Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 753 N 43rd St Philadelphia Pa 191041465 Interior renovations to include replace ceiling third floor and selected areas in kitchen on all three floors. Related painting, flooring and patching throughout. Related mechanical, plumbing and electric permtis required. Date: June 14, 2011 Contractor: Mb Crafters Client: Barazani Leor Barazani Moshe | Permit type: Alteration permit | Permit status: Completed | Completion date: March 1, 2012 | Permit id: 347328 | |||||
SCORE 93 602 N 43rd St Philadelphia Pa 191041416 For the erection of an attached structure, size and location as shown on application plans. For use as single family household living with two (2) surface parking spaces. Date: June 23, 2014 Contractor: Mb Crafters Client: Li Qui Yang Yi | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 23, 2014 | Permit id: 529372 | |||||
SCORE 93 602 N 43rd St Philadelphia Pa 191041416 For the erection of an attached structure, size and location as shown on sealed submitted plans. For use as single family household living with two (2) surface parking spaces. Electrical, plumbing, mechanical, and fire suppression work requires additional permits. Call the inspector prior to starting work. Date: November 3, 2014 Contractor: Mb Crafters Client: Li Qui Yang Yi | Permit type: New construction permit | Permit status: Completed | Completion date: April 21, 2015 | Permit id: 557503 | |||||
SCORE 93 624 N 43rd St Philadelphia Pa 191041416 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: February 17, 2012 Contractor: Mb Crafters Permit type: Zoning permit | Permit status: Completed | Completion date: February 17, 2012 | Permit id: 344337 | |||||
SCORE 93 4122 Haverford Ave Philadelphia Pa 191041708 New installation erection of 4 story prefabricated modular construction as per plans and specifications checklist. With on site prepartion, foundation construction to include underpinning of adjacent foundation-bracing support of structure & temporary shoring of sidewalk requires special inspection by registered engineer. Roof deck and pilot house not part of this permit. Building fully sprinklered. Additional permits and inspections required : all separate connections outside scope of modular plan approval for electrical, plumbing, hvac, and sprinklers by licensed contractors. Date: April 5, 2013 Contractor: Mb Crafters Client: Barazani Mashe Barazani Leor | Permit type: New construction permit | Permit status: Completed | Completion date: January 24, 2014 | Permit id: 458755 | |||||
SCORE 93 43 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391261 | |||||
SCORE 93 4316 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391276 | |||||
SCORE 93 48 Brown St Philadelphia Pa 191392126 One oil tank removal from center of courtyard as per attached plan. Perform a confirmatory soil sampling of surrounding soil. Contigency plan in place in the case contaminated soils discovered. All work completed in accordance with padep ust removal guidelines. A certification & closure report to be submitted to inspector. Date: November 12, 2014 Contractor: Mb Crafters Client: West Village Apartment Lo | Permit type: Demolition permit | Permit status: Completed | Completion date: August 10, 2016 | Permit id: 573591 | |||||
SCORE 93 48 Brown St Philadelphia Pa 191392126 Level iii alterations and addition with complete change of occupancy to create a thirty-four (34) family dwelling on the basement, second and third floors and entry lobby at first floor with vacant shell commercial space on remainder of first floor as per approved plans. Building to be fully sprinklered. All subcontractors must be licensed and identified to inspector. Date: November 12, 2015 Contractor: Mb Crafters Client: West Village Apartment Lo | Permit type: Alteration permit | Permit status: Active | Completion date: October 24, 2017 | Permit id: 639743 | |||||
SCORE 93 4314 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391275 | |||||
SCORE 93 4308 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391272 | |||||
SCORE 93 4312 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391274 | |||||
SCORE 93 4302 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391269 | |||||
SCORE 93 4304 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391270 | |||||
SCORE 93 4306 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391271 | |||||
SCORE 93 4318 Wallace St Philadelphia Pa 19104 Relocation of lot lines for the new construction of (10) 3 story sfd townhomes. Date: March 5, 2012 Contractor: Mb Crafters Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 5, 2012 | Permit id: 391277 | |||||
SCORE 93 48 Brown St Philadelphia Pa 191392126 Level ii alterations with partial change of occupancy to fit out shell second floor space for a dialysis center as per approved plans. Building to be fully sprinklered. All subcontractors must be licensed and identified to inspector. Separate permits required for mep & fire suppression work separate permits required for mep & fire suppression work Date: November 12, 2015 Contractor: Mb Crafters Client: West Village Apartment Lo | Permit type: Alteration permit | Permit status: Completed | Completion date: August 9, 2016 | Permit id: 639750 |