Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 15987 Fairgrove Av La Puente Ca 91744 Install on site sewer connection from property line to rear of house and abandon septic system. Date: October 1, 2012 Contractor: Gopher Construction Co Applicant: Diana Cervenka | Permit status: Permisud | Permit id: 1210010004 | |||||
SCORE 99 Date: April 26, 2007 Contractor: Gopher Construction Co Applicant: Tom | Permit status: Permisud | Permit id: 0704260042 | |||||
SCORE 99 Date: September 14, 2009 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Permit id: 0909140029 | |||||
SCORE 99 Date: February 23, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co | Permit status: Finaled | Completion date: March 3, 2000 | Permit id: 0002230015 | |||||
SCORE 99 Date: April 6, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 11, 2001 | Permit id: 0104060010 | |||||
SCORE 99 325 Berkeley Av Pasadena Ca 91107 Plumbing reversal under house to exit n/s for new sewer connection. Date: October 15, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 14, 2001 | Permit id: 0110150033 | |||||
SCORE 99 Date: September 5, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 13, 2002 | Permit id: 0209050027 | |||||
SCORE 99 28 Mary St Los Angeles Ca Replace water service from meter house,some repipe at underfloor only and install line for sprinkler Date: May 21, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 5, 2003 | Permit id: 0305210006 | |||||
SCORE 99 Date: May 23, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 2, 2003 | Permit id: 0305230014 | |||||
SCORE 99 31 Brookhill St Los Angeles Ca Install sewer ejector pump. Inspector to coordinate w/ roscoe king for inspections. (626) 458-3182 Date: April 26, 2007 Contractor: Gopher Construction Co Applicant: Tom | Permit status: Permisud | Permit id: 0704260028 | |||||
SCORE 99 Date: September 14, 2009 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 24, 2009 | Permit id: 0909140018 | |||||
SCORE 99 1879 Altadena Dr Altadena Ca 91001 Install 15 gal septic tank & 46 1/2 bi seepage pit & abandon old cesspool & seepage pit. Date: February 23, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co | Permit status: Finaled | Completion date: March 3, 2000 | Permit id: 0002230004 | |||||
SCORE 99 Date: May 12, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 22, 2000 | Permit id: 0005120034 | |||||
SCORE 99 1354 Altadena Dr Altadena Ca 91001 Connect house to public sewer & abandon private sewage disp. System. Date: June 13, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co. | Permit status: Finaled | Completion date: June 27, 2000 | Permit id: 0006130002 | |||||
SCORE 99 Date: June 15, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co | Permit status: Finaled | Completion date: June 22, 2000 | Permit id: 0006150008 | |||||
SCORE 99 Date: November 16, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: February 13, 2001 | Permit id: 0011160017 | |||||
SCORE 99 1945 Altadena Dr Altadena Ca 91001 Instl. 12 gal. Sept. Tank&17b. Surf. Seepage pit.,connect to 1 existing seepage pit,abandon cesspool Date: December 15, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Permit id: 0012150003 | |||||
SCORE 99 Date: December 19, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 20, 2000 | Permit id: 0012190004 | |||||
SCORE 99 Date: February 16, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 4, 2001 | Permit id: 0102160058 | |||||
SCORE 99 00 Star Route Los Angeles Ca Percolation test pits for seepage pits,three 27bi (47bs) 3 seepage pits. Clear creek outdoor educatio ctr tg. 505/g1 Date: February 16, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Permit id: 0102160060 | |||||
SCORE 99 Date: March 7, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: October 30, 2001 | Permit id: 0103070006 | |||||
SCORE 99 Date: March 7, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 7, 2001 | Permit id: 0103070007 | |||||
SCORE 99 Date: March 21, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 4, 2001 | Permit id: 0103210010 | |||||
SCORE 99 Date: April 6, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 11, 2001 | Permit id: 0104060026 | |||||
SCORE 99 Date: May 23, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: February 27, 2002 | Permit id: 0105230005 | |||||
SCORE 99 Date: June 20, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 4, 2002 | Permit id: 0106200002 | |||||
SCORE 99 Date: August 23, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: August 28, 2001 | Permit id: 0108230016 | |||||
SCORE 99 275 Grand Oaks Av Pasadena Ca 91107 Connect single family dwelling to public sewer & abandon p. S. D. S. Date: October 2, 2001 Contractor: Gopher Construction Co Applicant: Gopher Cons. | Permit status: Finaled | Completion date: October 8, 2001 | Permit id: 0110020008 | |||||
SCORE 99 331 Roosevelt Av Pasadena Ca 91107 Connect house sewer to public sewer,abandon psds,install back water valve Date: October 9, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction* | Permit status: Finaled | Completion date: October 10, 2001 | Permit id: 0110090006 | |||||
SCORE 99 3219 Fairpoint St Pasadena Ca 91107 Install 15 gal septic tank & bi (33bs) seepage pit, abandon cesspool,connect (2) existing seepage pits Date: October 9, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction* | Permit status: Finaled | Completion date: July 25, 2008 | Permit id: 0110090007 | |||||
SCORE 99 2835 Holliston Av Altadena Ca 91001 Install 15 gal septic tank & 31below inlet & below surface seepage pit. Date: October 15, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Permit id: 0110150007 | |||||
SCORE 99 325 Berkeley Av Pasadena Ca 91107 Connect existing sfr to public sewer,make connection at property line & at house. Pipe installed under se0007130001 install backwater valve. Date: October 15, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 14, 2001 | Permit id: 0110150008 | |||||
SCORE 99 676 Las Flores Dr Altadena Ca 91001 Connect existing sfr to public sewer. Connected in rear of property,in s/w corner of property. Abandon cesspool & pits Date: December 6, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 11, 2002 | Permit id: 0112060013 | |||||
SCORE 99 Date: January 3, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: January 8, 2002 | Permit id: 0201030003 | |||||
SCORE 99 Date: April 11, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: July 19, 2002 | Permit id: 0204110019 | |||||
SCORE 99 Date: June 6, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 23, 2002 | Permit id: 0206060040 | |||||
SCORE 99 Date: July 17, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 23, 2002 | Permit id: 0207170002 | |||||
SCORE 99 Date: September 5, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 13, 2002 | Permit id: 0209050007 | |||||
SCORE 99 3554 Hollyslope Rd Altadena Ca 91001 Install 10 gal. Septic tank to replace exis. Tank in area of construction Date: September 17, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 18, 2002 | Permit id: 0209170008 | |||||
SCORE 99 2441 Ganesha Av Altadena Ca 91001 Extd. Lat. 12from curb to p. L.,connect sfr to public sewer, abandon cesspool and seepage pits Date: October 8, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction Co. | Permit status: Finaled | Completion date: October 15, 2002 | Permit id: 0210080006 | |||||
SCORE 99 Date: November 5, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Completion date: November 7, 2002 | Permit id: 0211050007 | |||||
SCORE 99 Date: March 5, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 1, 2003 | Permit id: 0303050006 | |||||
SCORE 99 1532 Altadena Dr Altadena Ca 91001 Connect guest house to main house sewer line. Abandon septic system. Date: March 28, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 1, 2003 | Permit id: 0303280008 | |||||
SCORE 99 36 Silver Spruce Ln Altadena Ca 91001 Connect existing sfr to public sewer & abandon existing private disposal system. Date: April 18, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 24, 2003 | Permit id: 0304180010 | |||||
SCORE 99 Date: May 23, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 2, 2003 | Permit id: 0305230003 | |||||
SCORE 99 Date: September 29, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: November 14, 2003 | Permit id: 0309290003 | |||||
SCORE 99 Date: November 24, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: January 14, 2004 | Permit id: 0311240007 | |||||
SCORE 99 Date: December 8, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 11, 2003 | Permit id: 0312080001 | |||||
SCORE 99 19615 Covina Hills Rd Covina Ca 91722 Install 15 gallon septic tank & advantex ax denitrificat ion unit-connect to 5x bs seepage pit (27 bi) per plan Date: March 23, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 12, 2004 | Permit id: 0403230009 | |||||
SCORE 99 Date: June 8, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 14, 2004 | Permit id: 0406010007 | |||||
SCORE 99 Date: June 4, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 24, 2004 | Permit id: 0406040005 | |||||
SCORE 99 Date: July 23, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction Co. | Permit status: Finaled | Completion date: August 11, 2004 | Permit id: 0407230001 | |||||
SCORE 99 Date: August 12, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: August 13, 2004 | Permit id: 0408120007 | |||||
SCORE 99 Date: November 4, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Permit id: 0411040018 | |||||
SCORE 99 Date: November 15, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 27, 2004 | Permit id: 0411150004 | |||||
SCORE 99 Date: May 17, 2005 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 15, 2005 | Permit id: 0505170019 | |||||
SCORE 99 2056 Skyview Dr Altadena Ca 91001 Install 10 gal fiberglass septic tank and of leach line 3 wide 3 rock below the pipe Date: July 7, 2005 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 4, 2006 | Permit id: 0507070012 | |||||
SCORE 99 Date: September 7, 2005 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 13, 2005 | Permit id: 0509070005 | |||||
SCORE 99 Date: October 12, 2005 Contractor: Gopher Construction Co Applicant: Gopher Construction Company | Permit status: Finaled | Completion date: November 1, 2006 | Permit id: 0510120002 | |||||
SCORE 99 Date: November 28, 2005 Contractor: Gopher Construction Co Applicant: Donoghue Richard | Permit status: Finaled | Completion date: December 13, 2005 | Permit id: 0511280001 | |||||
SCORE 99 Date: January 19, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: January 27, 2007 | Permit id: 0701190001 | |||||
SCORE 99 Date: January 30, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: February 2, 2007 | Permit id: 0701300025 | |||||
SCORE 99 Date: March 27, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: May 2, 2007 | Permit id: 0703270001 | |||||
SCORE 99 2368 Caracas St Los Angeles Ca Connect existing sfr to public sewer. Cannot verify existing septic system was pumped,work done w/o permit or inspection. Date: April 5, 2007 Contractor: Gopher Construction Co Applicant: Tom | Permit status: Finaled | Completion date: April 17, 2007 | Permit id: 0704050005 | |||||
SCORE 99 31 Brookhill St Los Angeles Ca Abandon cesspool,add backwater valve & connect portion of the res connected to cesspool to onsite sewer lateral. Date: April 26, 2007 Contractor: Gopher Construction Co Applicant: Tom | Permit status: Permisud | Permit id: 0704260008 | |||||
SCORE 99 2659 Tanoble Dr Los Angeles Ca Saddle mainline and connect existing sfr to public sewer not vaild without road excavation permit (626) 338-9515. Date: July 30, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: July 31, 2007 | Permit id: 0707300005 | |||||
SCORE 99 Date: August 8, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 2, 2008 | Permit id: 0708080003 | |||||
SCORE 99 Date: October 19, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 25, 2008 | Permit id: 0710190001 | |||||
SCORE 99 4188 Aralia Rd Altadena Ca 91001 Repair sewer lateral and on site house connection. Calosha no. 2007-902604. Date: April 10, 2008 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 15, 2008 | Permit id: 0804100009 | |||||
SCORE 99 Date: September 14, 2009 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 29, 2009 | Permit id: 0909140001 | |||||
SCORE 99 Date: April 14, 2011 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 26, 2011 | Permit id: 1104140003 | |||||
SCORE 99 Date: August 4, 2011 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Permisud | Permit id: 1108040001 | |||||
SCORE 99 Date: October 13, 2011 Contractor: Gopher Construction Co Applicant: Cerventa Diana | Permit status: Finaled | Completion date: April 18, 2014 | Permit id: 1110130010 | |||||
SCORE 99 Date: October 27, 2011 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: November 15, 2011 | Permit id: 1110270009 | |||||
SCORE 99 1417 Palm St Altadena Ca 91001 Install a 12 gal septic tank in front of yard,7 gal in back yard,and a 51 ft long x 3 ft wide leach line,per health department approved plan. Date: December 3, 2012 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: March 19, 2014 | Permit id: 1212030003 | |||||
SCORE 99 871 Madre St Pasadena Ca 91107 Install sewer connection from house to public,and abandon septic system. Date: December 26, 2012 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: January 3, 2013 | Permit id: 1212260006 | |||||
SCORE 99 3511 Mountain View Av Pasadena Ca 91107 Connect existing sfr to public sewer and backfill abandon septic system. Date: October 7, 2013 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: October 8, 2013 | Permit id: 1310070003 | |||||
SCORE 99 Date: October 23, 2013 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: October 24, 2013 | Permit id: 1310230001 | |||||
SCORE 99 Date: February 20, 2014 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: March 16, 2014 | Permit id: 1402200003 | |||||
SCORE 99 Date: July 24, 2014 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: July 30, 2014 | Permit id: 1407240006 | |||||
SCORE 99 945 Chapea Rd Pasadena Ca 91107 Install new 20 gal septic and connection to existing seepage pit. Health dept approval 9/29/99 Date: January 18, 2000 Contractor: Gopher Construction Co Applicant: Gopher Constructin | Permit status: Finaled | Completion date: September 6, 2000 | Permit id: 9911100005 | |||||
SCORE 99 945 Chapea Rd Pasadena Ca Install new 20 gal septic and connection to existing seepage pit. Health dept approval 9 29 99 Date: January 18, 2000 Contractor: Gopher Construction Co Applicant: Gopher Constructin | Permit status: Finaled | Completion date: September 6, 2000 | Expiration date: July 16, 2000 | Permit id: 9911100005 | |||||
SCORE 99 15987 Fairgrove Av La Puente Ca Install on site sewer connection from property line to rear of house and abandon septic system. Date: October 1, 2012 Contractor: Gopher Construction Co Applicant: Diana Cervenka | Permit status: Permisud | Expiration date: October 1, 2013 | Permit id: 1210010004 | |||||
SCORE 99 Date: October 18, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction Company | Permit status: Finaled | Completion date: September 23, 2008 | Expiration date: April 15, 2008 | Permit id: 710180005 | |||||
SCORE 99 29226 Verdale Stevenson Ranch Ca Install 15 gal septic tank, 5x16 bi (21bs) seepage pit with 1 ax filter pods advantex Date: October 8, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Expiration date: April 6, 2005 | Permit id: 410080004 | |||||
SCORE 99 29218 Verdale Stevenson Ranch Ca Install 15 gal. Septic tank, 5x16 bi (21bs) seepage pit with 1 ax filter pods advantex Date: October 8, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 25, 2005 | Expiration date: April 6, 2005 | Permit id: 410080005 | |||||
SCORE 99 Date: May 13, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: May 16, 2003 | Expiration date: November 9, 2003 | Permit id: 305130003 | |||||
SCORE 99 Date: September 4, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 14, 2001 | Expiration date: March 3, 2002 | Permit id: 109040004 | |||||
SCORE 99 12032 East Tr Sylmar Ca For perculation test purposes only install 35 bs overflow seepage pit & ground water test hole for perculation testing. Date: July 10, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: August 30, 2001 | Expiration date: January 6, 2002 | Permit id: 107100015 | |||||
SCORE 99 Date: September 14, 2009 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Expiration date: September 14, 2010 | Permit id: 909140029 | |||||
SCORE 99 Date: February 23, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co | Permit status: Finaled | Completion date: March 3, 2000 | Expiration date: August 21, 2000 | Permit id: 2230015 | |||||
SCORE 99 Date: April 6, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 11, 2001 | Expiration date: October 3, 2001 | Permit id: 104060010 | |||||
SCORE 99 Date: September 5, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 13, 2002 | Expiration date: March 4, 2003 | Permit id: 209050027 | |||||
SCORE 99 28 Mary St Los Angeles Ca Replace water service from meter house, some repipe at underfloor only and install line for sprinkler Date: May 21, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 5, 2003 | Expiration date: November 17, 2003 | Permit id: 305210006 | |||||
SCORE 99 Date: September 14, 2009 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 24, 2009 | Expiration date: September 14, 2010 | Permit id: 909140018 | |||||
SCORE 99 Date: May 12, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 22, 2000 | Expiration date: November 8, 2000 | Permit id: 5120034 | |||||
SCORE 99 Date: June 13, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co. | Permit status: Finaled | Completion date: June 27, 2000 | Expiration date: December 10, 2000 | Permit id: 6130002 | |||||
SCORE 99 Date: June 15, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co | Permit status: Finaled | Completion date: June 22, 2000 | Expiration date: December 12, 2000 | Permit id: 6150008 | |||||
SCORE 99 Date: November 16, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: February 13, 2001 | Expiration date: May 16, 2001 | Permit id: 11160017 | |||||
SCORE 99 1945 Altadena Dr Altadena Ca Instl. 12 gal. Sept. Tank&17b. Surf. Seepage pit., connect to 1 existing seepage pit, abandon cesspool Date: December 15, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Expiration date: June 14, 2001 | Permit id: 12150003 | |||||
SCORE 99 Date: February 16, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 4, 2001 | Expiration date: August 15, 2001 | Permit id: 102160058 | |||||
SCORE 99 Date: March 7, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: October 30, 2001 | Expiration date: September 3, 2001 | Permit id: 103070006 | |||||
SCORE 99 Date: March 7, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 7, 2001 | Expiration date: September 3, 2001 | Permit id: 103070007 | |||||
SCORE 99 Date: March 21, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 4, 2001 | Expiration date: September 17, 2001 | Permit id: 103210010 | |||||
SCORE 99 Date: April 6, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 11, 2001 | Expiration date: October 3, 2001 | Permit id: 104060026 | |||||
SCORE 99 Date: May 23, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: February 27, 2002 | Expiration date: November 19, 2001 | Permit id: 105230005 | |||||
SCORE 99 Date: June 20, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 4, 2002 | Expiration date: December 17, 2001 | Permit id: 106200002 | |||||
SCORE 99 Date: August 23, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: August 28, 2001 | Expiration date: February 19, 2002 | Permit id: 108230016 | |||||
SCORE 99 Date: October 2, 2001 Contractor: Gopher Construction Co Applicant: Gopher Cons. | Permit status: Finaled | Completion date: October 8, 2001 | Expiration date: March 31, 2002 | Permit id: 110020008 | |||||
SCORE 99 331 Roosevelt Av Pasadena Ca Connect house sewer to public sewer, abandon psds, install back water valve Date: October 9, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: October 10, 2001 | Expiration date: April 7, 2002 | Permit id: 110090006 | |||||
SCORE 99 3219 Fairpoint St Pasadena Ca Install 15 gal septic tank & bi (33bs) seepage pit, abandon cesspool, connect (2) existing seepage pits Date: October 9, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: July 25, 2008 | Expiration date: April 7, 2002 | Permit id: 110090007 | |||||
SCORE 99 2835 Holliston Av Altadena Ca Install 15 gal septic tank & 31below inlet & below surface seepage pit. Date: October 15, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Expiration date: April 13, 2002 | Permit id: 110150007 | |||||
SCORE 99 325 Berkeley Av Pasadena Ca Connect existing sfr to public sewer, make connection at property line & at house. Pipe installed under se0007130001 install backwater valve. Date: October 15, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 14, 2001 | Expiration date: April 13, 2002 | Permit id: 110150008 | |||||
SCORE 99 Date: January 3, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: January 8, 2002 | Expiration date: July 2, 2002 | Permit id: 201030003 | |||||
SCORE 99 Date: April 11, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: July 19, 2002 | Expiration date: October 8, 2002 | Permit id: 204110019 | |||||
SCORE 99 Date: June 6, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 23, 2002 | Expiration date: December 3, 2002 | Permit id: 206060040 | |||||
SCORE 99 Date: July 17, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 23, 2002 | Expiration date: January 13, 2003 | Permit id: 207170002 | |||||
SCORE 99 Date: September 5, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 13, 2002 | Expiration date: March 4, 2003 | Permit id: 209050007 | |||||
SCORE 99 3554 Hollyslope Rd Altadena Ca Install 10 gal. Septic tank to replace exis. Tank in area of construction Date: September 17, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 18, 2002 | Expiration date: March 16, 2003 | Permit id: 209170008 | |||||
SCORE 99 2441 Ganesha Av Altadena Ca Extd. Lat. 12from curb to p. L.,connect sfr to public sewer, abandon cesspool and seepage pits Date: October 8, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction Co. | Permit status: Finaled | Completion date: October 15, 2002 | Expiration date: April 6, 2003 | Permit id: 210080006 | |||||
SCORE 99 Date: November 5, 2002 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Completion date: November 7, 2002 | Expiration date: May 4, 2003 | Permit id: 211050007 | |||||
SCORE 99 Date: March 5, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 1, 2003 | Expiration date: September 1, 2003 | Permit id: 303050006 | |||||
SCORE 99 Date: March 28, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 1, 2003 | Expiration date: September 24, 2003 | Permit id: 303280008 | |||||
SCORE 99 36 Silver Spruce Ln Altadena Ca Connect existing sfr to public sewer & abandon existing private disposal system. Date: April 18, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 24, 2003 | Expiration date: October 15, 2003 | Permit id: 304180010 | |||||
SCORE 99 Date: December 8, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 11, 2003 | Expiration date: June 5, 2004 | Permit id: 312080001 | |||||
SCORE 99 19615 Covina Hills R Covina Ca Install 15 gallon septic tank & advantex ax denitrificat ion unit-connect to 5x bs seepage pit (27 bi) per plan Date: March 23, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 12, 2004 | Expiration date: September 19, 2004 | Permit id: 403230009 | |||||
SCORE 99 Date: June 4, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 24, 2004 | Expiration date: December 1, 2004 | Permit id: 406040005 | |||||
SCORE 99 Date: July 23, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction Co. | Permit status: Finaled | Completion date: August 11, 2004 | Expiration date: January 19, 2005 | Permit id: 407230001 | |||||
SCORE 99 Date: August 12, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: August 13, 2004 | Expiration date: February 8, 2005 | Permit id: 408120007 | |||||
SCORE 99 Date: November 4, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Expiration date: May 3, 2005 | Permit id: 411040018 | |||||
SCORE 99 Date: May 17, 2005 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 15, 2005 | Expiration date: November 13, 2005 | Permit id: 505170019 | |||||
SCORE 99 2056 Skyview Dr Altadena Ca Install 10 gal fiberglass septic tank and of leach line 3 wide 3 rock below the pipe Date: July 7, 2005 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 4, 2006 | Expiration date: January 3, 2006 | Permit id: 507070012 | |||||
SCORE 99 Date: September 7, 2005 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 13, 2005 | Expiration date: March 6, 2006 | Permit id: 509070005 | |||||
SCORE 99 Date: November 28, 2005 Contractor: Gopher Construction Co Applicant: Donoghue Richard | Permit status: Finaled | Completion date: December 13, 2005 | Expiration date: May 27, 2006 | Permit id: 511280001 | |||||
SCORE 99 Date: January 19, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: January 27, 2007 | Expiration date: July 18, 2007 | Permit id: 701190001 | |||||
SCORE 99 Date: January 30, 2007 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: February 2, 2007 | Expiration date: July 29, 2007 | Permit id: 701300025 | |||||
SCORE 99 Date: March 27, 2007 Contractor: Gopher Construction Co Engineer: Resur Bongolan | Applicant: Gopher Construction | Permit status: Finaled | Completion date: May 2, 2007 | Expiration date: September 23, 2007 | Permit id: 703270001 | |||||
SCORE 99 Date: October 19, 2007 Contractor: Gopher Construction Co Engineer: Don Watts | Applicant: Gopher Construction | Permit status: Finaled | Completion date: June 25, 2008 | Expiration date: April 16, 2008 | Permit id: 710190001 | |||||
SCORE 99 4188 Aralia Rd Altadena Ca Repair sewer lateral and on site house connection. Calosha no. 2007-902604. Date: April 10, 2008 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 15, 2008 | Expiration date: October 7, 2008 | Permit id: 804100009 | |||||
SCORE 99 Date: September 14, 2009 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: September 29, 2009 | Expiration date: September 14, 2010 | Permit id: 909140001 | |||||
SCORE 99 Date: April 14, 2011 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: April 26, 2011 | Expiration date: April 13, 2012 | Permit id: 1104140003 | |||||
SCORE 99 Date: August 4, 2011 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Permisud | Expiration date: August 3, 2012 | Permit id: 1108040001 | |||||
SCORE 99 Date: October 13, 2011 Contractor: Gopher Construction Co Applicant: Cerventa Diana | Permit status: Finaled | Completion date: April 18, 2014 | Expiration date: October 12, 2012 | Permit id: 1110130010 | |||||
SCORE 99 Date: October 27, 2011 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: November 15, 2011 | Expiration date: October 26, 2012 | Permit id: 1110270009 | |||||
SCORE 99 1417 Palm St Altadena Ca Install a 12 gal septic tank in front of yard, 7 gal in back yard, and a 51 ft long x 3 ft wide leach line, per health department approved plan. Date: December 3, 2012 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: March 19, 2014 | Expiration date: December 3, 2013 | Permit id: 1212030003 | |||||
SCORE 99 Date: December 26, 2012 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: January 3, 2013 | Expiration date: December 26, 2013 | Permit id: 1212260006 | |||||
SCORE 99 3511 Mountain View A Pasadena Ca Connect existing sfr to public sewer and backfill abandon septic system. Date: October 7, 2013 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: October 8, 2013 | Expiration date: October 7, 2014 | Permit id: 1310070003 | |||||
SCORE 99 Date: October 23, 2013 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: October 24, 2013 | Expiration date: October 23, 2014 | Permit id: 1310230001 | |||||
SCORE 99 Date: February 20, 2014 Contractor: Gopher Construction Co Applicant: Cervenka Diana | Permit status: Finaled | Completion date: March 16, 2014 | Expiration date: February 20, 2015 | Permit id: 1402200003 | |||||
SCORE 99 31 Brookhill St Los Angeles Ca Install sewer ejector pump. Inspector to coordinate w roscoe king for inspections. (626) 458-3182 Date: April 26, 2007 Contractor: Gopher Construction Co Applicant: Tom | Permit status: Finaled | Completion date: September 18, 2015 | Expiration date: October 23, 2007 | Permit id: 704260028 | |||||
SCORE 99 Date: July 23, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction Co. | Permit status: Finaled | Completion date: August 11, 2004 | Expiration date: January 19, 2005 | Permit id: 407230001 | |||||
SCORE 99 2368 Caracas St Los Angeles Ca Connect existing sfr to public sewer. Cannot verify existing septic system was pumped,work done w o permit or inspection. Date: April 5, 2007 Contractor: Gopher Construction Co Engineer: Kate Kim | Applicant: Tom | Permit status: Finaled | Completion date: April 17, 2007 | Expiration date: October 2, 2007 | Permit id: 704050005 | |||||
SCORE 99 Date: October 15, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 14, 2001 | Expiration date: April 13, 2002 | Permit id: 110150033 | |||||
SCORE 99 1879 Altadena Dr Altadena Ca Install 15 gal septic tank & 46 1/2 bi seepage pit & abandon old cesspool & seepage pit. Date: February 23, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction Co | Permit status: Finaled | Completion date: March 3, 2000 | Expiration date: August 21, 2000 | Permit id: 2230004 | |||||
SCORE 99 Date: December 19, 2000 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 20, 2000 | Expiration date: June 18, 2001 | Permit id: 12190004 | |||||
SCORE 99 0 Star Route Los Angeles Ca Percolation test pits for seepage pits, three 27bi (47bs) 3 seepage pits. Clear creek outdoor educatio ctr tg. 505/g1 Date: February 16, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Permisud | Expiration date: August 15, 2001 | Permit id: 102160060 | |||||
SCORE 99 676 Las Flores Dr Altadena Ca Connect existing sfr to public sewer. Connected in rear of property, in s/w corner of property. Abandon cesspool & pits Date: December 6, 2001 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 11, 2002 | Expiration date: June 4, 2002 | Permit id: 112060013 | |||||
SCORE 99 Date: November 24, 2003 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: January 14, 2004 | Expiration date: May 22, 2004 | Permit id: 311240007 | |||||
SCORE 99 Date: November 15, 2004 Contractor: Gopher Construction Co Applicant: Gopher Construction | Permit status: Finaled | Completion date: December 27, 2004 | Expiration date: May 14, 2005 | Permit id: 411150004 |