Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 1401 Constitution Avenue Nw Washington Dc The primary goal for the hoover building perimeter security project is to provide an isc level 4-rated perimeter around the building. The main objectives of the design are to provide a scheme that both meets the security requirements identified by the isc and the department of commerce, complements the style and scale of the building and site, and introduces improvements to the public realm. A combination of rated walls, bollards, collapsible sidewalks, cable rail fence assemblies, and low-impact development areas will be introduced into public space. The location, material palette, and aesthetic (form) of these objects is undergoing review by ncpc, cfa, ddot, dcop, dc shpo, nps, doc, and gsa. Date: January 19, 2017 Contractor: Grunley Construction Herbert Hoover Bldg Client: Robert Vaughn | Permit type: Paving; ada curb ramp, paving; leadwalk only, fixture; bike rack | Permit status: Assigned | Expiration date: March 3, 2018 | |||||
SCORE 79 1401 Constitution Avenue Nw Washington Dc Paving; ada curb ramp, paving; leadwalk only, fixture; bike rack(s), fixture; bollard(s) (exception), fixture; fence to 42" (open design), fixture; flagpole(s) (exception), fixture; wall (exception over 42"), landscaping; stormwater mgmt (w curb drain), landscaping; tree planting, over head work; streetlight(s) installation, paving; sidewalk(s) Contractor: Grunley Construction Herbert Hoover Bldg Permit status: 10 | Expiration date: March 3, 2018 | Permit id: 0 | |||||
SCORE 79 Contractor: Grunley Construction Herbert Hoover Bldg Permit status: Notpaid | Expiration date: May 3, 2017 | Permit id: 0 | |||||
SCORE 79 1401 Constitution Avenue Nw Washington Dc The primary goal for the hoover building perimeter security project is to provide an isc level 4-rated perimeter around the building. The main objectives of the design are to provide a scheme that both meets the security requirements identified by the isc and the department of commerce, complements the style and scale of the building and site, and introduces improvements to the public realm. A combination of rated walls, bollards, collapsible sidewalks, cable rail fence assemblies, and low-impact development areas will be introduced into public space. The location, material palette, and aesthetic (form) of these objects is undergoing review by ncpc, cfa, ddot, dcop, dc shpo, nps, doc, and gsa. Contractor: Grunley Construction Herbert Hoover Bldg Permit status: Revise and resubmit | Expiration date: March 3, 2018 | Permit id: 0 | |||||
SCORE 79 Contractor: Grunley Construction Herbert Hoover Bldg Permit status: Not paid | Expiration date: May 3, 2017 | Permit id: 0 | |||||
SCORE 79 1401 Constitution Avenue Nw Washington Dc Paving; ada curb ramp, paving; leadwalk only, fixture; bike rack(s), fixture; bollard(s) (exception), fixture; fence to 42" (open design), fixture; flagpole(s) (exception), fixture; wall (exception over 42"), landscaping; stormwater mgmt (w curb drain), landscaping; tree planting, over head work; streetlight(s) installation, paving; sidewalk(s) Contractor: Grunley Construction Herbert Hoover Bldg Permit status: 3 | Expiration date: March 3, 2018 | Permit id: 0 | |||||
SCORE 79 Contractor: Grunley Construction Herbert Hoover Bldg Permit status: Notpaid | Expiration date: May 3, 2017 | Permit id: 0 | |||||
SCORE 79 1401 Constitution Avenue Nw Washington Dc The primary goal for the hoover building perimeter security project is to provide an isc level 4-rated perimeter around the building. The main objectives of the design are to provide a scheme that both meets the security requirements identified by the isc and the department of commerce, complements the style and scale of the building and site, and introduces improvements to the public realm. A combination of rated walls, bollards, collapsible sidewalks, cable rail fence assemblies, and low-impact development areas will be introduced into public space. The location, material palette, and aesthetic (form) of these objects is undergoing review by ncpc, cfa, ddot, dcop, dc shpo, nps, doc, and gsa. Contractor: Grunley Construction Herbert Hoover Bldg Permit status: Cancel/withdrawn | Expiration date: March 3, 2018 | Permit id: 0 | |||||
SCORE 79 Contractor: Grunley Construction Herbert Hoover Bldg Permit status: Not paid | Expiration date: May 3, 2017 | Permit id: 0 | |||||
SCORE 79 1401 Constitution Avenue Nw Washington Dc The primary goal for the hoover building perimeter security project is to provide an isc level 4-rated perimeter around the building. The main objectives of the design are to provide a scheme that both meets the security requirements identified by the isc and the department of commerce, complements the style and scale of the building and site, and introduces improvements to the public realm. A combination of rated walls, bollards, collapsible sidewalks, cable rail fence assemblies, and low-impact development areas will be introduced into public space. The location, material palette, and aesthetic (form) of these objects is undergoing review by ncpc, cfa, ddot, dcop, dc shpo, nps, doc, and gsa. Date: January 19, 2017 Contractor: Grunley Construction Herbert Hoover Bldg Client: Robert Vaughn | Permit type: Paving; ada curb ramp, paving; leadwalk only, fixture; bike rack | Permit status: Cancel/withdrawn | Expiration date: March 3, 2018 | Permit id: 0 |