Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Date: August 16, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140816521 | |||||
SCORE 100 Date: August 12, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140812396 | |||||
SCORE 100 Date: August 26, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140826732 | |||||
SCORE 100 Date: August 4, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140804172 | |||||
SCORE 100 Date: August 12, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140812394 | |||||
SCORE 100 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160308740 | |||||
SCORE 100 Date: August 24, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120824071 | |||||
SCORE 100 Date: April 2, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20140402601 | |||||
SCORE 100 57 Taylor St San Francisco Ca Work category: 1p; old permit is expired. New permit to finish the job work category: 1p; remodel existing bathrooms kitchen and laundry Date: April 27, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160427062 | |||||
SCORE 100 Date: August 24, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120824073 | |||||
SCORE 100 Date: August 22, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120822091 | |||||
SCORE 100 Date: April 21, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160421876 | |||||
SCORE 100 Date: April 27, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160427044 | |||||
SCORE 100 Date: April 5, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130405787 | |||||
SCORE 100 868 Douglass St San Francisco Ca Work category: 1p; new bathroom bathroom and laundry remodel plus furnace and water heater Date: April 25, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130425231 | |||||
SCORE 100 Date: April 16, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140416470 | |||||
SCORE 100 177 25th Av San Francisco Ca Work category: 2pa; remodel existing cottage at rear. 2. 5 bathrooms kitchen laundry Date: April 20, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140420551 | |||||
SCORE 100 Date: April 18, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120418544 | |||||
SCORE 100 Date: August 15, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130815289 | |||||
SCORE 100 175 27th St San Francisco Ca Work category: 2pa; install underfloor radient heat syste 1 x boiler 1 x flue 1 water heater & storage tank Date: August 5, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140805220 | |||||
SCORE 100 65 Cleary Ct San Francisco Ca Units #4 8 12: replace two 4" waste stack drains that are leaking dur to fire in unit # 4 8 12. Branches are not being replaced. (ref bldg permit applicaiton#201211164440) Date: August 19, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130819395 | |||||
SCORE 100 Date: April 20, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160420844 | |||||
SCORE 100 292 Juanita Wy San Francisco Ca Work category: 2pa; remodel: 3 bathrooms 1 kitchen 1 laundry room and 1 tankless water heater and a new gas line for master bedrooms fireplace Date: April 12, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160412662 | |||||
SCORE 100 Date: August 26, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130826941 | |||||
SCORE 100 Date: August 18, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140818546 | |||||
SCORE 100 369 Missouri St San Francisco Ca Work category: 2pa; remodel kitchen remodel laundry add bathroom top floor add half bath 2nd floor Date: April 17, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120417512 | |||||
SCORE 100 Date: August 16, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120816898 | |||||
SCORE 100 Date: April 20, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150420710 | |||||
SCORE 100 Date: April 13, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160413698 | |||||
SCORE 100 Date: April 26, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130426254 | |||||
SCORE 100 Date: April 12, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130412947 | |||||
SCORE 100 Date: August 5, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140805219 | |||||
SCORE 100 805 Marina Bl San Francisco Ca Work category: 1p; repair broken sewer line and house trap under sidewalk Date: August 14, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120814911 | |||||
SCORE 100 Date: April 23, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120423649 | |||||
SCORE 100 Date: April 21, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150421743 | |||||
SCORE 100 Date: August 20, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120820940 | |||||
SCORE 100 1397 Clayton St San Francisco Ca Work category: 1p; run new gas line for barbecue located on rear patio Date: August 8, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120808784 | |||||
SCORE 100 3919 23rd St San Francisco Ca Work category: 1p; install hydronic underfloor heating for entire house. Install boiler x 1. Install flue for boiler Date: April 13, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150413551 | |||||
SCORE 100 742 Fell St San Francisco Ca Work category: 1p; remodel existing bathroom master bathroom half bathroom and kitchen Date: April 10, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130410904 | |||||
SCORE 100 Date: April 19, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120419604 | |||||
SCORE 100 3843 26th St San Francisco Ca Remodel extg bathroom laundry and relocate water heater all ground floor. Date: April 23, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120423072 | |||||
SCORE 100 Unit 6 / 1925 Pacific Av San Francisco Ca Work category: 1p; remodel existing kitchen and bathroom x 2 Date: April 7, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150407377 | |||||
SCORE 100 Unit 1202 / 10 Green St San Francisco Ca Work category: 2pb; remodel existing bathrooms x2 half bathroom x 1 and kitchen. Date: April 17, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130417053 | |||||
SCORE 100 Date: April 2, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130402696 | |||||
SCORE 100 Date: April 11, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130411847 | |||||
SCORE 100 Date: April 29, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160429124 | |||||
SCORE 100 Unit 403 / 18 Jackson St San Francisco Ca Work category: 1p; remodel existing bathrooms x 2 remodel existing kitchen Date: April 27, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150427896 | |||||
SCORE 100 Date: August 30, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120830216 | |||||
SCORE 100 754 Ulloa St San Francisco Ca Work category: 1p; install radiant underfloor heating. Boiler x 1 flue x 1 Date: April 10, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140410350 | |||||
SCORE 100 Miller Pl San Francisco Ca Work category: 1p; trim out kitchen sink and trim out bathroom sink in managers unit Date: April 10, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130410892 | |||||
SCORE 100 Date: April 10, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140410351 | |||||
SCORE 100 Date: April 8, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130408833 | |||||
SCORE 100 Date: April 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150402279 | |||||
SCORE 100 Date: August 4, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150804242 | |||||
SCORE 100 Date: August 7, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150807342 | |||||
SCORE 100 Date: August 19, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150819605 | |||||
SCORE 100 Date: August 21, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150821686 | |||||
SCORE 100 Date: August 26, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150826802 | |||||
SCORE 100 Date: August 26, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150826808 | |||||
SCORE 100 33 Washington St San Francisco Ca Work category: 1p; revamp of heating system and new installation on 2 zones. Date: August 8, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160808595 | |||||
SCORE 100 135 15th Av San Francisco Ca Work category: 1p; remodel 1st and 2nd floor and one bathroom on the top floor Date: August 15, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160815778 | |||||
SCORE 100 Merced Av San Francisco Ca Work category: 1p; install water heater and cosmetic upgrade to powder room. Date: August 16, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160816807 | |||||
SCORE 100 Unit 2102 / 999 Green St San Francisco Ca Work category: 1p; remodel of kitchen master bathroom hall bathroom and powder room Date: August 17, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160817844 | |||||
SCORE 100 Date: August 17, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160817842 | |||||
SCORE 100 Date: August 24, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160824017 | |||||
SCORE 100 Date: August 24, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160824016 | |||||
SCORE 100 36 Knollview Wy San Francisco Ca Work category: 2pa; install (51) new sprinklers throughout entire building per nfpa#13-r Date: August 29, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160829098 | |||||
SCORE 100 Date: August 30, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160830128 | |||||
SCORE 100 3524 Judah St San Francisco Ca Work category: 1p; add bathroom on lower leverremodel existing kitchenremodel existingupstairs bathroom Date: December 1, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20111201035 | |||||
SCORE 100 Date: December 6, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20111206126 | |||||
SCORE 100 19 Golden Gate Av San Francisco Ca Replace water heater add laundry repair 2" drain line in garage upgrade gas line Date: December 30, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20111230422 | |||||
SCORE 100 Date: December 2, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131202461 | |||||
SCORE 100 Date: December 3, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131203496 | |||||
SCORE 100 Unit 0 / 167 Alhambra St San Francisco Ca Work category: 2pa; add bathroom laundry and wetbar on ground floor and remodel existing kitchen Date: December 11, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131211701 | |||||
SCORE 100 754 Ulloa St San Francisco Ca Work category: 1p; underground for 1 shower 1 toilet 1 laundry box and 1 bathroom sink Date: December 17, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131217802 | |||||
SCORE 100 Date: December 20, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131220904 | |||||
SCORE 100 Date: December 1, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141201284 | |||||
SCORE 100 Date: December 3, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20141203244 | |||||
SCORE 100 Date: December 11, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141211590 | |||||
SCORE 100 Date: December 17, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141217724 | |||||
SCORE 100 474 Linden St San Francisco Ca Plumbing for 4 story buliding 2 units 2 kitchens 4 bathrooms 2 laundry. Date: December 30, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20141230792 | |||||
SCORE 100 Date: December 1, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151201322 | |||||
SCORE 100 Date: December 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151202354 | |||||
SCORE 100 Date: December 3, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20151203400 | |||||
SCORE 100 29 Washington St San Francisco Ca Work category: 2pa; remodel bathroom kitchen laundry of units 29 and 2932 Date: December 3, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151203387 | |||||
SCORE 100 Date: December 9, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151209556 | |||||
SCORE 100 Unit 2704 / 2704 Union St San Francisco Ca Work category: 1p; remodel x3 bathroom kitchen and laundry Date: December 10, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151210565 | |||||
SCORE 100 Date: December 29, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151229955 | |||||
SCORE 100 Date: December 10, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121210514 | |||||
SCORE 100 Date: December 15, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20121215646 | |||||
SCORE 100 Date: December 19, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20121219917 | |||||
SCORE 100 17 Yosemite Av San Francisco Ca Work category: 1p; install floor draininstall floor sinkinstall triple sink for coffee kiosk Date: December 20, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121220724 | |||||
SCORE 100 Date: December 21, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121221732 | |||||
SCORE 100 631 29th Av San Francisco Ca Work category: 1p; to comply with report cc-7200. 631-633 29th ave. 94131 Date: December 28, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121228794 | |||||
SCORE 100 Date: December 28, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121228806 | |||||
SCORE 100 Date: February 6, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120206134 | |||||
SCORE 100 949 Hampshire St San Francisco Ca Work category: 1p; remodel existing bathroom and kitchen. Add laundry and 2 bathrooms on top floor Date: February 8, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120208212 | |||||
SCORE 100 Date: February 8, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120208211 | |||||
SCORE 100 Date: February 14, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120214328 | |||||
SCORE 100 Date: February 14, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120214330 | |||||
SCORE 100 Date: February 27, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120227760 | |||||
SCORE 100 Date: February 13, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130213684 | |||||
SCORE 100 Date: February 18, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130218765 | |||||
SCORE 100 637 Noe St San Francisco Ca Work category: 1p; romove and replace old on demand water heater with new one. Same location Date: February 20, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130220799 | |||||
SCORE 100 Date: February 25, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130225899 | |||||
SCORE 100 Date: February 7, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140207863 | |||||
SCORE 100 58 Woodward St San Francisco Ca Work category: 1p; remodel existing kitchen bathroom and relocate laundry Date: February 7, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140207862 | |||||
SCORE 100 Date: February 14, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140214039 | |||||
SCORE 100 2037 Scott St San Francisco Ca Work category: 1p; remodel existing bathroom laundry and kitchen. Second bathroom: no work Date: February 18, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140218077 | |||||
SCORE 100 2039 Scott St San Francisco Ca Work category: 2pa; remodel existing bathrooms kitchen laundry add powder room Date: February 18, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140218075 | |||||
SCORE 100 129 Elsie St San Francisco Ca Work category: 2pa; remodel existing two bathrooms & install shower pan Date: February 20, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140220143 | |||||
SCORE 100 Date: February 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20150202676 | |||||
SCORE 100 Date: February 3, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150203730 | |||||
SCORE 100 2065 Polk St San Francisco Ca Work category: 2pb; remodel existing restaurant. Remodel existing bathroom. Kitchen and ware wash area. Date: February 9, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150209878 | |||||
SCORE 100 Date: February 9, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150209884 | |||||
SCORE 100 69 Bluxome St San Francisco Ca Work category: 2pb; build out new bar. Bathrooms x2 bar area & brewing area Date: February 10, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150210913 | |||||
SCORE 100 Date: February 11, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150211929 | |||||
SCORE 100 Date: February 11, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150211949 | |||||
SCORE 100 Unit 207 / 2299 Post St San Francisco Ca Work category: 1p; remodel one existing bathroom install sinks x 2 Date: February 11, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150211944 | |||||
SCORE 100 655 21st Av San Francisco Ca Install backflow for bathroom back floor installationg for trench drain replace broken sewer. Date: February 19, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20150219143 | |||||
SCORE 100 Date: February 24, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150224267 | |||||
SCORE 100 474 Linden St San Francisco Ca Work category: 1p; permit pulled to pay for additional inspections for permit # pp20141230792 Date: February 3, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160203796 | |||||
SCORE 100 Unit 6 / 146 Locust St San Francisco Ca Work category: 2pa; plumbing for kitchen laundry and half bath Date: February 3, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160203794 | |||||
SCORE 100 Date: February 4, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160204684 | |||||
SCORE 100 Date: February 10, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160210024 | |||||
SCORE 100 Date: February 11, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160211040 | |||||
SCORE 100 2024 Broderick St San Francisco Ca Work category: 4pa; installation of 18 new sprinkler heads on ground floor only Date: February 16, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160216137 | |||||
SCORE 100 678 39th Av San Francisco Ca Work category: 1p; remodel 1. 5 baths and kitchen & replace water heater. Date: February 22, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160222270 | |||||
SCORE 100 Date: February 24, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160224392 | |||||
SCORE 100 Unit 0 / 1115 Greenwich St San Francisco Ca Work category: 1p; remodel kitchen laundry and half bathroom Date: February 25, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160225419 | |||||
SCORE 100 Date: February 25, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160225212 | |||||
SCORE 100 865 El Camino Del Mar San Francisco Ca Install radiant under floor heating throughout house install 1 boiler for system only and flue. Date: February 25, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160225213 | |||||
SCORE 100 Date: February 25, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160225421 | |||||
SCORE 100 Date: February 26, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160226264 | |||||
SCORE 100 925 Cabrillo St San Francisco Ca 1 shower pan for 925 cabrillo st. Only - also reference pp20111014745. Date: January 3, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120103463 | |||||
SCORE 100 Date: January 6, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120106568 | |||||
SCORE 100 Date: January 12, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120112720 | |||||
SCORE 100 Date: January 16, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120116757 | |||||
SCORE 100 Date: January 18, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120118799 | |||||
SCORE 100 764 Clayton St San Francisco Ca Work category: 11p; to comply with physical inspection report # cc 7038for units 764 & 766 Date: January 23, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120123874 | |||||
SCORE 100 Date: January 30, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120130018 | |||||
SCORE 100 Date: January 30, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120130016 | |||||
SCORE 100 Date: January 9, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130109993 | |||||
SCORE 100 441 Valley St San Francisco Ca Work category: 2pa; add a bathroom and laundry downstairs relocate water heater Date: January 16, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130116141 | |||||
SCORE 100 4105 19th St San Francisco Ca Work category: 1p; replace building house trap and sewer under sidewalk only. Date: January 16, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130116145 | |||||
SCORE 100 Date: January 24, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130124283 | |||||
SCORE 100 Date: January 28, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130128333 | |||||
SCORE 100 Date: January 7, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140107060 | |||||
SCORE 100 373 28th St San Francisco Ca Work category: 1p; bathroom remodel powder room laundry and kitchen remodel Date: January 7, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140107079 | |||||
SCORE 100 Date: January 15, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140115274 | |||||
SCORE 100 Date: January 21, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140121405 | |||||
SCORE 100 Date: January 23, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140123469 | |||||
SCORE 100 743 02nd Av San Francisco Ca Work category: 1p; to comply with physical inspection report number: cc-7206 - plumbing report Date: January 24, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140124520 | |||||
SCORE 100 Date: January 24, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140124521 | |||||
SCORE 100 643 Natoma St San Francisco Ca Work category: 1p; to comply with cc report #7267single unit minor repair Date: January 29, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140129629 | |||||
SCORE 100 Unit 601 / 19 Green St San Francisco Ca Work category: 1p; single unit minor repair. Remodel existing kitchen bathroom x2 and laundry Date: January 29, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140129635 | |||||
SCORE 100 Date: January 8, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150108048 | |||||
SCORE 100 Date: January 8, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150108042 | |||||
SCORE 100 Date: January 26, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150126476 | |||||
SCORE 100 Date: January 27, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150127504 | |||||
SCORE 100 Date: January 28, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150128569 | |||||
SCORE 100 Date: January 30, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150130632 | |||||
SCORE 100 Date: January 30, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150130634 | |||||
SCORE 100 Unit 0 / 2764 Greenwich St San Francisco Ca Work category: 1p; relocate plumbing pipes to allow for elevator shaft. Date: January 4, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160104011 | |||||
SCORE 100 Date: January 13, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160113247 | |||||
SCORE 100 Date: January 22, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20160122244 | |||||
SCORE 100 Date: January 26, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20160126334 | |||||
SCORE 100 Date: January 28, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160128650 | |||||
SCORE 100 Date: July 4, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120704026 | |||||
SCORE 100 Date: July 8, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120708066 | |||||
SCORE 100 3923 Sacramento St San Francisco Ca Work category: 1p; to comply with physical inspection report # cc-7073 Date: July 8, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120708067 | |||||
SCORE 100 Date: July 14, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120714213 | |||||
SCORE 100 Date: July 19, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120719349 | |||||
SCORE 100 2775 Clay St San Francisco Ca Work category: 2pb; remodel all existing bathrooms kitchen and laundry. New water heater and underground. Date: July 8, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130708723 | |||||
SCORE 100 69 Scott St San Francisco Ca Work category: 1p; install radiant under floor heating: 1 boiler pex tubing 1 flue for boiler. Date: July 8, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130708721 | |||||
SCORE 100 Date: July 10, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130710803 | |||||
SCORE 100 Unit 0 / 3481 16th St San Francisco Ca Work category: 1p; to comply with physical inspection report #cc-7260 Date: July 10, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130710807 | |||||
SCORE 100 Date: July 12, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130712853 | |||||
SCORE 100 Date: July 22, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130722046 | |||||
SCORE 100 Date: July 26, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130726186 | |||||
SCORE 100 Date: July 28, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130728187 | |||||
SCORE 100 Date: July 2, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20140702021 | |||||
SCORE 100 Date: July 2, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140702019 | |||||
SCORE 100 1546 15th St San Francisco Ca Permit renewal of pp20130604325 done by the same contractor for final inspection only. All work is complete. Date: July 9, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20140709207 | |||||
SCORE 100 1544 15th St San Francisco Ca Permit renewal of exp. Pw20130408833 done by same contractor for final inspection only. All work is complete. Date: July 9, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20140709208 | |||||
SCORE 100 25 San Anselmo Av San Francisco Ca Work category: 2pa; remodel existing kitchen bathroom x 2 add one bathroom Date: July 10, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140710572 | |||||
SCORE 100 Date: July 11, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140711613 | |||||
SCORE 100 Date: July 11, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140711614 | |||||
SCORE 100 Unit 0 / 16 Greenwich St San Francisco Ca Work category: 2pb; remodel of unit 1 & 2 . Kitchen x 2 bathrooms x 5. 5 bathroomslaundry x2 Date: July 11, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140711593 | |||||
SCORE 100 Date: July 15, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140715689 | |||||
SCORE 100 Date: July 15, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20140715388 | |||||
SCORE 100 949 Hampshire St San Francisco Ca Work category: 2pa; add kitchen bathroom & laundry in new unit downstairs Date: July 28, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140728974 | |||||
SCORE 100 Date: July 30, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140730081 | |||||
SCORE 100 Date: July 8, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150708633 | |||||
SCORE 100 Date: July 8, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150708631 | |||||
SCORE 100 Date: July 9, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150709667 | |||||
SCORE 100 Date: July 15, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150715797 | |||||
SCORE 100 Date: July 17, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150717859 | |||||
SCORE 100 Date: July 20, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150720913 | |||||
SCORE 100 Date: July 22, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150722961 | |||||
SCORE 100 Date: July 23, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150723988 | |||||
SCORE 100 Date: July 24, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150724042 | |||||
SCORE 100 4529 18th St San Francisco Ca Work category: 2pa; remodel basement add half bathroom and utility sink Date: June 6, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120606486 | |||||
SCORE 100 Unit 0 / 143 02nd Av San Francisco Ca Work category: 1p; remodel existing bathrooms and kitchen and laundry on ground floor at rear. Date: June 13, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120613655 | |||||
SCORE 100 Date: June 23, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120623858 | |||||
SCORE 100 Unit 309 / 181 Ofarrell St San Francisco Ca Work category: 1p; remodel existing bathtub and shower valve in up stairs bathroom Date: June 25, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120625868 | |||||
SCORE 100 1546 15th St San Francisco Ca Remodel existing downstairs bathroom. Up: remodel existing bathroom kitchen & laundry. Date: June 4, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130604325 | |||||
SCORE 100 Date: June 10, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130610192 | |||||
SCORE 100 Date: June 10, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130610191 | |||||
SCORE 100 Date: June 17, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130617347 | |||||
SCORE 100 4 Pacheco St San Francisco Ca Work category: 1p; relocate existing bathroom remodel existing bathroom and kitchen. Date: June 24, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130624488 | |||||
SCORE 100 Date: June 5, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140605699 | |||||
SCORE 100 Date: June 5, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140605691 | |||||
SCORE 100 315 30th St San Francisco Ca Work category: 2pb; remodel existing house. Remodel 3. 5 existing bathrooms. Remodel kitchen laundry & rain water. Date: June 12, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140612854 | |||||
SCORE 100 Date: June 12, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140612861 | |||||
SCORE 100 Date: June 16, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140616925 | |||||
SCORE 100 Date: June 17, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140617952 | |||||
SCORE 100 175 27th St San Francisco Ca Work category: 2pa; remodel existing kitchen bathrooms laundry add one bathroom Date: June 17, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140617956 | |||||
SCORE 100 Parnassus Av San Francisco Ca Address also includes 82 parnassus ave. To comply with 3r report #7664 (plumbing report) Date: June 17, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20140617561 | |||||
SCORE 100 531 45th Av San Francisco Ca Remodel existing kitchen powder room add bathroom on ground floor - sink toilet and tub Date: June 23, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140623711 | |||||
SCORE 100 2555 Webster St San Francisco Ca Work category: 1p; laundry bathroom x 8 powder room x 2 & kitchen remodel Date: June 15, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150615082 | |||||
SCORE 100 Date: June 16, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150616138 | |||||
SCORE 100 Date: June 18, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150618180 | |||||
SCORE 100 Date: June 22, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150622238 | |||||
SCORE 100 Date: June 22, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150622274 | |||||
SCORE 100 Date: June 23, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150623287 | |||||
SCORE 100 Date: June 24, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150624345 | |||||
SCORE 100 Date: June 24, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150624326 | |||||
SCORE 100 22 Francisco St San Francisco Ca Work category: 1p; retro fit new copper cold line to kitchens x 11 retrofit new waste line to kitchens x 9. All piping is run on exterior of building Date: June 2, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160602952 | |||||
SCORE 100 Date: June 2, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160602954 | |||||
SCORE 100 Date: June 7, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160607033 | |||||
SCORE 100 48 Westgate Dr San Francisco Ca Renew permit pw20150317886 + pw20150317885 for final inspections previous work decrip: pw20150317886 - radiant heating & pw20150317885 - remodel home 2 baths and 2 laundry Date: June 7, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20160607045 | |||||
SCORE 100 71 Jordan Av San Francisco Ca Work category: 2pa; install heads per nfpa #13r underground per nfpa#24 Date: June 8, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160608061 | |||||
SCORE 100 Date: June 9, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160609131 | |||||
SCORE 100 Date: June 15, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160615262 | |||||
SCORE 100 Date: June 15, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160615276 | |||||
SCORE 100 Date: June 23, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160623504 | |||||
SCORE 100 Date: March 2, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120302688 | |||||
SCORE 100 1424 Page St San Francisco Ca Work category: 1p; kitchen remodel & add half bathroom (toilet & sink) beside kitchen. Date: March 5, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120305745 | |||||
SCORE 100 Date: March 8, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120308806 | |||||
SCORE 100 2627 Lombard St San Francisco Ca Work category: 11p; to comy with report physical inspection application cc- 7058 Date: March 22, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120322053 | |||||
SCORE 100 Date: March 19, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130319403 | |||||
SCORE 100 7 Winfield St San Francisco Ca Work category: 2pb; remodel of first floor underground plumbing only for bathroom and mechanical roomnew sewer and house trap catch basin Date: March 19, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130319433 | |||||
SCORE 100 Date: March 20, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130320447 | |||||
SCORE 100 Date: March 20, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130320442 | |||||
SCORE 100 Date: March 3, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140303379 | |||||
SCORE 100 Date: March 5, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140305470 | |||||
SCORE 100 Date: March 10, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140310552 | |||||
SCORE 100 Date: March 20, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140320804 | |||||
SCORE 100 Date: March 27, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140327966 | |||||
SCORE 100 4 Embarcadero Center San Francisco Ca Work category: 1p; remodel plumbing in existing coffee shop. Install triple sink (no grease trap requires)install hand sink x 2mop sink x 1relocate water heater Date: March 27, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140327955 | |||||
SCORE 100 Date: March 4, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150304523 | |||||
SCORE 100 Date: March 5, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150305582 | |||||
SCORE 100 Date: March 6, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150306612 | |||||
SCORE 100 157 Randall St San Francisco Ca Work category: 1p; install radiant heating system one boiler one flue Date: March 9, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150309647 | |||||
SCORE 100 Date: March 9, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150309658 | |||||
SCORE 100 Unit 1601 / 1835 Franklin St San Francisco Ca Work category: 1p; remodel existing bathroom x2 kitchen and laundry Date: March 13, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150313771 | |||||
SCORE 100 Date: March 17, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150317885 | |||||
SCORE 100 48 Westgate Dr San Francisco Ca Work category: 2pa; install radiant heating for home. Pex tubing underfloor throughout boilers x 1. Flue x1 Date: March 17, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150317886 | |||||
SCORE 100 Date: March 23, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150323026 | |||||
SCORE 100 Date: March 24, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150324045 | |||||
SCORE 100 Date: March 25, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150325113 | |||||
SCORE 100 Date: March 25, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150325092 | |||||
SCORE 100 Date: March 30, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150330169 | |||||
SCORE 100 71 Jordan Av San Francisco Ca Work category: 2pa; install radiant underfloor heating boiler x1 flue x1 Date: March 3, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160303634 | |||||
SCORE 100 Date: March 3, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160303636 | |||||
SCORE 100 3919 23rd St San Francisco Ca Work category: 1p; the previous permit # got expired pw20141003746 the description is:work category: 2pb; full re-model as per approved plans Date: March 3, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160303625 | |||||
SCORE 100 Date: March 8, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160308728 | |||||
SCORE 100 Date: March 10, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160310809 | |||||
SCORE 100 Date: March 18, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160318012 | |||||
SCORE 100 Date: March 25, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160325204 | |||||
SCORE 100 Date: March 29, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160329179 | |||||
SCORE 100 Date: March 29, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160329180 | |||||
SCORE 100 Date: May 7, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120507920 | |||||
SCORE 100 Date: May 18, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120518151 | |||||
SCORE 100 Date: May 22, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120522218 | |||||
SCORE 100 Date: May 30, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120530347 | |||||
SCORE 100 7 Winfield St San Francisco Ca Work category: 1p; install radiant heat tubing on basement floor only install 1 boiler install 1 flue. Date: May 1, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130501357 | |||||
SCORE 100 Unit 0 / 32 Walter St San Francisco Ca Work category: 1p; remodel existing: kitchen laundry add one bathroom. Date: May 3, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130503397 | |||||
SCORE 100 Date: May 7, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130507460 | |||||
SCORE 100 Date: May 9, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130509535 | |||||
SCORE 100 69 Scott St San Francisco Ca Work category: 1p; remodel existing bathrooms and kitchen same locations Date: May 13, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130513585 | |||||
SCORE 100 Date: May 14, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130514625 | |||||
SCORE 100 1219 11th Av San Francisco Ca Work category: 1p; new powder room kitchen remodel bathroom remodel and water heater Date: May 14, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130514635 | |||||
SCORE 100 2267 Francisco St San Francisco Ca Remove both units: 2 kitches 4. 5 bathrooms 2 laundry 2 water heater. Date: May 20, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130520890 | |||||
SCORE 100 Date: May 5, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140505875 | |||||
SCORE 100 Date: May 6, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140506912 | |||||
SCORE 100 Date: May 9, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140509015 | |||||
SCORE 100 Date: May 12, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140512079 | |||||
SCORE 100 Date: May 28, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140528467 | |||||
SCORE 100 Date: May 5, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150505090 | |||||
SCORE 100 Date: May 12, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150512272 | |||||
SCORE 100 Date: May 13, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150513311 | |||||
SCORE 100 474 Oak St San Francisco Ca Work category: 1p; install trench drain and catch basin. Reroute some water lines. Date: May 14, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150514346 | |||||
SCORE 100 Date: May 26, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150526536 | |||||
SCORE 100 667 Mangels Av San Francisco Ca Work category: 1p; underfloor heating for entire house. Boiler x1flue x11 Date: May 26, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150526541 | |||||
SCORE 100 Date: May 26, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20150526934 | |||||
SCORE 100 Date: May 28, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150528647 | |||||
SCORE 100 Date: May 3, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160503182 | |||||
SCORE 100 1365 Union St San Francisco Ca Work category: 2pb; install 49 new sprinklers throughout entire ground floor only per nfpa#13-r. Underground per nfpa#24. Underground per nfpa#24 Date: May 12, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160512459 | |||||
SCORE 100 Date: May 16, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160516522 | |||||
SCORE 100 Date: May 17, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160517554 | |||||
SCORE 100 Date: May 17, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160517551 | |||||
SCORE 100 Unit 0 / 20 Leavenworth St San Francisco Ca Work category: 1p; 3rd floor: install 1 sprinkler only. Ref #201603232910 Date: May 19, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160519642 | |||||
SCORE 100 4311 24th St San Francisco Ca Work category: 1p; relocate existing laundry. Remodel existing laundry room into bathroom Date: November 9, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20111109670 | |||||
SCORE 100 Unit 0 / 101 Point Lobos Av San Francisco Ca Work category: 1p; bathroom and kitchen remodel of unit 201 Date: November 14, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20111114731 | |||||
SCORE 100 Date: November 17, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20111117841 | |||||
SCORE 100 Date: November 18, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20111118587 | |||||
SCORE 100 Lurline St San Francisco Ca Work category: 1p; remodel existing kitchen and bathroom relocate water heater Date: November 21, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20111121899 | |||||
SCORE 100 Date: November 21, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20111121897 | |||||
SCORE 100 Date: November 6, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121106818 | |||||
SCORE 100 743 02nd Av San Francisco Ca Amend job description from remodel of kitchen bathroom half bath and laundry to remodel of (e) kitchen bathroom laundry and "add second bathroom. Amendment to pw20121011223 Date: November 8, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20121108952 | |||||
SCORE 100 Unit 701 / 10 Green St San Francisco Ca Work category: 1p; remodel existing bathrooms (2) and kitchen Date: November 19, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121119118 | |||||
SCORE 100 Date: November 27, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121127251 | |||||
SCORE 100 Date: November 4, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131104750 | |||||
SCORE 100 Date: November 7, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131107871 | |||||
SCORE 100 Date: November 13, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131113003 | |||||
SCORE 100 793 22nd Av San Francisco Ca Work category: 1p; install new laundry and bring the bathroom and kitchen up to code Date: November 13, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131113999 | |||||
SCORE 100 Date: November 19, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20131119115 | |||||
SCORE 100 Date: November 25, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131125336 | |||||
SCORE 100 Date: November 25, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20131125253 | |||||
SCORE 100 Date: November 18, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20141118886 | |||||
SCORE 100 21 Webster St San Francisco Ca Renew permit # pw20140816521 for final inspection remodel mens & womens restrooms x 5 Date: November 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20151102224 | |||||
SCORE 100 Date: November 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151102573 | |||||
SCORE 100 Date: November 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151102598 | |||||
SCORE 100 Date: November 11, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151111875 | |||||
SCORE 100 Date: November 12, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20151112473 | |||||
SCORE 100 Date: November 12, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20151112476 | |||||
SCORE 100 333 Lyon St San Francisco Ca Work category: 1p; new bathroom x1 new laundry in attic install tankless heater (no flue) x1 Date: November 16, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151116995 | |||||
SCORE 100 Date: November 18, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20151118079 | |||||
SCORE 100 Date: November 20, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151120118 | |||||
SCORE 100 Date: November 23, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151123164 | |||||
SCORE 100 Date: November 24, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151124225 | |||||
SCORE 100 927 Cabrillo St San Francisco Ca Remodel kitchen in unit 925 install new bathroom in unit 925. Install laundry and relocate water heaters in both units in garage. Date: October 14, 2011 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20111014745 | |||||
SCORE 100 Date: October 2, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131002868 | |||||
SCORE 100 Date: October 2, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20131002867 | |||||
SCORE 100 Date: October 15, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20131015075 | |||||
SCORE 100 Date: October 15, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20131015074 | |||||
SCORE 100 Date: October 17, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131017278 | |||||
SCORE 100 Date: October 21, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131021349 | |||||
SCORE 100 Date: October 21, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20131021350 | |||||
SCORE 100 11 Shrader St San Francisco Ca Work category: 1p; to comply with physical inspection report #cc-7526 (plumbing report) Date: October 1, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20141001669 | |||||
SCORE 100 Date: October 3, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141003759 | |||||
SCORE 100 Date: October 3, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20141003758 | |||||
SCORE 100 Date: October 3, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141003746 | |||||
SCORE 100 Date: October 3, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20141003757 | |||||
SCORE 100 Date: October 6, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141006781 | |||||
SCORE 100 Date: October 6, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141006782 | |||||
SCORE 100 Date: October 6, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20141006792 | |||||
SCORE 100 Date: October 6, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141006780 | |||||
SCORE 100 4 West Portal Av San Francisco Ca Work category: 2pa; remodel existing half bath bathroom laundry partial kitchen remodel. Date: October 8, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141008868 | |||||
SCORE 100 Date: October 11, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141011929 | |||||
SCORE 100 11 Shrader St San Francisco Ca Work category: 1p; pull permit for old water heater install in unit #3 as part of cc report 7526 Date: October 14, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20141014992 | |||||
SCORE 100 11 Shrader St San Francisco Ca Work category: 1p; pull permit for old water heater install in unit 1 as part of cc report 7526 Date: October 14, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20141014989 | |||||
SCORE 100 Date: October 17, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141017122 | |||||
SCORE 100 157 Randall St San Francisco Ca Remodel home - 2. 5 bathrooms kitchen & laundry radiant heat under floor & water heater Date: October 27, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20141027326 | |||||
SCORE 100 Date: October 30, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141030519 | |||||
SCORE 100 Date: October 30, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141030521 | |||||
SCORE 100 41 Dearborn St San Francisco Ca Work category: 1p; install radiant under floor heating for lower unit. Install boiler x1 install flue x1 Date: October 30, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141030520 | |||||
SCORE 100 Date: October 8, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151008916 | |||||
SCORE 100 Date: October 13, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151013009 | |||||
SCORE 100 Date: October 14, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20151014743 | |||||
SCORE 100 Date: October 16, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20151016800 | |||||
SCORE 100 Date: October 16, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20151016799 | |||||
SCORE 100 Date: October 20, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20151020259 | |||||
SCORE 100 Date: October 20, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151020258 | |||||
SCORE 100 Date: October 1, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20121001976 | |||||
SCORE 100 2324 Greenwich St San Francisco Ca Work category: 1p; remodel of existing kitchen laundry and down stairs bathroom Date: October 2, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121002994 | |||||
SCORE 100 Date: October 11, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121011223 | |||||
SCORE 100 Date: October 16, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121016322 | |||||
SCORE 100 Date: October 22, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121022445 | |||||
SCORE 100 3346 Clay St San Francisco Ca Addition bathroom on 2nd level. Remodel kitchen. Remodel exsting 2 bathrooms upstairs. Date: October 23, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20121023545 | |||||
SCORE 100 Date: October 30, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20121030673 | |||||
SCORE 100 Date: October 30, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20121030660 | |||||
SCORE 100 Date: September 11, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120911490 | |||||
SCORE 100 Date: September 12, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120912527 | |||||
SCORE 100 Unit 1 / 1896 Pacific Av San Francisco Ca Work category: 2pa; remodel existing kitchen bathroom laundry. And add a half bathroom Date: September 24, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120924804 | |||||
SCORE 100 Date: September 25, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20120925808 | |||||
SCORE 100 Date: September 26, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120926888 | |||||
SCORE 100 Date: September 27, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120927891 | |||||
SCORE 100 Date: September 5, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130905167 | |||||
SCORE 100 2326 Union St San Francisco Ca 2326 lower unit: rough in & trim out foro ne bathroom; 2328 trim out upler leave rough completed by other pp20130813214. Date: September 16, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130916173 | |||||
SCORE 100 Date: September 18, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130918434 | |||||
SCORE 100 55 Buena Vista Tr San Francisco Ca Work category: 1p; install wet bar sink install gas line for fire place Date: September 25, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130925677 | |||||
SCORE 100 Date: September 8, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140908001 | |||||
SCORE 100 Date: September 9, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140909065 | |||||
SCORE 100 Date: September 9, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140909066 | |||||
SCORE 100 Date: September 9, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140909064 | |||||
SCORE 100 Prosper St San Francisco Ca Work category: 1p; to comply with physical inspection report #cc-7736 (plumbing report) Date: September 19, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140919352 | |||||
SCORE 100 Date: September 22, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140922379 | |||||
SCORE 100 Date: September 23, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140923417 | |||||
SCORE 100 Date: September 24, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140924455 | |||||
SCORE 100 Date: September 25, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140925530 | |||||
SCORE 100 Date: September 25, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140925519 | |||||
SCORE 100 Date: September 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150902979 | |||||
SCORE 100 Unit 0 / Walter St San Francisco Ca Remodel both units: each unit: kitchen bathroom laundry; all new plumbing. Date: September 2, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150902667 | |||||
SCORE 100 Date: September 8, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150908083 | |||||
SCORE 100 Date: September 9, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150909117 | |||||
SCORE 100 3456 Baker St San Francisco Ca Work category: 1p; install radiant underfloor heating boiler x1 flue x1 Date: September 11, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150911180 | |||||
SCORE 100 5 Geary St San Francisco Ca Work category: 2pb; remodel and trim out rooms 9-16 on floors 2nd through 7th Date: September 11, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150911176 | |||||
SCORE 100 2555 Webster St San Francisco Ca Work category: 1p; install radiant underfloor heating boiler x1 flue x1 Date: September 15, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150915252 | |||||
SCORE 100 Date: September 18, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150918329 | |||||
SCORE 100 Date: September 29, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20150929334 | |||||
SCORE 100 Unit 0 / Walter St San Francisco Ca Install radiant underfloor heating 2 boilers 2 flues plus additional inspections Date: September 29, 2015 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150929333 | |||||
SCORE 100 Date: September 8, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160908355 | |||||
SCORE 100 Unit 8 / 843 South Van Ness Av San Francisco Ca Work category: 1p; add two new sprinklers to apartment #8 on 4th floor only per nfpa #13 Date: September 8, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160908361 | |||||
SCORE 100 Date: September 8, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160908357 | |||||
SCORE 100 2409 Green St San Francisco Ca Work category: 1p; kitchen and powder room remodel and water heater install Date: September 14, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160914476 | |||||
SCORE 100 352 Lake St San Francisco Ca Work category: 2pa; install new and relocate plumbing for new garage build out Date: September 15, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160915522 | |||||
SCORE 100 Date: September 15, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160915498 | |||||
SCORE 100 Date: September 19, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160919072 | |||||
SCORE 100 Date: September 19, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160919599 | |||||
SCORE 100 Date: September 20, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160920640 | |||||
SCORE 100 439 Alvarado St San Francisco Ca Amend pp20160204684 for additional work: install radiant heat system. Install 1 boiler 1 flue. Date: September 20, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160920137 | |||||
SCORE 100 Date: September 22, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160922729 | |||||
SCORE 100 Date: September 22, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160922731 | |||||
SCORE 100 Date: September 23, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160923772 | |||||
SCORE 100 754 Ulloa St San Francisco Ca This pays for inspections related to original permit # pw20131217802 filed 12/17/2013. Dow: work category: 1p; remodel. Install 3. 5 bathrooms kitchen and laundry. Underground approved on on plumbing pw20131217802 Date: April 10, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140410348 | |||||
SCORE 100 1275 Guerrero St San Francisco Ca Work category: 1p; to comply with physical inspection report - application cc-8139 Date: April 3, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170403199 | |||||
SCORE 100 858 Ashbury St San Francisco Ca Work category: 1p; install 34 new sprinklers throughout prt nfpa#13 underground per nfpa#24 Date: April 11, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170411379 | |||||
SCORE 100 Unit 0 / 2263 Greenwich St San Francisco Ca Work category: 1p; remodel existing bathrooms and kitchen Date: April 12, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170412404 | |||||
SCORE 100 226 Haight St San Francisco Ca Work category: 1p; add 7 new sprinklers to an existing fire sprinkler system at 226-228 haight st on groud floor per nfpa#13 Date: April 12, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170412408 | |||||
SCORE 100 Date: April 14, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170414475 | |||||
SCORE 100 835 Castro St San Francisco Ca Work category: 1p; remodel new kitchen laundry powder room on first floor and master bathroom and bathroom on second floor. Date: April 21, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170421642 | |||||
SCORE 100 2555 Divisadero St San Francisco Ca Work category: 1p; remodel of existing bathroom and kitchen. Add 1 new bathroom kitchenette and powder room. Radiant heat: expansion of existing system add 1 new zone top floor Date: April 24, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170424659 | |||||
SCORE 100 Date: April 26, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170426733 | |||||
SCORE 100 Unit 0 / 143 02nd Av San Francisco Ca Work category: 1p; repair/ replace broken waste line under breezeway Date: August 14, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120814912 | |||||
SCORE 100 2061 Hayes St San Francisco Ca Full / complete remodel of all existing plumbing in both units including 3xwater heaters. Date: August 16, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20120816897 | |||||
SCORE 100 Unit 0 / 167 Alhambra St San Francisco Ca This pays for inspections related to original permit # pw20140816521 filed 8/16/2014. Dow: work category: 1p; to comply with cc 7720 Date: August 26, 2014 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140826730 | |||||
SCORE 100 Date: August 3, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170803978 | |||||
SCORE 100 618 Baker St San Francisco Ca Insatall 56 new new sprinklers throughout building with underground service per nfpa 13-5.. Date: August 4, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170804607 | |||||
SCORE 100 439 Alvarado St San Francisco Ca Renewal of permit pp20160329179- install 48 new new sprinklers throughout building per nfpa 13-5.. Date: August 4, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170804606 | |||||
SCORE 100 Date: August 7, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170807041 | |||||
SCORE 100 2929 19th St San Francisco Ca Upgrade fire sprinkler heads for bathroom remodel restroom and stairwell 9 sprinkler heads total. Date: August 8, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20170808686 | |||||
SCORE 100 Date: August 17, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170817302 | |||||
SCORE 100 834 Divisadero St San Francisco Ca Work category: 2pb; install plumbing underground and plumbing for tenant improvements. Date: August 21, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170821338 | |||||
SCORE 100 Date: August 24, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170824492 | |||||
SCORE 100 8 Judah St San Francisco Ca Work category: 1p; removal of back flow valve serial # s9030. Old steam boiler make up Date: August 29, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170829583 | |||||
SCORE 100 Date: December 5, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20161205570 | |||||
SCORE 100 Date: December 6, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20161206624 | |||||
SCORE 100 Date: December 12, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20161212737 | |||||
SCORE 100 Date: December 20, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20161220905 | |||||
SCORE 100 Unit 0 / 633 06th Av San Francisco Ca Work category: 2pa; radiant heat install throughout 3 floors of house. 2 boiler installs. 2 flues installs Date: December 23, 2016 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20161223998 | |||||
SCORE 100 1472 06th Av San Francisco Ca Work category: 4pa; install new fire sprinkler system for the remodel building 4th floor only. Included 1-1 4" underground fire service total 13 heads Date: December 4, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171204779 | |||||
SCORE 100 447 Hayes St San Francisco Ca Work category: 4pa; install new fire sprinkler system for the remodel building throughout. Included 2" underground for service. Total heads Date: December 4, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171204765 | |||||
SCORE 100 Date: December 5, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171205810 | |||||
SCORE 100 3639 17th St San Francisco Ca Work category: 4pa; install 36 new sprinklers throughtout per nfpa#13r and underground per nfpa #24. Ref app#201511193096 Date: December 6, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171206849 | |||||
SCORE 100 Date: December 7, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171207870 | |||||
SCORE 100 Date: December 12, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171212970 | |||||
SCORE 100 3976 25th St San Francisco Ca Work category: 4pa; install 63 sprinkler heads per nfpa #13-r and underground per nfpa #24. T. I. App# 201411040658; continuation of permit number 201604255549 Date: December 19, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171219109 | |||||
SCORE 100 58 06th Av San Francisco Ca Work category: 8p; install 1x floor-mount gas boiler and radiant heat in two zones Date: December 20, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171220132 | |||||
SCORE 100 Date: December 22, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20171222185 | |||||
SCORE 100 255 Chattanooga St San Francisco Ca Work category: 2pb; 1st floor: add 2 bathrooms remodel existing laundry/utility room2nd floor: remodel existing kitchen and bathroom Date: February 14, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130214714 | |||||
SCORE 100 Date: February 6, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20170206738 | |||||
SCORE 100 2302 Leavenworth St San Francisco Ca Work category: 1p; replace fixtures and finishes in kitchen only Date: February 14, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170214167 | |||||
SCORE 100 Date: February 24, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170224405 | |||||
SCORE 100 Unit 1601 / 10 Green St San Francisco Ca Work category: 2pa; interior remodel: kitchen move laundry powder room bathroom updates. Date: February 1, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180201203 | |||||
SCORE 100 Unit 301 / 10 Green St San Francisco Ca Work category: 2pa; interior renovations- update master bathroom two bathrooms laundry kitchen Date: February 1, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180201205 | |||||
SCORE 100 2774 Green St San Francisco Ca Work category: 2pb; installing only a water main to service a fire suppression system. No work to the sprinkler heads. Date: February 2, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180202230 | |||||
SCORE 100 477 Elizabeth St San Francisco Ca Work category: 2pb; radiant heat installation for four units with installation of boilers. Date: February 7, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180207339 | |||||
SCORE 100 3704 22nd St San Francisco Ca Kitchen and 3 bath remodel - gas to boiler sinks toilets 2 tubs 1 shower 1 shower pan Date: February 8, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20180208677 | |||||
SCORE 100 Date: February 13, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20180213511 | |||||
SCORE 100 5 Lombard St San Francisco Ca Work category: 2pa; upgrades to bathroom and kitchen: one toilet shower gas for stove dishwasher 2 sinks hose bib outside Date: February 21, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180221718 | |||||
SCORE 100 3633 Divisadero St San Francisco Ca Work category: 4pa; fire sprinkler install - approx heads 1 unit backflow valve and new service from the meter Date: February 21, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180221733 | |||||
SCORE 100 3633 Divisadero St San Francisco Ca Work category: 2pa; install (37) new sprinklers throughout per nfpa#13-r Date: January 5, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170105193 | |||||
SCORE 100 2726 Pine St San Francisco Ca Plumbing bathroom powder room and laundry also providing drainage for backyard area. Installing radiant underfloor heating for both floors Date: January 10, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170110022 | |||||
SCORE 100 Date: January 10, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170110023 | |||||
SCORE 100 Date: January 17, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170117427 | |||||
SCORE 100 Date: January 25, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170125672 | |||||
SCORE 100 882 Geary St San Francisco Ca Work category: 1p; install (75) new sprinklers throughout basement ground floor and mezzanine floor per nfpa#13 and #13-r. Underground per nfpa#24 Date: January 30, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170130782 | |||||
SCORE 100 Unit 816 / 2164 Hyde St San Francisco Ca Work category: 8p; install radiant heat system and one boiler Date: January 10, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180110487 | |||||
SCORE 100 Date: January 11, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180111522 | |||||
SCORE 100 655 Alvarado St San Francisco Ca Install new plumbing for construction of new single family residential dwelling include dwv kitchen (6) bathrooms laundry install water heater. Date: January 22, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20180122109 | |||||
SCORE 100 4 Noe St San Francisco Ca Work category: 4pa; install (64) new sprinklers throughout per nfpa #13 underground per nfpa 24. Ref #201503272091. Date: January 23, 2018 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20180123919 | |||||
SCORE 100 Date: July 7, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170707301 | |||||
SCORE 100 3976 25th St San Francisco Ca Work category: 1p; remodel existing kitchen in reference to application # pw20161103783 issued 11 03 2016 job card #201411040658 issued 02 04 2016 Date: July 10, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170710315 | |||||
SCORE 100 Date: July 11, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170711371 | |||||
SCORE 100 14 Union St San Francisco Ca Work category: 2pa; install radiant underfloor heating and install boiler x 1 Date: July 24, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170724708 | |||||
SCORE 100 Date: July 25, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170725755 | |||||
SCORE 100 Date: July 25, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170725752 | |||||
SCORE 100 Date: June 15, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170615838 | |||||
SCORE 100 Unit 0 / 2323 Franklin St San Francisco Ca Work category: 1p; cosmetic remodel: 2 bathrooms and kitchen Date: June 15, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170615859 | |||||
SCORE 100 Date: June 16, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170616868 | |||||
SCORE 100 25 Capp St San Francisco Ca Work category: 1p; perform all finish plumbing in house (all rough in and underground by others). Reference job card # 2014-09-05-5555 issued 09 12 14 expires 08 27 17 Date: June 20, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170620919 | |||||
SCORE 100 Date: March 6, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170306594 | |||||
SCORE 100 2555 Divisadero St San Francisco Ca Work category: 1p; install (8) new sprinklers throughout new 4th floor addition per nfpa#13-r underground per nfpa#24 Date: March 9, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170309688 | |||||
SCORE 100 1374 45th Av San Francisco Ca Work category: 1p; rough in top floor plumbing only. Note: 1st and 2nd floor rough in plumbing performed by others and passed by san francisco dbiinstall radiant heat system x1trim out entire building Date: March 16, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170316829 | |||||
SCORE 100 6 Page St San Francisco Ca Work category: 1p; new master bathroom new powder room on second floor and laundry room Date: March 17, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170317854 | |||||
SCORE 100 13 14th Av San Francisco Ca Work category: 1p; remodel existing plumbing on 2nd and 3rd floors as per approved plans Date: March 17, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170317856 | |||||
SCORE 100 13 14th Av San Francisco Ca Work category: 1p; install hydronic heating system on 2nd and 3rd floors only. Boiler x1 flue x1 Date: March 17, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170317857 | |||||
SCORE 100 235 San Anselmo Av San Francisco Ca Renew permit pp20151016800. Scope of work: remodel existing kitche bath and laundry. Date: March 21, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20170321903 | |||||
SCORE 100 Date: March 29, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170329127 | |||||
SCORE 100 968 Sanchez St San Francisco Ca Work category: 1p; previous permit expired permit application number: pw20151123164final inspection required - remodel wholehouse. Date: March 29, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20170329129 | |||||
SCORE 100 Date: March 30, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170330154 | |||||
SCORE 100 4075 19th St San Francisco Ca Work category: 1p; repair/replace broken water service under driveway/sidewalk Date: May 2, 2012 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120502827 | |||||
SCORE 100 Unit 1 / 1896 Pacific Av San Francisco Ca Install water heater & booster pump. Install new independent 1 1/2 water supply riser to penthouse. Ref. Pw20120924804. Date: May 15, 2013 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130515747 | |||||
SCORE 100 Date: May 3, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170503034 | |||||
SCORE 100 Date: May 4, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170504079 | |||||
SCORE 100 865 El Camino Del Mar San Francisco Ca To obtain final inspection on expired fire sprinkler permit #pp20160225212. Date: May 10, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20170510250 | |||||
SCORE 100 4 Noe St San Francisco Ca Work category: 2pa; install radiant floor heating install boiler x 1 install flues x 1 Date: May 16, 2017 Contractor: Flow Masters Plumbing Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170516162 |