Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 314 5th St Ne, Washington, Dc 20002 First floor complete installation of a double sided gas fireplace including installation of flue and framing around the fireplace to support wall finish note: gas line has already been permitted, intalled and passed inspection. Close niche in the dinning room with double door. Install new water lines for a washer and dryer in niche. Install washer and dryer in niche. Install new engineered hardwood flooring in the living room dining room second floor hang drywall on top of existing lath and plaster walls. Install 3 closet doors in bedrooms. Install 2 bedroom doors. Install header above master bedroom door. Install hardwood floors in hallway and bedrooms. Install light in the master bedroom closet, install 2 outlets in the master bedroom. Frame and drywall around the 8 inch vent from the fireplace in the bathroom. Install a gfi in the bathroom. Remove existing water lines from one bedroom. Roof finish flu venitlation at roof. Note. The original floors will not be removed. Date: July 27, 2012 Contractor: James Mann Jessica Mann Heather W Hartshorn Client: James Mann Jessica Mann | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1211482 |