Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 3949 52nd St Nw, Washington, Dc 20016 Seven 7 geotechnical borings b-1 through b-7 with a 6-inch diameters will be drilled to depths ranging between 15 to feet or refusal with hollow stem augers. No monitoring well will be installed. Waste will be containerized in 55-gallon drums, tested and disposed of with cut soils and demolition debris during construction. Boreholes will be tremie-grouted with 2 lb bentonite: 1 gallon water slurry upon completion. The closest intersection is upton street nw and 52nd th street, nw. Date: March 30, 2015 Contractor: Marcolivier Tschibelu Client: Brent Shaw | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500225 |