Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 4875 Pearl East Cr Boulder Co Remove ballast on 134 squares of roof, removal of existing epdm membrane roofing layer, remove any compromised wet insulation, instal replacement insulation (if needed), install new epdm layer, replace ballast material. Positive drainage required. Pre-reroof inspection and mid-roof inspection required. Date: August 30, 2011 Contractor: Llc P3484950 Client: Llc P3484950 | Applicant: Llc P3484950 | Permit type: Roofing | Permit status: Cmp | Completion date: November 22, 2011 | Current use: Office - admini |