Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 81 ![]() ![]() Client: Nis Peterson | Client Address: 205 West 57th Street New York Ny 10001 | Client Phone: (212) 247-2603 | Client Company: Osborne Tenants Corp. | Permit status: Initial | Permit id: 100406712 | |||||
SCORE 81 ![]() ![]() Client: Nis Peterson | Client Address: 205 West 57th Street New York Ny 10001 | Client Phone: (212) 247-2603 | Client Company: Osborne Tenants Corp. | Permit status: Initial | Permit id: 100406712 | |||||
SCORE 81 7791 Seaport Bl Boston Ma Installation in-accordance with the requirements of 7 cmr and nfpa 13. No;other sprinkler zone can be impaired during this scheduled floor impairment. ![]() ![]() Client: Watermark Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk617495 | Parcel: 0602640060 | |||||
SCORE 81 125 Summer St Boston Ma Coordinate impairment with the buildings impairment coordinator (per nfpa 241) so that only one;zone is impaired at any given time. Installation per the requirements of 7 cmr and nfpa 13. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk633558 | |||||
SCORE 81 53 State St Boston Ma New upright sprinkler system will be installed which will be coordinated around new ductwork. Once the new system installed and tied in the old will be demolished. When the new ceilings are installed we will then relocate the sprinklers into the new ceiling. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk621308 | |||||
SCORE 81 3 Brookline Av Boston Ma The fire protection work consists of turning the 43 existing pendent sprinkler heads to upright sprinkler heads once the ceilings are demolished. The work is on the 9th floor of the feldberg reisman complex. ![]() ![]() Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk652967 | Parcel: 0401862000 | |||||
SCORE 81 425 Boylston St Boston Ma ;installation per the requirements of 7 cmr and nfpa 13...... Only one zone shall be impaired within the building at any time. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk617077 | |||||
SCORE 81 3 Brookline Av Boston Ma The fire protection work consists of relocating the existing sprinkler heads in the construction space. Fifty-three sprinkler heads outlets will be relocated to conform to new architectural layout.; ![]() ![]() Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk670859 | Parcel: 0401862000 | |||||
SCORE 81 ![]() ![]() Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk684484 | Parcel: 0602640020 | |||||
SCORE 81 Seaport Bl Boston Ma No other sprinkler zones shall be impaired during this scheduled impairment. Coordinate impairment with the buildings listed nfpa 241 impairment coordinator. ![]() ![]() Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk684478 | Parcel: 0602640020 | |||||
SCORE 81 3 Brookline Av Boston Ma Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone within the building is impaired during this scheduled impairment. ![]() ![]() Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk692222 | Parcel: 0401862000 | |||||
SCORE 81 3 Longwood Av Boston Ma The fire protection work consists of installing roughly new 1 sprinkler heads for temporary protection. Once the new temporary sprinklers are tied in the old temporary will be demod. Once the new ceilings are in the new temporary sprinklers will be turned into the ceiling where applicable. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk699170 | |||||
SCORE 81 1 Federal St Boston Ma The fire protection work consists of turning up 23 sprinkler heads for temporary protection. Once the new ceilings are in the temporary sprinklers will be turned into the ceiling where applicable. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk702833 | |||||
SCORE 81 South St Boston Ma Coordinate impairment with the buildings nfpas ;241 impairment coordinator. Only one sprinkler zone shall be impaired at any given time. ![]() ![]() Client: Sixty South Street Limited | Permit type: Bfd sprinkler system | Permit id: Sprk694100 | Parcel: 0304300010 | |||||
SCORE 81 2355 Northern Av Boston Ma The fire protection work consists of relocating 196 sprinkler heads on the 2nd floor to conform to the new bowling alley and restaurant architectural layout. ![]() ![]() Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk710932 | Parcel: 0602640020 | |||||
SCORE 81 Milk St Boston Ma The fire protection work consists of relocating 6 sprinkler heads to conform with new architectural layout. The 10th floor zone will be shut off for less than 8 hour per day for the sprinkler work to occur. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk655025 | |||||
SCORE 81 222 Berkeley St Boston Ma The fire protection work consists of turning up the existing sprinkler system for temporary protection in the roughly 14 2 square feet construction space. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk720723 | Parcel: 0401096000 | |||||
SCORE 81 5 Boylston St Boston Ma The fire protection work consists of turning up the existing sprinkler system for temporary protection in the roughly 30 square feet construction space. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk720724 | Parcel: 0401092000 | |||||
SCORE 81 201 Washington St Boston Ma The fire protection work consists of removing the temporary protection covering the 1 487 sqft space once new temporary sprinklers are installed. When the new ceilings are in then 26 heads will be dropped into the new ceiling. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk710924 | |||||
SCORE 81 25992601 Beacon St Brighton Ma Coordinate impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone is impaired at during this scheduled impairment.;construction area;shall have heat detectors and shall not be occupied. ![]() ![]() Client: Boston College Trs Of | Permit type: Bfd sprinkler system | Permit id: Sprk712741 | Parcel: 2102473001 | |||||
SCORE 81 5 Boylston St Boston Ma The sprinkler work consists of relocating 28 concealed sprinklers adding 7 new concealed sprinklers and replacing;one upright sprinkler with pendant type once the new ceiling is in for the new architectural layout. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk722959 | Parcel: 0401092000 | |||||
SCORE 81 201 Washington St Boston Ma The fire protection work consists of adding four sprinkler heads and relocating 26 sprinkler heads once the new ceiling is in. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk721967 | |||||
SCORE 81 2 Clarendon St Boston Ma The fire protection work consists relocating 42 sprinkler heads once the new ceiling is in. ![]() ![]() Client: Bp Hancock Llc | Permit type: Bfd sprinkler system | Permit id: Sprk724581 | Parcel: 0401134000 | |||||
SCORE 81 3 Brookline Av Boston Ma The fire protection work consists of removing the existing sprinkler system once the temporary heat detectors are tested and approved by bfd in the construction space. Once the new ceilings are in 18 new sprinkler heads will be dropped into the new ceilings. ![]() ![]() Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk721492 | Parcel: 0401862000 | |||||
SCORE 81 24 Cummington Ma Boston Ma Work consists of removing the existing sprinkler system components;in the 2 592 sqft construction space the rest of the floor sprinklers will remain in place. Then the new 37 sprinklers will then be piped in. The area will be impaired daily;for roughly 2 months. All zones to be back in operation at end of work day. Per nfpa stands. ![]() ![]() Client: Boston University Trsts Of | Permit type: Bfd sprinkler system | Permit id: Sprk720752 | Parcel: 2100288000 | |||||
SCORE 81 3 Brookline Av Boston Ma No other sprinkler zone in the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241;impairment coordinator. Installation shall be in accordance with the requirements of 7 cmr and nfpa 13. ![]() ![]() Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk672700 | Parcel: 0401862000 | |||||
SCORE 81 22 Boston Wharf Rd Boston Ma Demo of small (roughly 1 0 sq ft) roof level sprinkler system demo of 8th floor (top existing floor) sprinkler system covering 25 6 sq ft demo of portions of the 7th floor sprinkler system. New sprinkler lines consisting of 78 sprinklers will then be installed in the demolished area. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk655035 | |||||
SCORE 81 3 Brookline Av Boston Ma During this scheduled sprinkler impairment no other sprinkler zone within the building shall be impaired. Coordinate impairment with the buildings listed nfpa 241 impairment coordinator. ![]() ![]() Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk672711 | Parcel: 0401862000 | |||||
SCORE 81 53 State St Boston Ma No other;sprinkler zone shall be;impaired in the building during this scheduled impairment coordinate impairment with the buildings nfpa 241;impairment coordinator. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk686448 | |||||
SCORE 81 116 Huntington Av Boston Ma The fire protection work consists of relocating 32 existing sprinkler heads and adding 19 new sprinkler heads on the 5th floor to conform to the new architectural layout. ![]() ![]() Client: Columbia Reit-116 Huntington | Permit type: Bfd sprinkler system | Permit id: Sprk677729 | Parcel: 0401013010 | |||||
SCORE 81 53 State St Boston Ma Coordinate sprinkler impairments with the buildings listed nfpa 241 impairment coordinator.; only one sprinkler zone shall be impaired at; any given time in the building ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk686453 | |||||
SCORE 81 State St Boston Ma The fire protection work consists of relocating the existing sprinkler heads on the 0 sq. Ft. 18th floor to conform to the new architectural layout. ![]() ![]() Client: Anbeca Llc | Permit type: Bfd sprinkler system | Permit id: Sprk673108 | Parcel: 0303685000 | |||||
SCORE 81 111 Huntington Av Boston Ma The fire protection work consists of relocating 22 sprinkler heads and adding 8 sprinkler heads to conform to new architectural layout. The 29th floor zone will be shut off for less than 8 hour per day for the sprinkler work to occur. ![]() ![]() Client: Bp 111 Huntington Av Lessee | Permit type: Bfd sprinkler system | Permit id: Sprk655017 | Parcel: 0401037500 | |||||
SCORE 81 1 High St Boston Ma No other sprinkler zone shall be impaired in the building during this scheduled impairment. Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator. Installation shall be in accordance with the requirements of 7 cmr and nfpa 13 and isd approved shop drawings. ![]() ![]() Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk666635 | Parcel: 0304408000 | |||||
SCORE 81 1 High St Boston Ma Only one sprinkler zone may be impaired at any time within the building.... Coordinated sprinkler impairment with the buildings listed nfpa 241 impairment coordinator..... Installation shall be in accordance with the requirements of 7 cmr and nfpa 13 and isd approved shop drawings. ![]() ![]() Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk666636 | Parcel: 0304408000 | |||||
SCORE 81 1 Federal St Boston Ma Only one sprinkler zone shall be scheduled to be impaired in the building at any time and shall be coordinated;with the;buildings listed nfpa 241 impairment coordinator. ![]() ![]() Client: The Landmark Condo Assn | Permit type: Bfd sprinkler system | Permit id: Sprk678911 | Parcel: 0304406000 | |||||
SCORE 81 3 A St Boston Ma Only one sprinkler zone may be impaired at any time within the building.... Coordinated sprinkler impairment with the buildings listed nfpa 241 impairment coordinator..... Installation shall be in accordance with the requirements of 7 cmr and nfpa 13 and isd approved shop drawings. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk666631 | |||||
SCORE 81 1 Post Office Sq Boston Ma Installation in-accordance with the requirements of 7 cmr and nfpa 13. No;other sprinkler zone can be impaired during this scheduled floor impairment. Work to be done off hours. ![]() ![]() Permit type: Bfd sprinkler system | Permit id: Sprk617482 |