Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Date: June 17, 2014 Contractor: Fort Myer Construction Fort Myer Construction Permit status: Expired | Expiration date: October 6, 2014 | Permit id: Pa10145801 | |||||
SCORE 89 Date: June 17, 2014 Contractor: Fort Myer Construction Fort Myer Construction Permit status: Expired | Expiration date: October 6, 2014 | Permit id: Pa10145801 | |||||
SCORE 89 Date: June 17, 2014 Contractor: Fort Myer Construction Fort Myer Construction Permit status: Expired | Expiration date: October 6, 2014 | Permit id: Pa10145801 | |||||
SCORE 89 Date: February 13, 2015 Contractor: Fort Myer Construction Fort Myer Construction Permit status: Expired | Expiration date: April 15, 2015 | Permit id: Pa10177086 | |||||
SCORE 89 Date: June 17, 2014 Contractor: Fort Myer Construction Fort Myer Construction Permit status: Expired | Expiration date: October 6, 2014 | Permit id: Pa10145801 | |||||
SCORE 89 Date: June 17, 2014 Contractor: Fort Myer Construction Fort Myer Construction Permit status: Expired | Expiration date: October 6, 2014 | Permit id: Pa10145801 | |||||
SCORE 89 14 1499 Block Of V Street Nw Washington Dc Over head work; pole installation (single or first one), over head work; string electrical wire Date: March 6, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: May 4, 2017 | Permit id: Pa187174 | |||||
SCORE 89 Date: January 5, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: March 9, 2017 | Permit id: Pa187703 | |||||
SCORE 89 1011 M Street Nw Washington Dc Over head work; pole installation (single or first one), over head work; streetlight(s) installation Date: January 14, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: July 25, 2016 | Permit id: Pa119957 | |||||
SCORE 89 2124 I Street Nw Washington Dc Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Fort Myer Construction Fort Myer Construction Permit status: 3 | Expiration date: May 31, 2016 | Permit id: 0 | |||||
SCORE 89 1211 23rd Street Nw Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (single or first one), over head work; streetlight(s) installation Date: January 26, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: March 30, 2017 | Permit id: Pa187197 | |||||
SCORE 89 701 2nd Street Ne Washington Dc Excavation; manhole frame and cover (adjust), over head work; streetlight temporary removal Date: March 28, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: June 1, 2017 | Permit id: Pa199462 | |||||
SCORE 89 1785 Massachusetts Avenue Nw Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Date: January 26, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: March 23, 2017 | Permit id: Pa184132 | |||||
SCORE 89 1111 24th Street Nw Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Date: January 5, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: February 26, 2017 | Permit id: Pa186612 | |||||
SCORE 89 Date: May 22, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 9 | Expiration date: July 20, 2017 | Permit id: Pa204374 | |||||
SCORE 89 301 M Street Sw Washington Dc Fixture; traffic signal installation, excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Fort Myer Construction Fort Myer Construction Permit status: 10 | Expiration date: February 1, 2018 | Permit id: 0 | |||||
SCORE 89 9 New York Avenue Nw Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation, excavation; repair electric ml conduit, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight temporary removal, over head work; streetlight(s) installation Date: March 20, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: May 25, 2017 | Permit id: Pa199796 | |||||
SCORE 89 911 2nd Street Ne Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (single or first one), over head work; streetlight(s) installation, over head work; streetlight damage deposit (office use only) Date: May 5, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 9 | Expiration date: July 6, 2017 | Permit id: Pa202721 | |||||
SCORE 89 1785 Massachusetts Avenue Nw Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Fort Myer Construction Fort Myer Construction Permit status: 1 | Expiration date: September 19, 2017 | Permit id: 0 | |||||
SCORE 89 Date: April 13, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 8 | Expiration date: April 13, 2017 | Permit id: Pa198700 | |||||
SCORE 89 2124 I Street Nw Washington Dc Over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Fort Myer Construction Fort Myer Construction Permit status: 3 | Expiration date: May 31, 2016 | Permit id: 0 | |||||
SCORE 89 301 M Street Sw Washington Dc Fixture; traffic signal installation, excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Fort Myer Construction Fort Myer Construction Permit status: 10 | Expiration date: February 1, 2018 | Permit id: 0 | |||||
SCORE 89 14 1499 Block Of V Street Nw Washington Dc Excavation; electric connection (trench), excavation; electric ml conduit (trench), excavation; manhole installation, over head work; streetlight(s) installation, over head work; pole removal (single or first one), over head work; streetlight damage deposit (office use only) Date: October 13, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit status: 9 | Expiration date: December 14, 2017 | Permit id: Pa220123 | |||||
SCORE 89 1011 M Street Nw Washington Dc Installation of #16 cast iron street light pole, 1 watt led king luminaire post top fixture with globe, one street light foundation, lf of 2" pvc concrete encased conduit, feeder size of wire to be 2-# rhw-2 and 1-#8 bare ground wire between the fixture and the pepco manholeto the east of the pole but in front of 1011 m street, nw. Date: December 2, 2015 Contractor: Fort Myer Construction Fort Myer Construction Client: Fort Myer Construction Corp | Permit type: Over head work; pole | |||||
SCORE 89 2124 I Street Nw Washington Dc N/s h street, nw install 2 twin- street light poles with 1 watt led light fixtures, remove 1 #16 cast iron existing sl pole with fixture s/s i street, nw install 2 #16 cast iron street light poles with 1 watt led light fixtures, remove 1 28 ft pp street pole with fixture Date: January 12, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; pole installation | Permit status: Cancel/withdrawn | Expiration date: May 31, 2016 | |||||
SCORE 89 1011 M Street Nw Washington Dc Installation of #16 cast iron street light pole, 1 watt led king luminaire post top fixture with globe, one street light foundation, lf of 2" pvc concrete encased conduit, feeder size of wire to be 2-# rhw-2 and 1-#8 bare ground wire between the fixture and the pepco manholeto the east of the pole but in front of 1011 m street, nw. Date: July 19, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; pole installation (single or first one), over head work; streetlight(s) installation | Permit status: Issued | Expiration date: September 23, 2016 | Permit id: Pa119957-R1 | |||||
SCORE 89 2124 I Street Nw Washington Dc N s h street, nw install 2 twin- street light poles with 1 watt led light fixtures, remove 1 #16 cast iron existing sl pole with fixture s s i street, nw install 2 #16 cast iron street light poles with 1 watt led light fixtures, remove 1 28 ft pp street pole with fixture Date: January 12, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; pole installation | Permit status: Cancel/withdrawn | Expiration date: May 31, 2016 | |||||
SCORE 89 1785 Massachusetts Avenue Nw Washington Dc F i two 3x3x3 manholes. F i one twin light pole with 2 1 led fixtures. F i one dc-16 pole with one 1 watt led fixture. Trench in one 2" concrete encased pvc with 2# and 1 #8 approx. 222 feet. Trench in 2 concrete encased 4" pvc with 3#4 and 1#2 ground, approx. 59 feet. Remove 2 existing dc-16 poles and remove 2 old foundation and install 2 new foundations. Reinstall existing dc-16 poles on new foundations with new 1 watt led fixtures. F i one new 2 watt led fixture on existing pole. Paint 2 existing traffic poles black. Date: September 21, 2016 Contractor: Fort Myer Construction Fort Myer Construction Client: Fort Myer Construction | Permit type: Excavation; electric ml conduit | Permit status: Assigned | Expiration date: March 9, 2017 | |||||
SCORE 89 1111 24th Street Nw Washington Dc Install streetlights, conduit, foundations, manholes cables per plans around 1111 24th st, nw. West end residential properties, square 37, 3- #16 ci pole, with 1 w led lights, 1 manhole on 23rd st side of the building, 4-#16 ci poles, with 1 w led lights, 2 manholes on the l st side of building, 2- #16 ci pole, with 1 w led lights, 1 manhole on the 24th st side of the building, paint two pendant poles, 1 on the nwc 23rd & l st & 1 on the nec 24th & l st, remove arms and fixtures on the two pendant poles, install decorative arm with 2 w led fixtures. Penetrate 3 pepco manholes for new street light feeder points. Date: November 15, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Issued | Expiration date: February 26, 2017 | Permit id: Pa186612 | |||||
SCORE 89 I Street Nw And 10th Street Nw Washington Dc To reair 8 dc street lights that were put out due to a pedersrian under ground tunnel installation, we will need to run 3- 4 & 1- #2 g wire between existing dc manhole m and dc manhole m48, from the 9 block of i sreet, nw to the west side of 10th street, nw through existing dc sl conduit. Make splices in dc manhole #m20, m48 and m47. We wil have to run 1" flex conduit between dc manhole m47 to l67-16. Light l68-16 was removed by others, the following lights are currently out l71-pp, l72-16, l70-16, l69-16, l67-16, l66-16 and l65-16. This temporary wiring will stay in place until the conduit in the roadway is restored. Some time in late 2017. Date: December 7, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; string electrical wire | Permit status: Issued | Expiration date: March 9, 2017 | Permit id: Pa187703 | |||||
SCORE 89 1211 23rd Street Nw Washington Dc Install two (2) -4' x 4" dc sl manholes, four (4) foundations, conduit, sl cables, tie into pepco manhole for new sl power source, install three (3) #16 cast iron poles, three (3)- #16 pole foundations, three (3) 1 watt led post top fixtures, one (1) 28 ft pendant pole with 8 ft arm, decorative wrap, 2 watt led tear drop fixture. Remove one(1) 28 ft pendant pole with 8 ft arm, fixture, t-base, foundation and feeder cable. Date: November 28, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Resubmitted | Expiration date: October 30, 2017 | |||||
SCORE 89 501 New York Avenue Ne Washington Dc Fmcc has been ask to complete the dc ddot electrical punch list that was created by tony lawson, dc ddot electrical inspector, under permit #pa120488, (dated 1. 26. 16 to 3. 25. 16 and is attached) the new hampton inn at 501 new york ave, ne, we will have to bring in 3 temporary concrete partial foundations, remove and place 3 existing twin poles on the temporary foundations, back feeding them to have them work at night. Remove the 3 rejected foundations, install new foundations, then place the existing poles, fixtures on the new foundations, pull new wire back to the feeder manholes re connect the lights and remove the temporary foundations. The same poles,fixtures, globe will be reused. Date: January 3, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; streetlight temporary removal | Permit status: Assigned | Expiration date: March 31, 2017 | |||||
SCORE 89 9 New York Avenue Nw Washington Dc Install (4) 4x4 manholes, (5) twin-20's with 1 watt led, install ductbank(s) and (5) foundations. Remove (4) existing twin-20's and foundations. Install conduit and wiring per drawing. On new york avenue, 10th street, and i street nw. Date: January 25, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Assigned | Expiration date: January 1, 2018 | |||||
SCORE 89 701 2nd Street Ne Washington Dc This permit application is to make all the correction on the street lighting punch list created by mr. Tony lawson dc ddot electrical inspection at the street and alley light project at 701 2nd street, ne installed by r. E. Hinkle and power design. Attached you will find a detailed list or scope of work that must be done a each pole, manhole to obtain the dc ddot final acceptance letter on the lighting system. L1- #16 cast iron pole must be replaced, replace the 3 lights hanging under h street bridge over 2nd street, ne, l3- foundation must be removed and replaced, was rejected by mr. Lawson, mh #1 replace frame and cover, makes splices and install cables and grounding system, mh #2 replace frame and cover, make splices and install cables and grounding system, mh #3 replace frame and cover, make splices and install cables and grounding system, pepco manhole install bell ends, install cables, clean manhole floor, l11 1st 5-a pole in alley install grounding system, mh #4 install cables ma Date: May 17, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; manhole frame and cover (adjust), over head work; streetlight temporary removal | Permit status: Issued | Expiration date: July 31, 2017 | Permit id: Pa199462-R1 | |||||
SCORE 89 301 M Street Sw Washington Dc New building at 301 m street sw - install (3) 4x4x4 dc manholes, (6) #16 cast iron poles w 1 watt led, and (1) pendant pole w 2 watt led teardrop, remove (4) existing poles, fixtures, and foundations. Remove traffic signals on existing to remove pendant poles, re-install existing traffic signals to (1) to new #16 pole and (1) new pendant pole. Conduit between street light poles and manholes is 1-2 inch pvc, conduit between manholes and pepco is 2-4 inch pvc. Will use # rhw-2 for street light poles to manholes with #8 rhw-2 ground. Will use #4 rhw-2 for manholes to pepco with #2 rhw-2 ground. - work on 3rd street sw: install (3) #16 cast iron poles with 1 watt led, (1) #16 cast iron pole with 1 watt led and re-installed traffic signal with new ts cable, and (2) 4x4x4 dc manholes - work on m street sw: install (2) #16 cast iron poles with 1 watt led, (1) pendant pole with 2 watt led teardrop and re-installed traffic signal with new ts cable, and (1) 4x4x4 dc manhole Date: March 22, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Fixture; traffic signal installation, excavation; electric ml conduit | Permit status: Revise and resubmit | Expiration date: February 1, 2018 | Permit id: 0 | |||||
SCORE 89 811 Vermont Avenue Nw Washington Dc This job is to convert 4 dc sl street lights from hps to 1 watt led, head change only, remove existing hps fixture, 118 globe, and photo cell install new button photo cell and new 1 watt led post top fixture 2 on the east side of the 8 block of vermont ave, nw between h street and i street 1 on the nec of vermont ave and h street, nw 1 on the north side of h street, nw 1st pole east of vermont ave Date: April 25, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; streetlight(s) installation | Permit status: Issued | Expiration date: July 20, 2017 | Permit id: Pa204374 | |||||
SCORE 89 9 New York Avenue Nw Washington Dc Install (4) 4x4 manholes, (5) twin-20's with 1 watt led, install ductbank(s) and (5) foundations. Remove (4) existing twin-20's and foundations. Install conduit and wiring per drawing. On new york avenue, 10th street, and i street nw. Date: April 25, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Issued | Expiration date: July 24, 2017 | Permit id: Pa199796-R1 | |||||
SCORE 89 14 1499 Block Of V Street Nw Washington Dc On the south side of 14th street, nw a new building is going in at 1449 v street, nw, two pepco manhole are to be eliminated to install new vaults and under ground utilities. There is one dc ddot street light id #11791, that is fed out of one the manholes to be eliminated. After field meeting with the dc ddot electrical inspector devon smith, it was agreed the best way to back feed this light until the new system is installed, that will pick up the new feed to this light was to come out of the pole on the swc of 14th & v st, nw pole id #11793, set a 28 ft metal street light pole on a temporary foundation to support the overhead triplex to feed the light #11791, that will be out because of the pepco manholes removal. Then once the new lighting system is install and light #11791 is feed out of the new system, remove the overhead wires, pole and temporary foundation. There will be no digging required to do the work under this permit, only overhead wires and placement of a temporary fo Date: April 4, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; pole installation (single or first one), over head work; string electrical wire | Permit status: Issued | Expiration date: July 3, 2017 | Permit id: Pa187174-R1 | |||||
SCORE 89 911 2nd Street Ne Washington Dc Work at new building at 911 2nd street ne (1 new street light pole in front of 911 2nd street ne, 1 street light head change on parker street ne - side of building plus (2) alley fixtures on south side of building) - on 2nd street ne install (1) 3x3x3 manhole, feet of 1-2 inch conduit with (2) # rhw-2, (1) #8 ground, 5 foot of 2-4 inch conduit, (2) 4 rhw-2 plus (1) #2 ground between dcsl manhole and pepco manhole - on parker street ne on existing dcsl id pole #16382 remove 2 watt hps fixture and install 1 watt led cobra - in alley out of existing manhole run foot of conduit with (2) # rhw-2 plus (1) #8 ground to verizon wood pole on south side of alley, install u-guard up pole, install 3 foot arm for wood pole and watt led cobra, install ground rod and #6 solid to new arm - 2nd light in alley near rear of 911 2nd street remove 1 watt hps fixture from pole and install watt led cobra Date: March 21, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Issued | Expiration date: July 6, 2017 | Permit id: Pa202721 | |||||
SCORE 89 1211 23rd Street Nw Washington Dc Install two (2) -4' x 4" dc sl manholes, four (4) foundations, conduit, sl cables, tie into pepco manhole for new sl power source, install three (3) #16 cast iron poles, three (3)- #16 pole foundations, three (3) 1 watt led post top fixtures, one (1) 28 ft pendant pole with 8 ft arm, decorative wrap, 2 watt led tear drop fixture. Remove one(1) 28 ft pendant pole with 8 ft arm, fixture, t-base, foundation and feeder cable. Date: February 28, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Permit expired | Expiration date: May 29, 2017 | Permit id: Pa187197-R1 | |||||
SCORE 89 701 2nd Street Ne Washington Dc This permit application is to make all the correction on the street lighting punch list created by mr. Tony lawson dc ddot electrical inspection at the street and alley light project at 701 2nd street, ne installed by r. E. Hinkle and power design. Attached you will find a detailed list or scope of work that must be done a each pole, manhole to obtain the dc ddot final acceptance letter on the lighting system. L1- #16 cast iron pole must be replaced, replace the 3 lights hanging under h street bridge over 2nd street, ne, l3- foundation must be removed and replaced, was rejected by mr. Lawson, mh #1 replace frame and cover, makes splices and install cables and grounding system, mh #2 replace frame and cover, make splices and install cables and grounding system, mh #3 replace frame and cover, make splices and install cables and grounding system, pepco manhole install bell ends, install cables, clean manhole floor, l11 1st 5-a pole in alley install grounding system, mh #4 install cables ma Date: January 18, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; manhole frame and cover (adjust), over head work; streetlight temporary removal | Permit status: Permit expired | Expiration date: June 1, 2017 | Permit id: Pa199462 | |||||
SCORE 89 1785 Massachusetts Avenue Nw Washington Dc F i two 3x3x3 manholes. F i one twin light pole with 2 1 led fixtures. F i one dc-16 pole with one 1 watt led fixture. Trench in one 2" concrete encased pvc with 2# and 1 #8 approx. 222 feet. Trench in 2 concrete encased 4" pvc with 3#4 and 1#2 ground, approx. 59 feet. Remove 2 existing dc-16 poles and remove 2 old foundation and install 2 new foundations. Reinstall existing dc-16 poles on new foundations with new 1 watt led fixtures. F i one new 2 watt led fixture on existing pole. Paint 2 existing traffic poles black. Date: February 21, 2017 Contractor: Fort Myer Construction Fort Myer Construction Client: Fort Myer Construction | Permit type: Excavation; electric ml conduit | Permit status: Permit expired | Expiration date: May 22, 2017 | Permit id: Pa184132-R1 | |||||
SCORE 89 I Street Nw And 10th Street Nw Washington Dc To reair 8 dc street lights that were put out due to a pedersrian under ground tunnel installation, we will need to run 3- 4 & 1- #2 g wire between existing dc manhole m and dc manhole m48, from the 9 block of i sreet, nw to the west side of 10th street, nw through existing dc sl conduit. Make splices in dc manhole #m20, m48 and m47. We wil have to run 1" flex conduit between dc manhole m47 to l67-16. Light l68-16 was removed by others, the following lights are currently out l71-pp, l72-16, l70-16, l69-16, l67-16, l66-16 and l65-16. This temporary wiring will stay in place until the conduit in the roadway is restored. Some time in late 2017. Date: February 7, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; string electrical wire | Permit status: Permit expired | Expiration date: May 8, 2017 | Permit id: Pa187703-R1 | |||||
SCORE 89 1111 24th Street Nw Washington Dc Install streetlights, conduit, foundations, manholes cables per plans around 1111 24th st, nw. West end residential properties, square 37, 3- #16 ci pole, with 1 w led lights, 1 manhole on 23rd st side of the building, 4-#16 ci poles, with 1 w led lights, 2 manholes on the l st side of building, 2- #16 ci pole, with 1 w led lights, 1 manhole on the 24th st side of the building, paint two pendant poles, 1 on the nwc 23rd & l st & 1 on the nec 24th & l st, remove arms and fixtures on the two pendant poles, install decorative arm with 2 w led fixtures. Penetrate 3 pepco manholes for new street light feeder points. Date: January 30, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Permit expired | Expiration date: April 27, 2017 | Permit id: Pa186612-R1 | |||||
SCORE 89 14 1499 Block Of V Street Nw Washington Dc On the south side of 14th street, nw a new building is going in at 1449 v street, nw, two pepco manhole are to be eliminated to install new vaults and under ground utilities. There is one dc ddot street light id #11791, that is fed out of one the manholes to be eliminated. After field meeting with the dc ddot electrical inspector devon smith, it was agreed the best way to back feed this light until the new system is installed, that will pick up the new feed to this light was to come out of the pole on the swc of 14th & v st, nw pole id #11793, set a 28 ft metal street light pole on a temporary foundation to support the overhead triplex to feed the light #11791, that will be out because of the pepco manholes removal. Then once the new lighting system is install and light #11791 is feed out of the new system, remove the overhead wires, pole and temporary foundation. There will be no digging required to do the work under this permit, only overhead wires and placement of a temporary fo Date: November 23, 2016 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; pole installation (single or first one), over head work; string electrical wire | Permit status: Permit expired | Expiration date: May 4, 2017 | Permit id: Pa187174 | |||||
SCORE 89 911 2nd Street Ne Washington Dc Work at new building at 911 2nd street ne (1 new street light pole in front of 911 2nd street ne, 1 street light head change on parker street ne - side of building plus (2) alley fixtures on south side of building) - on 2nd street ne install (1) 3x3x3 manhole, feet of 1-2 inch conduit with (2) # rhw-2, (1) #8 ground, 5 foot of 2-4 inch conduit, (2) 4 rhw-2 plus (1) #2 ground between dcsl manhole and pepco manhole - on parker street ne on existing dcsl id pole #16382 remove 2 watt hps fixture and install 1 watt led cobra - in alley out of existing manhole run foot of conduit with (2) # rhw-2 plus (1) #8 ground to verizon wood pole on south side of alley, install u-guard up pole, install 3 foot arm for wood pole and watt led cobra, install ground rod and #6 solid to new arm - 2nd light in alley near rear of 911 2nd street remove 1 watt hps fixture from pole and install watt led cobra Date: June 29, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric ml conduit | Permit status: Permit expired | Expiration date: September 4, 2017 | Permit id: Pa202721-R1 | |||||
SCORE 89 14 1499 Block Of V Street Nw Washington Dc In front of 14 v street, nw we will be installing : 1- 4ft x 4 ft x 4 ft precast manhole, 2- #16 cast iron poles complete,(base, shaft and casing) 2- 15" bolt circle foundations, 2 - 1 watt led post top street light fixtures with button photo cells, 1 ft; of 1-2" pvc conduit duct bank, ft of 2-4" pvc duct bank, 4 feeder cable & #2 ground wire between pepco feeder manhole and the new dc ddot sl manhole, # rhw-2 cable and #8 ground wire between the dc ddot sl manhole and the new street lights, back feed the existing pp to the east of this address into the new manhole. Make all splices. Date: August 7, 2017 Contractor: Fort Myer Construction Fort Myer Construction Permit type: Excavation; electric connection | Permit status: Issued | Expiration date: December 14, 2017 | Permit id: Pa220123 | |||||
SCORE 89 I Street Nw And 10th Street Nw Washington Dc To reair 8 dc street lights that were put out due to a pedersrian under ground tunnel installation, we will need to run 3- 4 & 1- #2 g wire between existing dc manhole m and dc manhole m48, from the 9 block of i sreet, nw to the west side of 10th street, nw through existing dc sl conduit. Make splices in dc manhole #m20, m48 and m47. We wil have to run 1" flex conduit between dc manhole m47 to l67-16. Light l68-16 was removed by others, the following lights are currently out l71-pp, l72-16, l70-16, l69-16, l67-16, l66-16 and l65-16. This temporary wiring will stay in place until the conduit in the roadway is restored. Some time in late 2017. Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; string electrical wire | Permit status: Issued | Expiration date: November 4, 2017 | Permit id: Pa187703-R4 | |||||
SCORE 89 14 1499 Block Of V Street Nw Washington Dc On the south side of 14th street, nw a new building is going in at 1449 v street, nw, two pepco manhole are to be eliminated to install new vaults and under ground utilities. There is one dc ddot street light id #11791, that is fed out of one the manholes to be eliminated. After field meeting with the dc ddot electrical inspector devon smith, it was agreed the best way to back feed this light until the new system is installed, that will pick up the new feed to this light was to come out of the pole on the swc of 14th & v st, nw pole id #11793, set a 28 ft metal street light pole on a temporary foundation to support the overhead triplex to feed the light #11791, that will be out because of the pepco manholes removal. Then once the new lighting system is install and light #11791 is feed out of the new system, remove the overhead wires, pole and temporary foundation. There will be no digging required to do the work under this permit, only overhead wires and placement of a temporary fo Contractor: Fort Myer Construction Fort Myer Construction Permit type: Over head work; pole installation (single or first one), over head work; string electrical wire | Permit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa187174-R3 | |||||
SCORE 89 1785 Massachusetts Avenue Nw Washington Dc F i two 3x3x3 manholes. F i one twin light pole with 2 1 led fixtures. F i one dc-16 pole with one 1 watt led fixture. Trench in one 2" concrete encased pvc with 2# and 1 #8 approx. 222 feet. Trench in 2 concrete encased 4" pvc with 3#4 and 1#2 ground, approx. 59 feet. Remove 2 existing dc-16 poles and remove 2 old foundation and install 2 new foundations. Reinstall existing dc-16 poles on new foundations with new 1 watt led fixtures. F i one new 2 watt led fixture on existing pole. Paint 2 existing traffic poles black. Contractor: Fort Myer Construction Fort Myer Construction Client: Fort Myer Construction | Permit type: Excavation; electric ml conduit | Permit status: Issued | Expiration date: November 18, 2017 | Permit id: Pa184132-R4 |