Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 3222 M St Nw, Washington, Dc 20007 1. Remove existing metal roofing and haul debris from premises. 2. Remove existing flat roof membrane from rear flat roof and haul debris. 3. Install new metal roofing panels and new flat roof membrane where roofing membrane and metal roofing were previously removed . 4. Traditional detailing of metal to match existing, including hand-crimped seams and ridge as shown in supplemental information dated 3/9/12. Date: April 12, 2012 Contractor: Ginger Laytham; Manny Campos Client: Ginger Laytham | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1203911 |