Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 551 Atlantic Av Boston Ma 02110 This is a temporary art installation on the greenway as part of the design biennial boston. It will be in place for approximately 2 months during the summer. The installation consists of 18 decorative freestanding columns spaced on a 9 foot grid that have a steel and oak structure. Date: July 1, 2015 Contractor: Marie Adams Client: Massachusetts Turnpike | Permit type: Special events | Permit status: Open | Current use: Other | Permit id: Sf489370 | Parcel: 0304191000 | |||||
SCORE 59 551 Atlantic Av Boston Ma This is a temporary art installation on the greenway as part of the design biennial boston. It will be in place for approximately 2 months during the summer. The installation consists of 18 decorative freestanding columns spaced on a 9 foot grid that have a steel and oak structure. Date: July 1, 2015 Contractor: Marie Adams Client: Comm Of Mass De | Permit type: Short form bldg permit | Expiration date: January 1, 2016 | Current use: Other | Permit id: Sf489370 | Parcel: 0304090000 |