SCORE 79 125 High St Boston Ma Rewelding back together a bronze rail that broke in 2 locations. Will require welding and grinding. (dpl) bfd paid detail required Date: May 3, 2017 Contractor: Jennifer Rivera Permit type: Bfd cutting-burning-welding | Permit id: Cbw704226 | |||||
SCORE 79 880888 Boylston St Boston Ma Install new structural steel to reinforce 13th fl new steel stair that spans from 12th to 13th fl & new steel rails at 13th fl. Install new structural steel members welded to existing bldg structure & steel stringers & pans that make up the new stairs. Torch cutting to remove existing steel. Bfd paid detail required Date: May 19, 2017 Contractor: Jennifer Rivera Client: Bp Prucenter Acquisition Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw710148 | Parcel: 0401037100 | |||||
SCORE 79 1 Huntington Av Boston Ma Installing ss stair &; ramp rails at the exterior bldg at main entrance of 1 huntington ave starting at the sidewalk level and up the concrete ramp to the main entrance at the 1st fl. The work consists of welding ss rail components during erection in order to create hand rails. (dpl) Date: May 23, 2017 Contractor: Jennifer Rivera Client: Sophine Lps | Permit type: Bfd cutting-burning-welding | Permit id: Cbw699859 | Parcel: 0400864000 | |||||
SCORE 79 4 Yawkey Wy Boston Ma Installation of a new section of steel rail and modifications to existing rail. Cutting and welding to remove part of the existing rail &; to weld the new section of rail on. (dpl) bfd paid detail required Date: June 9, 2017 Contractor: Jennifer Rivera Client: Henry John W Ts | Permit type: Bfd cutting-burning-welding | Permit id: Cbw717604 | Parcel: 0504199000 | |||||
SCORE 79 1 Federal St Boston Ma Install new struct steel columns &; beams to frame out new entrance &; new extension of mezzanine lvl. New steel framing at lvl 2 to support new stair &; the opening. Installing 2 new steel riser stairs &; angle frames at lvl 2. (dpl) bfd paid detail required Date: June 9, 2017 Contractor: Jennifer Rivera Client: Bp Federal Street Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw718395 | Parcel: 0304410000 | |||||
SCORE 79 State St Boston Ma Installing new structural steel beams to existing beams. Cutting and burning of existing steel to be removed and welding new steel clips and steel beams to existing structural steel (dpl) bfd paid detail required Date: June 16, 2017 Contractor: Jennifer Rivera Client: Anbeca Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw720312 | Parcel: 0303685000 | |||||
SCORE 79 1 Federal St Boston Ma Install new struct steel columns &; beams to frame out new entrance &; new extension of mezzanine lvl. New steel framing at lvl 2 to support new stair &; the opening. Installing 2 new steel riser stairs &; angle frames at lvl 2 (dpl) bfd paid detail required Date: June 16, 2017 Contractor: Jennifer Rivera Client: Bp Federal Street Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw720269 | Parcel: 0304410000 | |||||
SCORE 79 2601 Beacon St Brighton Ma Perform cutting and welding for work associated with new steel catwalk structure (dpl) bfd paid detail required Date: July 10, 2017 Contractor: Jennifer Rivera Client: Boston College Trs Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw726194 | Parcel: 2102473001 | |||||
SCORE 79 8 Boylston St Boston Ma Install new structural steel beams tubes & plates to existing beam to support the stair at floors 33-34. Weld new stair steel frame to new installed struct. Beam to support the stair. Install angle frames & beams to support cutouts being made for new floor boxes on fl. 33 framing. Bfd paid detail required Date: March 23, 2017 Contractor: Jennifer Rivera Client: Bp Prucenter Acquisition Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw690118 | Parcel: 0401037100 | |||||
SCORE 79 941 Guest St Brighton Ma Cutting burning &; welding;to install structural steel entrance canopy members that anchored to existing baseplates &; create structure thatll be cladded w wood &; covered w waterproof roof (dpl) bfd paid detail required Date: February 14, 2017 Contractor: Jennifer Rivera Client: Boston Landing Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw679191 | Parcel: 2201905000 | |||||
SCORE 79 111 Huntington Av Boston Ma Welding cutting for installation of new ;flag pole new steel flange to the existing steel that will aloow flag pole to be bolted in place. Dpl 3 31. Bfd paid detail required;in "clear view" of;hot-work!; Date: February 16, 2017 Contractor: Jennifer Rivera Client: Bp 111 Huntington Av Lessee | Permit type: Bfd cutting-burning-welding | Permit id: Cbw679449 | Parcel: 0401037500 | |||||
SCORE 79 1 Beacon St Boston Ma Cutting burning welding to install new struct steel members that are welded to existing steel bldg structure &; steel stair stringers &; pans and;some torch cutting to remove steel that is not needed (dpl) bfd paid detail required Date: February 28, 2017 Contractor: Jennifer Rivera Client: Obs Reit Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw683639 | Parcel: 0302720000 | |||||
SCORE 79 111 Huntington Av Boston Ma The scope of work includes removal and adjustment of new steel stair stringers that connect floors 15 &; 16 (dpl) bfd paid detail required Date: July 19, 2017 Contractor: Jennifer Rivera Client: Bp 111 Huntington Av Lessee | Permit type: Bfd cutting-burning-welding | Permit id: Cbw731119 | Parcel: 0401037500 |