SCORE 68 1255 22nd Street Nw Washington Dc The project will consist of 2 phases. The first phase includes the renovation of the existing building that is located at 1255 22nd street nw. The second phase will be built on lot 194 (currently an existing parking lot located behind the existing phase 1 building), and is subject to our alley closing approval that is currently in process. The phase 2 building is planned to span over the to-be-closed existing alley and connect to the existing phase 1 building. As part of our application to ddot, we plan to remove the existing 2 curb buts that are located at the ne corner of 22nd street and ward place nw. However, as a result of the phase 2 expansion and building usage change, new pepco vaults will be necessary to service the final construction. The existing building currently has a zero lot-line underground parking structure that prevents for the installation of the proposed pepco vaults on private space. Therefore we are proposing 2 new transformer and 1 new bus hole vault along 22nd Date: April 22, 2015 Contractor: Jim Carr Hitt Contracting Permit type: Paving; curb & gutter | Permit status: Revise and resubmit | Expiration date: June 29, 2016 | |||||
SCORE 68 1255 22nd Street Nw Washington Dc The project will consist of 2 phases. The first phase includes the renovation of the existing building that is located at 1255 22nd street nw. The second phase will be built on lot 194 (currently an existing parking lot located behind the existing phase 1 building), and is subject to our alley closing approval that is currently in process. The phase 2 building is planned to span over the to-be-closed existing alley and connect to the existing phase 1 building. As part of our application to ddot, we plan to remove the existing 2 curb buts that are located at the ne corner of 22nd street and ward place nw. However, as a result of the phase 2 expansion and building usage change, new pepco vaults will be necessary to service the final construction. The existing building currently has a zero lot-line underground parking structure that prevents for the installation of the proposed pepco vaults on private space. Therefore we are proposing 2 new transformer and 1 new bus hole vault along 22nd Date: January 4, 2017 Contractor: Jim Carr Hitt Contracting Permit type: Paving; curb & gutter | Permit status: Assigned | Expiration date: December 1, 2017 | |||||
SCORE 68 1255 22nd Street Nw Washington Dc Paving; curb & gutter(s), paving; driveway(s) close existing, paving; mill and overlay, paving; sidewalk(s), landscaping; new tree space(s), fixture; bike rack(s), landscaping; tree planting, landscaping; tree removal, excavation; vault(s) lxw Date: January 17, 2017 Contractor: Jim Carr Hitt Contracting Permit status: 8 | Expiration date: March 17, 2017 | Permit id: Pa109056-R1 | |||||
SCORE 68 1255 22nd Street Nw Washington Dc The project will consist of 2 phases. The first phase includes the renovation of the existing building that is located at 1255 22nd street nw. The second phase will be built on lot 194 (currently an existing parking lot located behind the existing phase 1 building), and is subject to our alley closing approval that is currently in process. The phase 2 building is planned to span over the to-be-closed existing alley and connect to the existing phase 1 building. As part of our application to ddot, we plan to remove the existing 2 curb buts that are located at the ne corner of 22nd street and ward place nw. However, as a result of the phase 2 expansion and building usage change, new pepco vaults will be necessary to service the final construction. The existing building currently has a zero lot-line underground parking structure that prevents for the installation of the proposed pepco vaults on private space. Therefore we are proposing 2 new transformer and 1 new bus hole vault along 22nd Date: April 22, 2015 Contractor: Jim Carr Hitt Contracting Permit type: Paving; curb & gutter | Permit status: Issued | Expiration date: December 1, 2016 | Permit id: Pa109056 | |||||
SCORE 68 1255 22nd Street Nw Washington Dc The project will consist of 2 phases. The first phase includes the renovation of the existing building that is located at 1255 22nd street nw. The second phase will be built on lot 194 (currently an existing parking lot located behind the existing phase 1 building), and is subject to our alley closing approval that is currently in process. The phase 2 building is planned to span over the to-be-closed existing alley and connect to the existing phase 1 building. As part of our application to ddot, we plan to remove the existing 2 curb buts that are located at the ne corner of 22nd street and ward place nw. However, as a result of the phase 2 expansion and building usage change, new pepco vaults will be necessary to service the final construction. The existing building currently has a zero lot-line underground parking structure that prevents for the installation of the proposed pepco vaults on private space. Therefore we are proposing 2 new transformer and 1 new bus hole vault along 22nd Date: August 14, 2017 Contractor: Jim Carr Hitt Contracting Permit type: Paving; curb & gutter | Permit status: Issued | Expiration date: November 12, 2017 | Permit id: Pa109056-R5 |