Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 Commercial: install (3) dual head ev chargers in (e) parking lot level 2 Date: February 17, 2016 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-00368 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 Ti for existing tenant "varian medical systems inc" 885 sf. Remodel office lobby including new lights and new electrical outlets. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-03314 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 13000-01221: relocate accessible parking spaces as (e) location did not meet cross slope requirements. Date: September 9, 2014 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00540 | |||||
SCORE 93 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02104 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 13000-01221: electrical changes included extended cable tray, add receptacles, add circuit breaker. Date: March 4, 2014 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00136 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 13000-01221: revise which bathroom is being brought up to accessibility requirements Date: December 4, 2013 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00755 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 13000-01221: remove an island at the rear parking lot. Foundation and footing changes due to proximity of utilties. Door, equipment, and minor electrical changes Date: September 6, 2013 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00550 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 Varian: 5,672 sf single story addition to building 3 to add three (3) test cells and an office. Concurrent arb Date: May 7, 2013 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01221 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 13-482: addition of 4 footings to support mezzanine, modifications to 2 (e) footings, reduced footprint of mezzanine, minor accessibility upgrades; no exterior changes Date: June 19, 2013 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00391 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 Varian: (n) 349 sf storage mezanine at the first floor for the existing tenant. Date: October 30, 2012 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02710 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 Varian medical systems: remove 1 hour corridor requirement. Add a new single door sidelite at existing location. Date: April 11, 2013 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00227 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 Varian medical systems: 2045 sq ft tenant improvement area 115 first floor Date: February 6, 2013 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00367 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 11-3019: bulletin 6, revise truncated dome layout. Change driveway between two parking lots at east end of service drive to a curb. Change lighting add a drinking fountain Date: December 21, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00712 | |||||
SCORE 93 Date: July 25, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00409 | |||||
SCORE 93 Date: October 9, 2012 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02533 | |||||
SCORE 93 Date: February 20, 2013 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Void | Permit id: 13000-00483 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 11000-03019: relocating transformer, plumbing revisions per cpa inspector, steel at excercise room ceiling. Date: July 12, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00389 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 11-3019:varian medical: opening in floor added near stair #1, mechanical equipment revised. Kitchen equipment and drains relocated. Relocate elevator controll room. Eliminate prep room #2. Miscelaneous interior revisions for all trades coordination. Date: March 28, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00186 | |||||
SCORE 93 Date: February 2, 2012 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00264 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 Varian medical systems: 2633 sq ft tenant improvement kv cell on first floor (adjacent to area 115 tenant improvement refer to 13000-00367) create a concrete pit for laser, kv cell room will be lead-lined: lead lining will be a deferred submittal, add 75kva transformer and two 4 amp sub-panels for new equipment add 626 sq ft mezzanine with pre-fab stairs (4/16/13) valuation adjusted for new mezzanine Date: February 20, 2013 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00482 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 Install 3 new dual head level 2 charging stations at the existing parking stalls. 5 17 16: routed a revised landscape page to kelsey Date: May 11, 2016 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Approved | Permit id: 16000-01129 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 11-3019: bulletin 4 and 5, delta 9 and - room 234/235 operable partition deleted, assessment rm 221 relocated, trash compactor & enclosure on site deleted, finish plans a11. 1 a11. 2 added. Wall configuration changed to add rooms 234, 235, 236 and 237. Date: August 30, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00495 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 13000-01221: relocate accessible parking spaces as (e) location did not meet cross slope requirements. Date: September 9, 2014 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 14rev-00540 | |||||
SCORE 93 Permit status: Permit issued | Permit id: 14000-02104 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 13000-01221: electrical changes included extended cable tray, add receptacles, add circuit breaker. Date: March 4, 2014 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 14rev-00136 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 13000-01221: revise which bathroom is being brought up to accessibility requirements Date: December 4, 2013 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 13rev-00755 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 13000-01221: remove an island at the rear parking lot. Foundation and footing changes due to proximity of utilties. Door, equipment, and minor electrical changes Date: September 6, 2013 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 13rev-00550 | |||||
SCORE 93 911 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca Varian: 5,672 sf single story addition to building 3 to add three (3) test cells and an office. Concurrent arb Date: May 7, 2013 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 13000-01221 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 San Diego Ca 13-482: addition of 4 footings to support mezzanine, modifications to 2 (e) footings, reduced footprint of mezzanine, minor accessibility upgrades; no exterior changes Date: June 19, 2013 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 13rev-00391 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca Varian: (n) 349 sf storage mezanine at the first floor for the existing tenant. Date: October 30, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12000-02710 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 San Diego Ca Varian medical systems: 2633 sq ft tenant improvement kv cell on first floor (adjacent to area 115 tenant improvement refer to 13000-00367) create a concrete pit for laser, kv cell room will be lead-lined: lead lining will be a deferred submittal, add 75kva transformer and two 4 amp sub-panels for new equipment add 626 sq ft mezzanine with pre-fab stairs (4 16 13) valuation adjusted for new mezzanine Date: February 20, 2013 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 13000-00482 | |||||
SCORE 93 Date: February 20, 2013 Contractor: James R Griffin Inc Permit status: Void | Permit id: 13000-00483 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 San Diego Ca Varian medical systems: remove 1 hour corridor requirement. Add a new single door sidelite at existing location. Date: April 11, 2013 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 13rev-00227 | |||||
SCORE 93 Unit 4 / 31 Hansen Wy, Bldg 4, Palo Alto, Ca 94304 San Diego Ca Varian medical systems: 2045 sq ft tenant improvement area 115 first floor Date: February 6, 2013 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 13000-00367 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 11-3019: bulletin 6, revise truncated dome layout. Change driveway between two parking lots at east end of service drive to a curb. Change lighting add a drinking fountain Date: December 21, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12rev-00712 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 11-3019: bulletin 4 and 5, delta 9 and - room 234 235 operable partition deleted, assessment rm 221 relocated, trash compactor & enclosure on site deleted, finish plans a11. 1 + a11. 2 added. Wall configuration changed to add rooms 234, 235, 236 and 237. Date: August 30, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12rev-00495 | |||||
SCORE 93 Date: October 9, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12000-02533 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 11000-03019: deferred submittal, design bld stair #1,2 &3 Date: July 25, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12rev-00409 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 11000-03019: relocating transformer, plumbing revisions per cpa inspector, steel at excercise room ceiling. Date: July 12, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12rev-00389 | |||||
SCORE 93 31 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 11-3019:varian medical: opening in floor added near stair #1, mechanical equipment revised. Kitchen equipment and drains relocated. Relocate elevator controll room. Eliminate prep room #2. Miscelaneous interior revisions for all trades coordination. Date: March 28, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12rev-00186 | |||||
SCORE 93 Date: February 2, 2012 Contractor: James R Griffin Inc Permit status: Permit issued | Permit id: 12000-00264 |