Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 1884 E 17 S Salt Lake City, Ut 84108 Replace shingles on roof replace plumbing finish basement bathroom move kitchen sink remodel main bathroom remodel master bathroom move floor drain move water heater (replace old water heater) dig out and replace 3 basement windows with egress windows add lighting and smoke detectors replace old breaker box fix broken porch handrail replace and add some backyard fencing. Replace shingles on roof- remove existing shingles and replace with new. There are about 6 layers of shingles and i want to start fresh by removing the 6 layers of shingles and adding a 25 year life shingle in its place. The roof sheeting (boards under the shingles) is in good condition and that will not be replaced. Replace plumbing- replace existing galvanized steel plumbing with updated non-metal pipe throughout the house. Finish basement bathroom- basement bathroom is plumbed, but unfinished. I will be adding a toilet, sink, and bathtub in the spots that were plumbed for it. Move kitchen sink- move the sink from th Date: May 2, 2016 Contractor: Goldman Sugarhouse Remodelmichael Goldman Permit status: Inspections | Current use: Residential | Permit id: Bld2016-03046 | |||||
SCORE 59 Salt Lake City Ut 84108 Replace shingles on roof replace plumbing finish basement bathroom move kitchen sink remodel main bathroom remodel master bathroom move floor drain move water heater (replace old water heater) dig out and replace 3 basement windows with egress windows add lighting and smoke detectors replace old breaker box fix broken porch handrail replace and add some backyard fencing. Replace shingles on roof- remove existing shingles and replace with new. There are about 6 layers of shingles and i want to start fresh by removing the 6 layers of shingles and adding a 25 year life shingle in its place. The roof sheeting (boards under the shingles) is in good condition and that will not be replaced. Replace plumbing- replace existing galvanized steel plumbing with updated non-metal pipe throughout the house. Finish basement bathroom- basement bathroom is plumbed, but unfinished. I will be adding a toilet, sink, and bathtub in the spots that were plumbed for it. Move kitchen sink- move the sink from th Date: May 2, 2016 Contractor: Goldman Sugarhouse Remodelmichael Goldman Permit status: Inspections | Current use: Residential | Permit id: Bld2016-03046 |