Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 1026 Broadway Los Angeles Ca 90015 Fees are due to senate bill 1222. Pv2, roof mounted solar system t Date: September 9, 2016 Contractor: Masoor Nesar Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-179 | |||||
SCORE 65 1026 Broadway Los Angeles Ca 90015 San Diego Ca Fees are due to senate bill 1222. Pv2, roof mounted solar system t Date: September 9, 2016 Contractor: Masoor Nesar Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-179 | |||||
SCORE 65 928 Broadway Los Angeles Ca 90015 San Diego Ca Pv2, roof mounted solar system to an apartment building, total size 2 Date: April 10, 2017 Contractor: Masoor Nesar Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-180 |