Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 76 S 5 E, Salt Lake City, Ut 841111801 Ballasted roof area: push back ballast, remove existing membrane, install carlisle . 0 mil. Epdm over existing insulation, terminate up parapet walls, install new termination bar. Outside ledges: remove existing membrane & insulation, install 3" insulation, adhere carlisle . 0 mil epdm, install new drip edge. Upper roof: coat existing membrane with carlisle cav-grip primer, fully adhere 115 mil fleeceback epdm over existing roof using carlisle fast adhesive, properly flash walls and penetrations, clean and haul away debris. Date: October 11, 2016 Contractor: Jrc Incorporated Of Tennessee Permit type: Roofing | Permit status: Inspections | Permit id: Bld2016-09146 |