Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 23 South Capitol St Se To construct a 55 foot diameter 125 foot deep shaft that will serve as a junction chamber and provide access tp the new d. C. Clean rivers storm water tunnel that will run underneath the city of washington d. C. This shaft will be the connector between the new blue plains tunnel the new anacostia river tunnel Date: August 21, 2012 Contractor: Isatu . Bradshaw Client: Dc Government | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200053 | |||||
SCORE 59 23 South Capitol St Se Washington Dc To construct a 55 foot diameter 125 foot deep shaft that will serve as a junction chamber and provide access tp the new d. C. Clean rivers storm water tunnel that will run underneath the city of washington d. C. This shaft will be the connector between the new blue plains tunnel the new anacostia river tunnel Date: August 21, 2012 Contractor: Isatu . Bradshaw Client: Dc Government | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1200053 |