SCORE

MARK PARSLOE

ABOUT MARK PARSLOE

Mark Parsloe specializes in:

Mark Parsloe offers services:

Based on the information received from , associated with Mark Parsloe over the past .

If you are considering hiring Mark Parsloe for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Mark Parsloe has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
60 N Harvard St Boston Ma 02163
Remove and relocate an existing wood door frame and sidelights to a new location in the same area in a new wall. Relocate electrical devices patch prime and paint all new and affected work. Fabricate and install new free-standing wood casework and countertops for use with lateral files
Date:  November 25, 2013
Value:   $85,322
Contractor: Mark Parsloe

Client: Harvard College | Permit type: Renovations -interio | Current use: Other | Permit id: Sf306400 | Parcel: 2147483647
2013/11/258532210060 N Harvard St Boston Ma 02163Mark Parsloe
SCORE
100
25 Louders La Jamaica Plain Ma 02130
Remodeling of an existing bathroom. New bath tile and fixtures painting etc
Date:  October 7, 2014
Value:   $25,960
Contractor: Mark Parsloe

Client: Paulus Ronald R | Permit type: Renovations -interio | Current use: 1-2fam | Permit id: Sf413054 | Parcel: 1902507000
2014/10/072596010025 Louders La Jamaica Plain Ma 02130Mark Parsloe
SCORE
100
117 Western Av Boston Ma 02135
Remove a section of non-bearing partition wall between 2 existing closets to create space for a new atm (by harvard) new door frames flooring and painting. New lighting all necessary electrical and data work
Date:  December 22, 2016
Value:   $14,488
Contractor: Mark Parsloe

Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf662825
2016/12/2214488100117 Western Av Boston Ma 02135Mark Parsloe
SCORE
100
479 Commonwealth Av Boston Ma 02215
Remove and replace in-kind the existing entry door and frame to facilitate installation of a card access security system (by others) the new door and frame will be an exact match in size species and color swing and design as the existing door. The existing door grate will be saved and re-installed
Date:  December 22, 2016
Value:   $20,672
Contractor: Mark Parsloe

Client: Mass Institute Of Technology | Permit type: Renovations - exterior | Permit status: Open | Current use: Comm | Permit id: Sf650380 | Parcel: 0503901000
2016/12/2220672100479 Commonwealth Av Boston Ma 02215Mark Parsloe
SCORE
100
151 Commonwealth Av Boston Ma 02116
Work on the 3rd 4th and 5th floor to include framing electrical drywall painting cabinets doors and hardware upgrades sprinkler work and fa work
Date:  May 9, 2017
Value:   $295,815
Contractor: Mark Parsloe

Client: The Commonwealth Scl Inc | Permit type: Demolition - interior | Permit status: Open | Current use: Comm | Permit id: Sf698787 | Parcel: 0502937000
2017/05/09295815100151 Commonwealth Av Boston Ma 02116Mark Parsloe
SCORE
100
25 Louders La Boston Ma 02130
Remodeling of an existing bathroom. New bath tile and fixtures painting etc
Date:  October 7, 2014
Value:   $25,960
Contractor: Mark Parsloe

Client: Paulus Ronald R | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf413054 | Parcel: 1902507000
2014/10/072596010025 Louders La Boston Ma 02130Mark Parsloe
SCORE
100
Harvard Wy Boston Ma 02163
Remove a section of non-bearing wall install new millwork lighting carpet and painting
Date:  June 15, 2016
Value:   $77,335
Contractor: Mark Parsloe

Client: Harvard College | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf596276 | Parcel: 2200530000
2016/06/1577335100Harvard Wy Boston Ma 02163Mark Parsloe
SCORE
100
117 Western Av Boston Ma 02135
Remove non-bearing metal stud partition walls and drywall install new metal stud partition walls blocking and drywall. Fabricate and install new reception counter and printer cabinet compound prime and paint all new and affected work. Repair affected carpet tiles and act all electrical work and data wiring by harvard contractor.
Date:  July 14, 2014
Value:   $39,100
Contractor: Mark Parsloe

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf377530
2014/07/1439100100117 Western Av Boston Ma 02135Mark Parsloe
SCORE
100
25 Harvard Wy Boston Ma 02163
Remove existing non-bearing metal stud walls and drywall on one (1) office and one (1) closet to create open space for work cubicles (by others). Infill walls and soffit per plan. Patch and paint all new and affected work. Repair the existing act. Patch carpeting. All existing lighting ato be relocated by others. All electrical work by others.
Date:  July 29, 2014
Value:   $7,100
Contractor: Mark Parsloe

Client: Harvard College | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf389190 | Parcel: 2147483647
2014/07/29710010025 Harvard Wy Boston Ma 02163Mark Parsloe
SCORE
100
107 Park Dr Boston Ma 02215
Remove and replace the bathroom fixtures lights and accoustical cieling tiles in five (5) bathrooms. The new work includes removal and replacement of existing plumbing fixtures light fixtures and exhaust fans installation of new flooring and painting. New flooring is also included. No structural work will be done
Date:  October 4, 2012
Value:   $74,460
Contractor: Mark Parsloe

Client: Community Resource For Justice | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf187365 | Parcel: 0504271000
2012/10/0474460100107 Park Dr Boston Ma 02215Mark Parsloe
SCORE
100
N Harvard St Boston Ma 02163
Remove and relocate an existing wood door frame and sidelights to a new location in the same area in a new wall. Relocate electrical devices patch prime and paint all new and affected work. Fabricate and install new free-standing wood casework and countertops for use with lateral files
Date:  November 25, 2013
Value:   $85,322
Contractor: Mark Parsloe

Client: Harvard College | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf306400 | Parcel: 2200530000
2013/11/2585322100N Harvard St Boston Ma 02163Mark Parsloe
SCORE
100
355 Boylston St Boston Ma 02116
All work described hereafter only to take place on the north and east 5th floor mansard. Remove and replace in kind existing slate roofing flashings and gutters with new slate of the same color gauge and in the same design. All flashings and gutters to be copper. Remove and replace in kind all damaged woodwork with custom milled primed and painted solid mahogany. Remove and replace a total of six (6) existing vinyl replacement windows with six (6) new windows. The new windows are to be jb sash proper bostonian units. Remove and replace a fixed sigle pane plexi-glass skylight on the rear(north) facade with a new thermal pane fixed skylight of the same size/design. Paint all new woodwork and fire escape system on the 5th floor to existing colors/finishes. Clean and re-point the chimney. Clean off applied asphalt patching. Remove and replace in kind the door to the fire escape with a flush steel insulated door.
Date:  October 19, 2011
Value:   $155,854
Contractor: Mark Parsloe

Client: Mass Half-Way Houses Inc | Permit type: Renovations - exterior | Permit status: Expired | Current use: Comm | Permit id: Sf100641 | Parcel: 0501228000
2011/10/19155854100355 Boylston St Boston Ma 02116Mark Parsloe
SCORE
100
125 Western Av Allston Ma 02135
Renovation of 1 146 sf of existing office space install new non bearing metal stud walls drywall act doors and hardware. No change to exterior or egress painting sprinkler heads all to remain and be adjusted in height as necessary
Date:  October 22, 2015
Value:   $54,433
Contractor: Mark Parsloe

Client: Harvard College Pres&fellows | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf525890 | Parcel: 2200500000
2015/10/2254433100125 Western Av Allston Ma 02135Mark Parsloe
SCORE
100
117 Western Av Boston Ma
Remove non-bearing metal stud partition walls and drywall install new metal stud partition walls blocking and drywall. Fabricate and install new reception counter and printer cabinet compound prime and paint all new and affected work. Repair affected carpet tiles and act all electrical work and data wiring by harvard contractor.
Date:  July 14, 2014
Value:   $39,100
Contractor: Mark Parsloe

Permit type: Short form bldg permit | Expiration date: January 14, 2015 | Current use: Other | Permit id: Sf377530
2014/07/1439100100117 Western Av Boston MaMark Parsloe
SCORE
100
N Harvard St Boston Ma
Remove and relocate an existing wood door frame and sidelights to a new location in the same area in a new wall. Relocate electrical devices patch prime and paint all new and affected work. Fabricate and install new free-standing wood casework and countertops for use with lateral files
Date:  November 25, 2013
Value:   $85,322
Contractor: Mark Parsloe

Client: Harvard College | Permit type: Short form bldg permit | Expiration date: May 25, 2014 | Current use: Other | Permit id: Sf306400 | Parcel: 2200530000
2013/11/2585322100N Harvard St Boston MaMark Parsloe
SCORE
100
107 Park Dr Boston Ma
Remove and replace the bathroom fixtures lights and accoustical cieling tiles in five (5) bathrooms. The new work includes removal and replacement of existing plumbing fixtures light fixtures and exhaust fans installation of new flooring and painting. New flooring is also included. No structural work will be done
Date:  October 4, 2012
Value:   $74,460
Contractor: Mark Parsloe

Client: Community Resource For Justice | Permit type: Short form bldg permit | Expiration date: April 4, 2013 | Current use: Other | Permit id: Sf187365 | Parcel: 0504271000
2012/10/0474460100107 Park Dr Boston MaMark Parsloe
SCORE
100
125 Western Av Allston Ma
Renovation of 1 146 sf of existing office space install new non bearing metal stud walls drywall act doors and hardware. No change to exterior or egress painting sprinkler heads all to remain and be adjusted in height as necessary
Date:  October 22, 2015
Value:   $54,433
Contractor: Mark Parsloe

Client: Harvard College Pres | Permit type: Short form bldg permit | Expiration date: April 22, 2016 | Current use: Comm | Permit id: Sf525890 | Parcel: 2200500000
2015/10/2254433100125 Western Av Allston MaMark Parsloe
SCORE
100
25 Louders La Boston Ma
Remodeling of an existing bathroom. New bath tile and fixtures painting etc
Date:  October 7, 2014
Value:   $25,960
Contractor: Mark Parsloe

Client: Paulus Ronald R | Permit type: Short form bldg permit | Expiration date: April 7, 2015 | Current use: 1-2fam | Permit id: Sf413054 | Parcel: 1902507000
2014/10/072596010025 Louders La Boston MaMark Parsloe
SCORE
100
25 Harvard Wy Boston Ma
Remove existing non-bearing metal stud walls and drywall on one (1) office and one (1) closet to create open space for work cubicles (by others). Infill walls and soffit per plan. Patch and paint all new and affected work. Repair the existing act. Patch carpeting. All existing lighting ato be relocated by others. All electrical work by others.
Date:  July 29, 2014
Value:   $7,100
Contractor: Mark Parsloe

Client: Harvard College | Permit type: Short form bldg permit | Expiration date: January 29, 2015 | Current use: Other | Permit id: Sf389190 | Parcel: 2200530000
2014/07/29710010025 Harvard Wy Boston MaMark Parsloe
SCORE
100
151 Commonwealth Av Boston Ma
Work on the 3rd 4th and 5th floor to include framing electrical drywall painting cabinets doors and hardware upgrades sprinkler work and fa work
Date:  May 9, 2017
Value:   $295,815
Contractor: Mark Parsloe

Client: The Commonwealth Scl Inc | Permit type: Short form bldg permit | Expiration date: November 9, 2017 | Current use: Comm | Permit id: Sf698787 | Parcel: 0502937000
2017/05/09295815100151 Commonwealth Av Boston MaMark Parsloe
SCORE
100
355 Boylston St Boston Ma
All work described hereafter only to take place on the north and east 5th floor mansard. Remove and replace in kind existing slate roofing flashings and gutters with new slate of the same color gauge and in the same design. All flashings and gutters to be copper. Remove and replace in kind all damaged woodwork with custom milled primed and painted solid mahogany. Remove and replace a total of six (6) existing vinyl replacement windows with six (6) new windows. The new windows are to be jb sash proper bostonian units. Remove and replace a fixed sigle pane plexi-glass skylight on the rear(north) facade with a new thermal pane fixed skylight of the same size/design. Paint all new woodwork and fire escape system on the 5th floor to existing colors/finishes. Clean and re-point the chimney. Clean off applied asphalt patching. Remove and replace in kind the door to the fire escape with a flush steel insulated door.
Date:  October 19, 2011
Value:   $155,854
Contractor: Mark Parsloe

Client: Mass Halfway Houses Inc | Permit type: Short form bldg permit | Expiration date: April 19, 2012 | Current use: Comm | Permit id: Sf100641 | Parcel: 0501228001
2011/10/19155854100355 Boylston St Boston MaMark Parsloe
SCORE
100
117 Western Av Boston Ma
Remove a section of non-bearing partition wall between 2 existing closets to create space for a new atm (by harvard) new door frames flooring and painting. New lighting all necessary electrical and data work
Date:  December 22, 2016
Value:   $14,488
Contractor: Mark Parsloe

Permit type: Short form bldg permit | Expiration date: June 22, 2017 | Current use: Comm | Permit id: Sf662825
2016/12/2214488100117 Western Av Boston MaMark Parsloe
SCORE
100
Harvard Wy Boston Ma
Remove a section of non-bearing wall install new millwork lighting carpet and painting
Date:  June 15, 2016
Value:   $77,335
Contractor: Mark Parsloe

Client: Harvard College | Permit type: Short form bldg permit | Expiration date: December 15, 2016 | Current use: Other | Permit id: Sf596276 | Parcel: 2200530000
2016/06/1577335100Harvard Wy Boston MaMark Parsloe
SCORE
100
479 Commonwealth Av Boston Ma
Remove and replace in-kind the existing entry door and frame to facilitate installation of a card access security system (by others) the new door and frame will be an exact match in size species and color swing and design as the existing door. The existing door grate will be saved and re-installed
Date:  December 22, 2016
Value:   $20,672
Contractor: Mark Parsloe

Client: Mass Institute Of Technology | Permit type: Short form bldg permit | Expiration date: June 22, 2017 | Current use: Comm | Permit id: Sf650380 | Parcel: 0503901000
2016/12/2220672100479 Commonwealth Av Boston MaMark Parsloe
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.