Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 222 Mason St San Francisco Ca This scope is phase 3 of voluntary seismic retrofit & consist of strengthening of (e) column splices along the tower perimeter & the demolition. Construction of walls in these area. No change in occupancy occ load or egress. No exterior work. Fire life safety under separate permit. Permit type: Building permit | Expiration date: November 17, 2018 | Current use: Tourist hotel/motel | Permit id: #201609168047 | |||||
SCORE 59 222 Mason St San Francisco Ca This scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls floor & ceiling on level 1 & 4 around new seismic members. No change in occupancy occ load & egress Permit type: Building permit | Expiration date: October 14, 2017 | Current use: Tourist hotel/motel | Permit id: #201607061684 |