Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 34 Idaho Ave Nw, Washington, Dc 20016 Converting the wet sprinkler system in the 4th floor server room to a double interlock preaction system. This includes the detection system and preaction panel. Date: December 13, 2013 Contractor: Ipek Saydam Client: Vaughn Mclean Llc Capital Properties Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1402015 |