Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 25 2599 Block Of M Street Nw Washington Dc Excavate and remove 4 length of 48" water main to provide access for crew to replace interior seals under dc water contract #100240 Date: June 25, 2012 Contractor: Keith Dinardo Dc Water Client: Dc Water (diem-Chau Du) | Permit type: Excavation; repair water main line | Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | |||||
SCORE 79 25 2599 Block Of M Street Nw Washington Dc Excavate and remove 4 length of 48" water main to provide access for crew to replace interior seals under dc water contract #100240 Date: June 25, 2012 Contractor: Keith Dinardo Dc Water Client: Dc Water (diem-Chau Du) | Permit type: Excavation; repair water main line | Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | |||||
SCORE 79 Contractor: Keith Dinardo Dc Water Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 79 25 2599 Block Of M Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; dc water ( a utility co.) contract #1002 - internal joint repairs - 48" water main - mainlineing service inc. Is the contractor- deposit and inspection fee waived; excavation and remove 4 length of 48 inch water main to provide access for crew to replace interior seals this work is authorized from monday through friday 6: am to 3: pm and saturday from 8: am to 6: pm Date: June 27, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: September 30, 2012 | Permit id: Pa72036 | |||||
SCORE 79 24 2499 Block Of M Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; dc water ( a utility co.) contract #1002 - internal joint repairs - 48" water main - mainlining services is the contractor - deposit fee waived; excavate and remove 4 length of 48" pipe to provide acess for crews to replace interior seals this work is authorized from monday through friday 6: am to 3: pm and saturday from 8: am to 6: pm Date: June 27, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: September 30, 2012 | Permit id: Pa72041 | |||||
SCORE 79 2115 2199 Block Of M Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; dc water ( utility co.) contract #1002 - internal joint repairs - 48" water main - - mainlining services is the contractor: deposit fee waived; excavate to remove 4 foot long spool piece from 48 inch watermain to provide access for crew to replace interior seals this work is authorized from monday through fridays from 6: am to 3: pm and sat from 8: am to 6; pm Date: June 27, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: September 30, 2012 | Permit id: Pa72043 | |||||
SCORE 79 2115 2199 Block Of M Street Nw Washington Dc 1st - expiration of permit number pa 72043: ( 72043r1=75453) ; refer to approved traffic control plan (tcp) for permitted hours of work; dc water ( utility co.) contract #1002 - internal joint repairs - 48" water main - - mainlining services is the contractor: deposit fee waived; excavate to remove 4 foot long spool piece from 48 inch watermain to provide access for crew to replace interior seals this work is authorized from monday through fridays from 6: am to 3: pm and sat from 8: am to 6; pm Date: September 26, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: November 29, 2012 | Permit id: Pa72043-R1 | |||||
SCORE 79 24 2499 Block Of M Street Nw Washington Dc 1st - extension of permit number #72041: (72041r1=75454); refer to approved traffic control plan (tcp) for permitted hours of work; dc water ( a utility co.) contract #1002 - internal joint repairs - 48" water main - mainlining services is the contractor - deposit fee waived; excavate and remove 4 length of 48" pipe to provide acess for crews to replace interior seals this work is authorized from monday through friday 6: am to 3: pm and saturday from 8: am to 6: pm Date: September 26, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: November 29, 2012 | Permit id: Pa72041-R1 | |||||
SCORE 79 25 2599 Block Of M Street Nw Washington Dc 1st - extension of permit number pa72036: (72036r1=75455); refer to approved traffic control plan (tcp) for permitted hours of work; dc water ( a utility co.) contract #1002 - internal joint repairs - 48" water main - mainlineing service inc. Is the contractor- deposit and inspection fee waived; excavation and remove 4 length of 48 inch water main to provide access for crew to replace interior seals this work is authorized from monday through friday 6: am to 3: pm and saturday from 8: am to 6: pm Date: September 26, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: November 29, 2012 | Permit id: Pa72036-R1 | |||||
SCORE 79 Canal Road Nw And Foxhall Road Nw Washington Dc Pave two water main access pits, each 8 x 10, in the left travel and left turning lane on the east bound side of canal road, 4 feet east of fox hall, at the light in front of georgetown university entrance Date: October 17, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: December 15, 2012 | Permit id: Pa75306 | |||||
SCORE 79 Canal Road Nw And Foxhall Road Nw Washington Dc 1st - extension of permit number pa75306 (75306r1=77569); pave two water main access pits, each 8 x 10, in the left travel and left turning lane on the east bound side of canal road, 4 feet east of fox hall, at the light in front of georgetown university entrance Date: December 14, 2012 Contractor: Keith Dinardo Dc Water Permit status: Permit expired | Expiration date: January 15, 2013 | Permit id: Pa75306-R1 | |||||
SCORE 79 Contractor: Keith Dinardo Dc Water Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 |