration date: June 25, 2010 | Permit id: 2008-093821 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 28, 2010 | Expiration date: June 28, 2010 | Permit id: 2008-093817 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 16, 2010 | Expiration date: April 16, 2010 | Permit id: 2008-093809 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 21, 2010 | Expiration date: May 21, 2010 | Permit id: 2008-093815 Ep | |||||
SCORE 100 Date: June 28, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 16, 2016 | Expiration date: August 16, 2016 | Permit id: 2016-076288 Ep | |||||
SCORE 100 422 W Riverside Dr Unit Club Austin Tx 78704 Tenant finish out to create accessory club fitness to existing multifamily res Date: April 27, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 1, 2015 | Expiration date: December 1, 2015 | Permit id: 2014-079219 Ep | |||||
SCORE 100 Date: April 17, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 7, 2016 | Expiration date: July 7, 2016 | Permit id: 2014-037892 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 26, 2013 | Expiration date: November 26, 2013 | Permit id: 2013-017392 Ep | |||||
SCORE 100 Date: January 25, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 19, 2013 | Expiration date: February 19, 2013 | Permit id: 2013-007484 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 21, 2014 | Expiration date: March 21, 2014 | Permit id: 2013-017395 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidential level 12 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 6, 2015 | Expiration date: April 6, 2015 | Permit id: 2013-007863 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 26, 2013 | Expiration date: November 26, 2013 | Permit id: 2013-017402 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidentail level 16 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 5, 2015 | Expiration date: June 5, 2015 | Permit id: 2013-007867 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 20, 2014 | Expiration date: February 20, 2014 | Permit id: 2013-017393 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidenital level18 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 15, 2015 | Expiration date: July 15, 2015 | Permit id: 2013-007869 Ep | |||||
SCORE 100 111 Sandra Muraida Way Austin Tx 78703 Interior remodel to existing multifamily parking garage to create private secure spacesspaces 356 357 Date: November 24, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2014-125075 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 5, 2014 | Expiration date: February 5, 2014 | Permit id: 2013-0173 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 6, 2013 | Expiration date: August 6, 2013 | Permit id: 2013-017386 Ep | |||||
SCORE 100 111 Sandra Muraida Way Austin Tx 78703 Interior remodel to existing multifamily parking garage to create private secure spacesspaces 256 257 Date: November 24, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2014-125074 Ep | |||||
SCORE 100 12 E Parmer Ln Bldg Club Austin Tx 78753 New construction 3521 sf accessory clubhouse and patio 1190sf to multifamily res Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 28, 2013 | Expiration date: June 28, 2013 | Permit id: 2013-017397 Ep | |||||
SCORE 100 Date: July 9, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 4, 2014 | Expiration date: September 4, 2014 | Permit id: 2014-064594 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 30, 2013 | Expiration date: October 30, 2013 | Permit id: 2013-017405 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 19, 2014 | Expiration date: March 19, 2014 | Permit id: 2013-017403 Ep | |||||
SCORE 100 Date: March 15, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 30, 2013 | Expiration date: October 30, 2013 | Permit id: 2013-017404 Ep | |||||
SCORE 100 214 Barton Springs Rd Austin Tx 78704 Tenant finishout to create multifamily res dwelling units and corridorsresidentail level 17 Date: May 28, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 9, 2015 | Expiration date: June 9, 2015 | Permit id: 2013-007868 Ep | |||||
SCORE 100 111 Sandra Muraida Way Austin Tx 78703 Interior remodel to existing multifamily parking garage to create private secure spacesspaces 456 457 Date: November 24, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: December 30, 2014 | Expiration date: December 30, 2014 | Permit id: 2014-125076 Ep | |||||
SCORE 100 Date: June 16, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 19, 2014 | Expiration date: June 19, 2014 | Permit id: 2014-062461 Ep | |||||
SCORE 100 Date: May 30, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 8, 2017 | Expiration date: June 8, 2017 | Permit id: 2017-054837 Ep | |||||
SCORE 100 Date: September 21, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: March 17, 2018 | Permit id: 2017-111705 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132999 Ep | |||||
SCORE 100 Date: March 21, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 19, 2016 | Expiration date: July 19, 2016 | Permit id: 2016-008813 Ep | |||||
SCORE 100 126 Mc Callen Pass Bldg Trash Austin Tx 78753 New trash compactor enclosure for multifamily res apts bldg dd Date: September 30, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-133006 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-133007 Ep | |||||
SCORE 100 Date: November 26, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-133003 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132981 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132982 Ep | |||||
SCORE 100 Date: February 27, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 21, 2017 | Expiration date: April 21, 2017 | Permit id: 2017-0228 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132993 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132994 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132995 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 3, 2015 | Expiration date: April 3, 2015 | Permit id: 2013-045925 Ep | |||||
SCORE 100 Date: May 30, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 8, 2017 | Expiration date: June 8, 2017 | Permit id: 2017-0548 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132989 Ep | |||||
SCORE 100 Date: May 30, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 8, 2017 | Expiration date: June 8, 2017 | Permit id: 2017-054842 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 2, 2015 | Expiration date: September 2, 2015 | Permit id: 2013-045924 Ep | |||||
SCORE 100 Date: June 10, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 15, 2015 | Expiration date: June 15, 2015 | Permit id: 2015-0700 Ep | |||||
SCORE 100 Date: January 6, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: February 16, 2015 | Permit id: 2014-000824 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132992 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101649 Ep | |||||
SCORE 100 Date: April 21, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 10, 2017 | Permit id: 2016-045576 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-133002 Ep | |||||
SCORE 100 Date: July 26, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Active | Expiration date: April 16, 2018 | Permit id: 2017-0917 Ep | |||||
SCORE 100 Date: August 8, 2012 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: July 23, 2013 | Expiration date: July 23, 2013 | Permit id: 2012-054332 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: September 25, 2015 | Expiration date: September 25, 2015 | Permit id: 2015-101653 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101655 Ep | |||||
SCORE 100 Date: January 7, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132979 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2013-045909 Ep | |||||
SCORE 100 Date: September 16, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101663 Ep | |||||
SCORE 100 Date: January 11, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 16, 2017 | Expiration date: May 16, 2017 | Permit id: 2015-150244 Ep | |||||
SCORE 100 422 W Riverside Dr Bldg Gar Austin Tx 78704 New shell bldg lower level first floor lease space 3932sf 2 mf units on 1st floor and parking garage 106675sf Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 9, 2016 | Expiration date: August 9, 2016 | Permit id: 2013-113649 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132987 Ep | |||||
SCORE 100 Date: May 25, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: May 27, 2016 | Expiration date: May 27, 2016 | Permit id: 2016-060952 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-1016 Ep | |||||
SCORE 100 Date: June 10, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 15, 2015 | Expiration date: June 15, 2015 | Permit id: 2015-070034 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 8, 2015 | Expiration date: October 8, 2015 | Permit id: 2015-101633 Ep | |||||
SCORE 100 Date: August 21, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101635 Ep | |||||
SCORE 100 Date: November 13, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 4, 2016 | Expiration date: August 4, 2016 | Permit id: 2015-132447 Ep | |||||
SCORE 100 Date: May 1, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 16, 2015 | Expiration date: June 16, 2015 | Permit id: 2015-051284 Ep | |||||
SCORE 100 Date: May 30, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 8, 2017 | Expiration date: June 8, 2017 | Permit id: 2017-054841 Ep | |||||
SCORE 100 Date: February 25, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132985 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132986 Ep | |||||
SCORE 100 Date: January 28, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: June 5, 2017 | Permit id: 2013-132984 Ep | |||||
SCORE 100 Date: September 16, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101659 Ep | |||||
SCORE 100 Date: September 16, 2015 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: October 1, 2015 | Expiration date: October 1, 2015 | Permit id: 2015-101661 Ep | |||||
SCORE 100 98 San Jacinto Blvd Unit Gar Austin Tx 78701 New mixed use basement storagechiller9088sf and garage 1st flr shell retail 9713sf lobbyoffices core building services and garage 2nd thru 5th floors garage 6th thru 31st floors core area and unit basics 32nd floor fitness library pool deck and amenity area and kitchen Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 23, 2010 | Expiration date: April 23, 2010 | Permit id: 2008-0938 Ep | |||||
SCORE 100 Date: August 22, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 7, 2017 | Expiration date: November 7, 2017 | Permit id: 2017-104745 Ep | |||||
SCORE 100 Date: November 3, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 17, 2016 | Expiration date: March 17, 2016 | Permit id: 2014-024449 Ep | |||||
SCORE 100 Date: January 28, 2014 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Expired | Expiration date: October 1, 2014 | Permit id: 2013-081118 Ep | |||||
SCORE 100 Date: January 11, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 18, 2017 | Expiration date: April 18, 2017 | Permit id: 2015-150245 Ep | |||||
SCORE 100 Date: May 30, 2017 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: June 8, 2017 | Expiration date: June 8, 2017 | Permit id: 2017-054838 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 23, 2015 | Expiration date: February 23, 2015 | Permit id: 2013-0459 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2014 | Expiration date: November 18, 2014 | Permit id: 2013-0459 Ep | |||||
SCORE 100 Date: October 24, 2016 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: November 16, 2016 | Expiration date: November 16, 2016 | Permit id: 2016-131017 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: April 14, 2010 | Expiration date: April 14, 2010 | Permit id: 2008-093811 Ep | |||||
SCORE 100 Date: January 30, 2009 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: August 19, 2010 | Expiration date: August 19, 2010 | Permit id: 2008-093818 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: February 3, 2015 | Expiration date: February 3, 2015 | Permit id: 2013-045918 Ep | |||||
SCORE 100 Date: December 12, 2013 Contractor: Mitch Permuy Permit type: Electrical permit | Permit status: Final | Completion date: March 10, 2015 | Expiration date: March 10, 2015 | Permit id: 2013-045922 Ep |