Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 68 48 Mt Pleasant St Cambridge, Ma Remodel of 3rd flr bathroom. Demo walls to suds and sub floor frame as needed,frame shower stall, insulate ceiling with closed cell spray foam insulate walls with fiberglass insulation rewire for lights, wall switches, gfi outlet exhaust fan plaster walls and ceiling install vanity and sink reuse existing door existing window to remain tile floor and shower enclosure Permit type: Addition/alteration | Completion date: May 28, 2015 | Current use: One-family | Parcel: 20127 | |||||
SCORE 68 14 Malcolm Rd Cambridge, Ma Demo the shower walls down to framing replace the shower pan and valve insulate the open shower walls with r-15 fiberglass insulation durock the shower walls and tile over install electric radiant floor heat replace the existing exhaust fan install new shower light fixture install new floor tile sink, toilet and shower to remain in existing locations replace the existing sink and toilet Permit type: Addition/alteration | Completion date: May 8, 2017 | Current use: Two-family | Permit id: 0 | Parcel: 23411014 | |||||
SCORE 68 Permit type: Building | Permit status: Issued | Expiration date: November 9, 2016 | Permit id: B16-000174 |