Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 2299 Post St San Francisco Ca Remodel existing medical office space add 1 fah coil unit add 2 dx split systems. Current use: Condominium | Permit id: #200602225131 | |||||
SCORE 96 1 Spear St San Francisco Ca Suite 11 mech ti - 4 new fsds for corridors new 1. 5ton ac cap and new duct work relo supplys (plenum ceiling) Current use: Office | Permit id: #200708220530 | |||||
SCORE 96 1 Spear St San Francisco Ca Remodeling an (e) tenant space. 1 new a c unit for server room. Altering new duct work Current use: Office | Permit id: #200803278118 | |||||
SCORE 96 1 Spear St San Francisco Ca Re-work (e) hvac to meet new layout. Addd two 5 ton water source heat pump to server idf room. Reference t. I. Pa# 2008-1202-7559 Current use: Office | Permit id: #200812047795 | |||||
SCORE 96 1 Spear St San Francisco Ca #10 - rework (e) hvac to meet new layout. Add 1 2 ton. Ductless split system for server. Ref. 200812027562. Current use: Office | Permit id: #200812118260 | |||||
SCORE 96 1 Spear St San Francisco Ca Rework e hvac to meet new layout add 14 new vav add 2 efs. Ref 200902182289 Current use: Office | Permit id: #200903053405 | |||||
SCORE 96 1098 Harrison St San Francisco Ca Refer to arch pa# 2011-0826-3324-re-work (e) hvac system add 5 heat pumps for conference rooms Current use: Office | Permit id: #201109215165 | |||||
SCORE 96 1 Spear St San Francisco Ca 8th & 9th floor suite 8 & 9 - add (1) 1. 5 ton ac unit to server room add exhaust fan to electrical room add (2) reheat vavs for (2) new confernece room rework (e) hvac to meet new layout. Current use: Office | Permit id: #201202013333 | |||||
SCORE 96 1 Spear St San Francisco Ca Remodeling an existing tenant area space. Add return air registers to new offices as need. Atler 16 existing reheat to meet new layout. Rework 9 existing cooling only vav to meet new layout. Relocate t-stat controls. Ti will be air balanced and comply to t24 design specification. Add (1) 3 ton Current use: Office | Permit id: #201203276953 | |||||
SCORE 96 5 03rd St San Francisco Ca Relocate one (e) pnuematic thermostat. Provide and install one 5 ton heat pump fan coil to service two conference rooms and two phone rooms. Provide and install one 2 ton wall mounted ductless ac only unit for the server room. Hang condersers in garbage storage area with discharge air thru louver Current use: Office | Permit id: #201209109288 | |||||
SCORE 96 1 Spear St San Francisco Ca 8th & 9th floor suite 8 & 9 - add (1) 1. 5 ton ac unit to server room add exhaust fan to electrical room add (2) reheat vavs for (2) new confernece room rework (e) hvac to meet new layout. Permit type: Building permit | Expiration date: February 21, 2013 | Current use: Office | Permit id: #201202013333 | |||||
SCORE 96 1 Spear St San Francisco Ca Remodeling an existing tenant area space. Add return air registers to new offices as need. Atler 16 existing reheat to meet new layout. Rework 9 existing cooling only vav to meet new layout. Relocate t-stat controls. Ti will be air balanced and comply to t24 design specification. Add (1) 3 ton Permit type: Building permit | Expiration date: September 30, 2012 | Current use: Office | Permit id: #201203276953 | |||||
SCORE 96 5 03rd St San Francisco Ca Relocate one (e) pnuematic thermostat. Provide and install one 5 ton heat pump fan coil to service two conference rooms and two phone rooms. Provide and install one 2 ton wall mounted ductless ac only unit for the server room. Hang condersers in garbage storage area with discharge air thru louver Permit type: Building permit | Expiration date: September 10, 2013 | Current use: Office | Permit id: #201209109288 | |||||
SCORE 96 1098 Harrison St San Francisco Ca Refer to arch pa# 2011-0826-3324-re-work (e) hvac system add 5 heat pumps for conference rooms Permit type: Building permit | Expiration date: October 12, 2012 | Current use: Office | Permit id: #201109215165 |