SCORE 56 South Capitol Street And Firth Sterling Avenue Se Washington Dc Dccr proposes to excavate 8 utility pothole locations for (ph-01 through ph-08) located south of 29 south capitol street se. Each excavation will be less than 8 feet deep using vac truck. All drilling generated waste will be drummed (solids and liquids) for offsite disposal. The work will take up to two weeks to complete; the work-zone will be removed at the end of each day, and will require modified work times of 8 pm to 5 am, and a dcra after hours permit will be obtained. This work will not impact trees, sidewalks, or bus stops. Date: February 23, 2017 Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: March 22, 2017 | Permit id: Pa201082 |