Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 2 Lake St, Burlington, Vt 05401 Install full view heavy duty storm doors for units 1-16 using same color doors as existing outside doors on lake side of houses. Date: November 15, 2002 Contractor: Harbor Investments Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 03-232 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Installation of 7 x 7 granite bollards along access driveway from lake street. Date: September 16, 2002 Contractor: Harbor Investments Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 03-133 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Amend previously approved 19 unit residential development to include the merging of units #18 and #19 into one unit, #16. Exterior materials to be same as units #14 and #15. Project to be finalized upon completion of unit #16. Date: December 5, 2001 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Permit indeterminate 3 | Permit id: 02-260 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St Unit 14, Burlington, Vt 05401 Revise stair tower design and west entry doors on units #14 and #15. Date: November 13, 2001 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 02-228 | Parcel: 0434010014 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Amend previously approved 19 unit residential development in 1 building to include the merging of units 14 & 15 into unit #14, and the merging of units 16 & 17 into unit #15. Proposal includes alterations to the front facade, garage doors and driveway layo Date: July 9, 2001 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 02-004 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St Unit 13, Burlington, Vt 05401 Add a carport cover to unit #13s parking area. No change in coverage or use for the 19 condominium units. Date: May 7, 2001 Contractor: Harbor Investments Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 01-417 | Parcel: 0434010013 | |||||
SCORE 99 2 Lake St Unit 2, Burlington, Vt 05401 Installation of a 12 x 12 pergola on the roof top of unit #2 of the existing condominium unit (19 total units). No change in coverage or use. Date: March 30, 2001 Contractor: Harbor Investments Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 01-354 | Parcel: 0434010002 | |||||
SCORE 99 2 Lake St Unit 11, Burlington, Vt 05401 Revisions to the originally approved facade elevations for units 11, 12, and 13 of the existing 19 unit condominium complex, to include the following: a window in the garage wall of unit 11; units 11 and 12 rear entries flanked by two sidelights; unit 12 w Date: September 22, 2000 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 01-150 | Parcel: 0434010011 | |||||
SCORE 99 2 Lake St Unit 1, Burlington, Vt 05401 Installation of a pergola on the roof of unit #1 of the existing condominium unit. Pergola to measure 12x 12. Date: June 7, 2000 Contractor: Harbor Investments Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 00-617 | Parcel: 0434010001 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Amend previously approved nineteen residential units to include landscaping and building elevations alterations as described in the 8/25/98 ltr from b. Mossman. Proposal includes time extension of permit from june 23, 20 to june 23, 2003. Date: August 26, 1998 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 99-111 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Fenestration changes to the third floor front elevation of the existing nineteen residential units. Proposal includes shifting units 1 - 4 approximately nine degrees to better line up with lake street and elimination of the carport and dumpster for the sit Date: August 5, 1997 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 98-048 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Extension of the originally permitted (6/24/93) five year phasing of the nineteen unit residential project. Date: July 3, 1996 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 97-041 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Additional window on the northwest walls, first floor level of units 2,3,4 and 5 for the existing 19 unit residential development. (originally approved 7/8/93) Date: March 8, 1996 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 96-362 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Fenestration changes to unit #4 and 5, optional on #1, 2 and 3 in the 19 unit residential development. (originally approved 7/8/93) Date: April 12, 1996 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 96-439 | Parcel: 0434010000 | |||||
SCORE 99 2 Lake St, Burlington, Vt 05401 Construction of 19 residential units in one structure with associated site improvements. Previously approved for units, coa 88-010. Date: June 3, 1993 Contractor: Harbor Investments Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 93-520 | Parcel: 0434010000 |