Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 8 O St Nw, Washington, Dc 20001 The earth retention consists of a driven steel h-pile system at the complete perimeter of the below grade parking structure. The earth retention system will use a combination of tiebacks and interior steel braces to support the lateral forces. The adjacent townhouse structure shall be use bracket piles to support the existing building foundation. ![]() Client: Four Points Llc | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1700003 |