Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 18 Farwell Pl Cambridge, Ma The proposed work was approved by the historic commission at the hearing on august 4, 2016. The zoning board of appeals approved a special permit for the proposed work on august 25, 2016. As the homeowner, i would like to be the general contractor. I will sub out the work only to licensed contractors with workers comp insurance and liability insurance. (please advise if i should submit this as one permit or multiple permits, so we can begin the work that does not need to wait for the completetion of the zba process.) most of the building structual work will be done by alford chute. He is the highly skilled contractor who has underpinned virtually all of the settling rowhouses on the flat of beacon hill and the back bay due to the falliing water table. The electrical contractor will be mike sullivan. The plumbing contractor will james foy. And the central air will be installed by atlantic plumbing and heating using the unico system. (i believe atlantic will pull its own permit.) here is Permit type: Addition/alteration | Completion date: October 25, 2016 | Current use: Two-family | Permit id: 0 | Parcel: 16918 |