SCORE 56 4 Michigan Ave Ne, Washington, Dc 20017 Furnish and install new italian travertine marble wall cladding on the four existing brick arches of the basilicas crossing dome to match existing travertine marble wall cladding installed in the 1960s on the masonry piers of the crossing dome below the existing 39 inch high marble cornice which separates the brick arches from the piers below. The bottom and the top of the existing brick arches are 61 feet and 106 feet respectively above the floor of the church. All interior work. No permanent mechanical, plumbing or electrical work. The temporary scaffold structure constructed under scaffold permit no. Sc1600045 issued january 26, 2016 will be used to facilitate this work. Date: October 24, 2016 Client: Kevin A. Kavanaugh Basilica -National Shrine -Immaculate Concept | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1700345 |