SCORE 56 3001 Connecticut Ave Nw, Washington, Dc 20008 3 soil borings will be conducted to the south-east of the zoo police structure and 3 soil borings will be conducted to the north and south of the pavilion associated with the mane grill. These will be drilled to a depth of 15 feet, will have a diameter of 8 inches, and will be conducted using a 3. 25 inch inner diameter hollow stem auger. 2 borings, one to the south of the pavilion and one to the south-east of the zoo police building will be converted into groundwater monitoring piezometers with well covers flush with the ground surface. In addition, a test pit will be dug 6 feet deep with dimensions of 5 feet by 5 feet adjacent to the south-east side of the zoo police building. Date: November 18, 2015 Contractor: Marc Muller National Zoo Client: Marc Muller National Zoo | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600031 |