SCORE 56 3001 Connecticut Ave Nw, Washington, Dc 20008 Federal property project - smithsonian institution phased project involving the following: phase 1 - perform site and structure demolition, install new undergroud utilities, build new building consisting of public restrooms at first level, event space at second level. Building is concrete slab on grade with elevated concrete second floor slab. Roof is wood and metal truss framed. Perform upgrades to existing electrical substation and equipment. Phase 2 - perform complete renovation of existing building, including rear addition. Fit out work consists of all new mep, fp, communications, and security systems. Building inclusive of 2 stop elevator. Date: October 21, 2016 Contractor: Marc Muller Si; Andy Miller Consigli Client: Marc Muller - Si | Permit type: New building | Permit status: Permit issued | Permit id: B1700119 |