Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 76 50 Overlook Ave Sw, Washington, Dc 20032 The tunnel dewatering pump station,tdps and the enhance clarification facility, ecf provides treatment for the combine sewer overflows, csos at the blue plains advanced wastewater treatment plant, awtp through the 23-foot diameter blue plains tunnel, bpt, which is design to facilitate treatment of 2 mgd flow. This is phase three of the tdps/ecf project. Date: April 2, 2015 Contractor: Isatu Bradshaw Hb Permit Service Inc Client: Isatu Bradshaw Hb Permit Service | Permit type: New building | Permit status: Permit issued | Permit id: B1501578 | |||||
SCORE 76 50 Overlook Ave Sw, Washington, Dc 20032 Amend building permit # b1201824 to replace existing elevator that was not on previous permit. Date: October 2, 2014 Contractor: Isatu Bradshaw Hb Permit Service Inc Client: District Of Columbia | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1411415 | |||||
SCORE 76 50 Overlook Ave Sw, Washington, Dc 20032 Subsurface utility location - potholing on the blue plains treatment plant. This involves trenches and vacuum extraction of soils to locate existing utilities prior to construction. All work will be performed on dc water property. Work will be above water table. Date: February 18, 2014 Contractor: Isatu Bradshaw Hb Permit Service Inc Client: Dc Water ? Sewer | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1400011 | |||||
SCORE 76 50 Overlook Ave Sw, Washington, Dc 20032 Construction of a tunnel dewatering pump station for the dc water blue plains advanced wastewater treatment plant. In addition to construction of the pump station, the tdps will consist of a coarse screening system and surge shaft. This project is phase two of three of the tdps and ecf . Date: December 23, 2014 Contractor: Isatu Bradshaw Hb Permit Service Inc Client: Isatu Bradshaw | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1411124 | |||||
SCORE 76 50 Overlook Ave Sw, Washington, Dc 20032 Tunnel dewatering pump station/enhanced clarification facility tdps/ecf early site work, tie-ins and bypasses is consist of chemical systems, low head pump station and transfer pump station which is phase one of three. Date: August 28, 2014 Contractor: Isatu Bradshaw Hb Permit Service Inc Client: Isatu Bradshaw | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1407553 | |||||
SCORE 76 50 Overlook Ave Sw, Washington, Dc 20032 Amend building permit #b1206753 to reflect the construction classification change from type ib to type iib. This is consistent with similar buildings on the site classified under the provision of dcmr 12a - section 503. 1. 1 - special industrial occupancies for collection or treatment of sewage, which are exempt from the allowable height and area limitations of table 503, due to the specialized industrial use for this type of building. Date: October 30, 2013 Contractor: Isatu Bradshaw Hb Permit Service Inc Client: District Of Columbia | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1401056 |