Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 1611 45th St Nw, Washington, Dc 20007 Basement renovation, remove existing floor finishes and existing cabinets in bathroom, install new toilet flange. Add ceramic tile flooring in bathroom and shower. Remove and replace flooring in utility room, rec room and hallway. Adding shelving to linen closet, and painting. Date: July 13, 2017 Contractor: Lillian R Stewart Client: Philip A Salin | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1710835 |