Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 1 E 1 S, Salt Lake City, Ut, 84111 0000 Lobby remodel on first level atrium glassed in from levels 1 thru 8. Fire protection work will involve adding heads spaced 6-0" on center for the tenant side of the atrium glass from levels 1 thru 8 and adjusting locations and adding sprinkler heads for the lobby remodel on the first level. The building is protected with an existing fire sprinkler system. Date: August 12, 2013 Contractor: Interwest Fire Protectionboyer Tower 102 Permit type: Fire | Permit status: Completed | Completion date: November 6, 2013 | Current use: Commercial | Permit id: Bld2013-05680 | |||||
SCORE 64 1 E 1 S Salt Lake City, Ut 84111 00 Lobby remodel on first level atrium glassed in from levels 1 thru 8. Fire protection work will involve adding heads spaced 6-0" on center for the tenant side of the atrium glass from levels 1 thru 8 and adjusting locations and adding sprinkler heads for the lobby remodel on the first level. The building is protected with an existing fire sprinkler system. Date: August 12, 2013 Contractor: Interwest Fire Protectionboyer Tower 102 Permit type: Fire | Permit status: Inspections | Completion date: November 6, 2013 | Current use: Commercial | Permit id: Bld2013-05680 | |||||
SCORE 64 1 E 1 S, Salt Lake City, Ut, 841110000 Lobby remodel on first level + atrium glassed in from levels 1 thru 8. Fire protection work will involve adding heads spaced 6-0" on center for the tenant side of the atrium glass from levels 1 thru 8 and adjusting locations and adding sprinkler heads for the lobby remodel on the first level. The building is protected with an existing fire sprinkler system. Date: August 12, 2013 Contractor: Interwest Fire Protectionboyer Tower 102 Permit type: Fire | Permit status: Completed | Completion date: November 6, 2013 | Current use: Commercial | Permit id: Bld2013-05680 | |||||
SCORE 64 1 E 1 S Salt Lake City, Ut 8411100 Lobby remodel on first level + atrium glassed in from levels 1 thru 8. Fire protection work will involve adding heads spaced 6-0" on center for the tenant side of the atrium glass from levels 1 thru 8 and adjusting locations and adding sprinkler heads for the lobby remodel on the first level. The building is protected with an existing fire sprinkler system. Date: August 12, 2013 Contractor: Interwest Fire Protectionboyer Tower 102 Permit type: Fire | Permit status: Inspections | Completion date: November 6, 2013 | Current use: Commercial | Permit id: Bld2013-05680 |