SCORE 84 Permit type: Swimming-pool/spa | Permit status: Cofo issued | Current use: 1 or 2 family dwelling | Permit id: 13047-20000-005 | |||||
SCORE 84 Permit type: Grading | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13030-20000-028 | |||||
SCORE 84 Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13030-20000-028 | |||||
SCORE 84 Permit status: Cofo issued | Current use: 1 or 2 family dwelling | Permit id: 13047-20000-005 | |||||
SCORE 84 1 Huntington Av Boston Ma All impairments shall be coordinated with the buildings listed ;nfpa 241 coordinator so that only one zone is impaired at any given time within the building. Date: September 16, 2016 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk626955 | Parcel: 0400985000 | |||||
SCORE 84 8 Boylston St Boston Ma Johnny was - relocate 17 sprinklers to accomodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Date: September 20, 2016 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk629408 | |||||
SCORE 84 1 Huntington Av Boston Ma All impairments shall be coordinated with the buildings impairment coordinator so that only one zone shall be impaired at any given time within the building.. Date: September 20, 2016 Contractor: Joshua Silvia Client: Copley Place Primary | Permit type: Bfd sprinkler system | Permit id: Sprk622446 | Parcel: 0400985200 | |||||
SCORE 84 1 Huntington Av Boston Ma Wayfair phase 5 - relocate 231 sprinklers in tower 1 1st floor. Relocate sprinklers in tower 3 2nd floor. Temporary uprights will be provided once ceiling is removed. Work to be performed in accordance with nfpa 13 and crm 780. Date: September 26, 2016 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk638836 | Parcel: 0400985000 | |||||
SCORE 84 Huntington Av Boston Ma Only one zone shall be impaired at any given time within the building impairment shall be scheduled with the buildings listed nfpa 241 coordinator. Date: October 11, 2016 Contractor: Joshua Silvia Client: Lho Backstreets Lessee Llc | Permit type: Bfd sprinkler system | Permit id: Sprk636737 | Parcel: 0401067010 | |||||
SCORE 84 361 Newbury St Boston Ma Regus 361 newbury - relocate 3 sprinklers on the 3rd 4th and 5th floor (total) to accommodate new wall locations. Relocate of 4" main to accommodate new ceiling height. Work to be done in accordance with nfpa 13 & cmr 780. Date: October 20, 2016 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk644063 | |||||
SCORE 84 101 Seaport Bl Boston Ma Juice press - relocate 9 sprinklers to accommodate new wall locations. Work to be done in accordance with nfpa 13 and cmr 780. One floor zone at a time. Date: October 20, 2016 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk645111 | Parcel: 0602640030 | |||||
SCORE 84 101 Seaport Bl Boston Ma Soul cycle - relocate 47 sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780 Date: October 26, 2016 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk646582 | Parcel: 0602640030 | |||||
SCORE 84 1 Huntington Av Boston Ma Wolford - relocate sprinklers to accommodate new wall locations. Provide temp uprights once existing ceiling is removed. Work to be performed in accordance with nfpa 13 and cmr 780. Date: October 27, 2016 Contractor: Joshua Silvia Client: Copley Place Primary | Permit type: Bfd sprinkler system | Permit id: Sprk649216 | Parcel: 0400985200 | |||||
SCORE 84 1 Copley Pl Boston Ma State street t1f6 defit - disconnect preaction valve and tie in system to wet piping. Remove preaction valve. System will now be fed with a normal wet pipe system. Work to be performed in accordance with nfpa 13 and cmr 780. Date: October 27, 2016 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk649040 | Parcel: 0400985000 | |||||
SCORE 84 1 Huntington Av Boston Ma Legal seafood service - replace sprinklers in the kitchen that are missing plates and or caked with dust. Work to be in accordance with nfpa 13 and cmr 780. (no more than one floor off at a time) Date: September 15, 2016 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk626939 | Parcel: 0400985000 | |||||
SCORE 84 8 Boylston St Boston Ma Polo ralph lauren - relocate 54 sprinkler heads to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Date: July 27, 2016 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk613533 | |||||
SCORE 84 8 Boylston St Boston Ma Shinola - prudential center - relocate 18 sprinkler heads to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Date: September 7, 2016 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk622448 | |||||
SCORE 84 8 Boylston St Boston Ma Dunkin donuts - relocate sprinklers to acommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Work to be done one floor zone at a time. ;no occupancy in impaired zone. Date: August 29, 2016 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk630029 | |||||
SCORE 84 1 Huntington Av Boston Ma Installation shall be in accordance with the isd approved shop drawings 7 cmr and nfpa 13. Coordinate impairment with the building owners listed;nfpa 241 impairment coordinator so that no more than one sprinkler zone is impairment at any given time. Date: April 3, 2017 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk683360 | Parcel: 0400985000 | |||||
SCORE 84 1 Huntington Av Boston Ma Coordinate impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone is impaired during this scheduled impairment. Work to be performed in accordance with nfpa 13 and crm 780. Date: May 24, 2017 Contractor: Joshua Silvia Client: Copley Place Primary | Permit type: Bfd sprinkler system | Permit id: Sprk699205 | Parcel: 0400985200 | |||||
SCORE 84 Newbury St Boston Ma No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate sprinkler impairment with the buildings nfpa 241 impairment coordinator. Date: May 24, 2017 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk699258 | |||||
SCORE 84 1 Huntington Av Boston Ma Coordinate sprinkler impairment with the buildings nfpa 241 impairment coordinator. Note only one sprinkler zone can be impaired at any time within the building. Date: May 24, 2017 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk704794 | Parcel: 0400985000 | |||||
SCORE 84 1 Huntington Av Boston Ma Coordinate impairment with the buildings nfpas ;241 impairment coordinator. Date: May 24, 2017 Contractor: Joshua Silvia Client: Copley Place Primary | Permit type: Bfd sprinkler system | Permit id: Sprk694650 | Parcel: 0400985200 | |||||
SCORE 84 2036 District Av Dorchester Ma Ulta - relocate approximately 124 sprinklers to accommodate new wall & ceiling locations. Work to be performed in accordance with nfpa 13 and cmr 780. This is one of many tenants in a strip mall. The system can be zoned out and leave the other tenants live. Date: June 20, 2017 Contractor: Joshua Silvia Client: Allstate Road (edens) Llc | Permit type: Bfd sprinkler system | Permit id: Sprk715980 | Parcel: 0703497000 | |||||
SCORE 84 1 Huntington Av Boston Ma Christian louboutin -;replace existing pendants;with uprights once ceiling is removed. Relocate approximately 32 sprinkler heads sprinkler heads into new ceiling. 64 heads total. Work to be performed in accordance with nfpa 13 and crm 780. Date: June 20, 2017 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk713132 | Parcel: 0400985000 | |||||
SCORE 84 2355 Northern Av Boston Ma The grand scorpion bar - relocate sprinklers on the 1st 2nd and 3rd floor to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. This tenant has its own isolation valve on each floor so the system can be worked on without affecting the other tenants. Date: June 20, 2017 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk716000 | Parcel: 0602640020 | |||||
SCORE 84 1 Huntington Av Boston Ma Wayfair phase 6b - provide temp uprights once ceiling is removed in tower 2 floor 4&5 tower 3 floor 5&6. The relocate 6 sprinklers into new ceiling grid once installed. Work to be performed in accordance with nfpa 13 and crm 780. Date: March 22, 2017 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk688791 | Parcel: 0400985000 | |||||
SCORE 84 85 Seaport Bl Boston Ma Coordinate sprinkler impairment with the buildings nfpa 241 impairment coordinator. Date: June 26, 2017 Contractor: Joshua Silvia Client: Watermark Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk721695 | Parcel: 0602640060 | |||||
SCORE 84 1 Huntington Av Boston Ma Saint laurent - provide temp uprights once ceiling is removed. Relocate into new ceiling once installed. Approximately 74 heads total. Work to be performed in accordance with nfpa 13 and crm 780. (no more than one floor off at a time) Date: March 22, 2017 Contractor: Joshua Silvia Client: Copley Place Primary | Permit type: Bfd sprinkler system | Permit id: Sprk683374 | Parcel: 0400985200 | |||||
SCORE 84 8 Boylston St Boston Ma No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241;impairment coordinator. Date: January 24, 2017 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk667994 | |||||
SCORE 84 Huntington Av Boston Ma Westin copley fitness center - relocate approximately 35 sprinkler in the new 5th floor fitness center. Work to be performed in accordance with nfpa 13 and cmr 780. Date: January 27, 2017 Contractor: Joshua Silvia Client: Lho Backstreets Lessee Llc | Permit type: Bfd sprinkler system | Permit id: Sprk670569 | Parcel: 0401067010 | |||||
SCORE 84 101 Seaport Bl Boston Ma Bluemercury - relocate 24 sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 7 (no more than one floor off at a time - comply with the requirements of nfpa 13 (2013)) Date: March 20, 2017 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk683026 | Parcel: 0602640030 | |||||
SCORE 84 8 Boylston St Boston Ma Earls kitchen pru - relocate 139 sprinklers into new ceiling layout. Provide new dry system on exterior canopy on the 2nd floor. Work to be performed in accordance with nfpa 13 and cmr 780. Date: November 22, 2016 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk657513 | |||||
SCORE 84 4 Copley Pl Boston Ma No other zone shall be impaired in the building during this scheduled impairment coordinate impairment with the buildings impairment coordinator. Installation shall be in accordance with 7 cmr nfpa 13 and isd approved shop drawings. Date: December 27, 2016 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk658160 | Parcel: 0400985000 | |||||
SCORE 84 55 Boston Wharf Rd Boston Ma Tikkaway grill - relocate approximately 12 sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 78. Date: December 13, 2016 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk660946 | Parcel: 0602640030 | |||||
SCORE 84 2 Copley Pl Boston Ma Wayfair phase 6 demo - turn existing pendents to uprights on the 6th and 7th floor of tower 2. Remove 32 inergen tanks on the 6th floor and extend wet sprinklers pipe into the room. Work to be performed in accordance with nfpa 13 and cmr 780. Date: January 5, 2017 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk668374 | Parcel: 0400985000 | |||||
SCORE 84 1 Huntington Av Boston Ma Wayfair phase 6 - relocate 375 sprinklers in tower floor 6 tower 2 floor 7. Relocate a hose cabinet in tower 2 floor 6. Work to be performed in accordance with nfpa 13 and crm 780. Date: February 23, 2017 Contractor: Joshua Silvia Client: Copley Place Primary | Permit type: Bfd sprinkler system | Permit id: Sprk683001 | Parcel: 0400985200 | |||||
SCORE 84 Date: January 12, 2017 Contractor: Joshua Silvia Client: Mass Turnpike Authority | Permit type: Bfd sprinkler system | Permit id: Sprk663020 | Parcel: 0400985000 | |||||
SCORE 84 144 Newbury St Boston Ma Lush - relocate approximately 4 sprinkler to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Bfd paid detail required Date: July 12, 2017 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk720750 | |||||
SCORE 84 786 Boylston St Boston Ma Fendi @ saks 5th ave - relocate 4 sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. The first floor can be isolated from the second floor Date: July 12, 2017 Contractor: Joshua Silvia Permit type: Bfd sprinkler system | Permit id: Sprk727253 | |||||
SCORE 84 54 Seaport Bl Boston Ma Mr. Sids - relocate approximately sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Date: July 12, 2017 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk724367 | Parcel: 0602640020 | |||||
SCORE 84 1 Huntington Av Boston Ma Tods -replace existing pendants with uprights once ceiling is removed. Relocate approximately 25 pendant sprinkler heads into new ceiling. Approximately heads total. Work to be performed in accordance with nfpa 13 and crm 780. Date: July 12, 2017 Contractor: Joshua Silvia Client: Copley Place Primary | Permit type: Bfd sprinkler system | Permit id: Sprk724262 | Parcel: 0400985200 | |||||
SCORE 84 2355 Northern Av Boston Ma Cafe nero - relocate approximately 11 sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Date: July 12, 2017 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk726417 | Parcel: 0602640020 | |||||
SCORE 84 2355 Northern Av Boston Ma Bonobos guide shop - relocate approximately 16 sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Date: July 12, 2017 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk724381 | Parcel: 0602640020 | |||||
SCORE 84 2355 Northern Av Boston Ma Seaport barber - relocate approximately 8 sprinklers to accommodate new wall locations. Work to be performed in accordance with nfpa 13 and cmr 780. Date: July 12, 2017 Contractor: Joshua Silvia Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk724376 | Parcel: 0602640020 |