Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 8 Florida Ave Ne Central Ut, Washington, Dc 20002 Install new 3 hr rated interior roll-up door in existing non load bearing 8 inch cmu wall inside the central utilities building. Create 10ft w x 9ft h opening in cmu wall and install new reinforced precast concrete lintel. Grout fill cmu cells w/no. 5 rebar at each side of opening. Date: November 8, 2013 Contractor: Marvin Turner Setty Associates Intl Client: Mark Dudley | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1401521 | |||||
SCORE 59 8 Florida Ave Ne Central Ut, Washington, Dc 20002 Install new 3 hr rated interior roll-up door in existing non load bearing 8 inch cmu wall inside the central utilities building. Create 10ft w x 9ft h opening in cmu wall and install new reinforced precast concrete lintel. Grout fill cmu cells w/no. 5 rebar at each side of opening. Date: November 8, 2013 Contractor: Marvin Turner Setty Associates Intl Client: Mark Dudley | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1401521 |