Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 63 Parcel: 32009 0012 | |||||
SCORE 63 111 Fairway Dr Newton Ma Basement remove water damage wallboard and replace. Install french drain. Insulate perimeter. No structural Parcel: 31027 0009 | |||||
SCORE 63 Parcel: 82006 0011 |