Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 78 Hereford St Boston Ma 02115 Demo bathroom complete except tub to remain. Supply rough framing fire blocking rough electrical and plumbing. Insulate blue board cement board and plaster. Tile and grout. All finishes and painting. Permit type: Demolition - interior | Permit status: Open | Current use: Multi | Permit id: Sf653464 | |||||
SCORE 78 Hereford St Boston Ma 02115 Demo bathroom complete and remove debris. Supply and install all rough carpentry electrical plumbing. Apply insulation blue board cement board plaster and tile. Install all finish carpentry electrical plumbing and painting. Work performed in unit # 2 Client: Levine M | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Multi | Permit id: Sf448522 | Parcel: 0503067000 | |||||
SCORE 78 Hereford St Boston Ma Demo bathroom complete and remove debris. Supply and install all rough carpentry electrical plumbing. Apply insulation blue board cement board plaster and tile. Install all finish carpentry electrical plumbing and painting. Work performed in unit # 2 Client: Levine M | Permit type: Short form bldg permit | Expiration date: August 19, 2015 | Current use: Multi | Permit id: Sf448522 | Parcel: 0503067000 | |||||
SCORE 78 41 Greenville St Somerville Ma 3rd. Floor remodel add full bath, update electrical as needed, strip wall paper, patch walls and ceilings as needed, prep paint all walls and ceilings, all existing wood work to remain and be painted. Remove all related debris from site. Permit type: Building | Permit status: Issued | Expiration date: October 15, 2015 | Permit id: B14-000966 | |||||
SCORE 78 201 College Ave Somerville Ma Frame ext. Walls, framing for bathrooms and new bathrooms, new kitchen, install new replacement windows. Permit type: Building | Permit status: Issued | Expiration date: December 18, 2015 | Permit id: B14-001076 | |||||
SCORE 78 21 Morton St Somerville Ma Remodel bathroom, replace cabinets and counter tops, upgrade electrical as needed, patch and skim walls and ceilings as needed, install 5 interior doors, install hardwood flooring and paint. - unit 1 Permit type: Building | Permit status: Issued | Expiration date: March 3, 2016 | Permit id: B14-001160 | |||||
SCORE 78 Hereford St Boston Ma Demo bathroom complete except tub to remain. Supply rough framing fire blocking rough electrical and plumbing. Insulate blue board cement board and plaster. Tile and grout. All finishes and painting. Permit type: Short form bldg permit | Expiration date: May 15, 2017 | Current use: Multi | Permit id: Sf653464 |