Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 21 L Street Nw Washington Dc In conjunction with construction of temporary fire station company #1, adj. To lot 873 square 73, removal of granite curb and brick gutters, removal of asphalt paving surface, removal of conc. Sidewalk, removal of existing chain link fence, removal of 2 curb trees, removal of 1 streetlight pole removal of 3 parking signs/poles and 2 parking meters/poles. Install, new asphalt surface in curb and left hand drive lane 89ft. Long 22 ft wide, new granite curb and brick gutter ft. Long, 2 ft wide, and install new conc. Sidewalk 43 ft long, 22 ft wide... All along south side of l street between 21st and 22nd st. Nw. Install temp sce and chain link fence with gate for construction staging. Also referencing for this project public space committee approved application 86173 Date: February 2, 2014 Contractor: Fastfire Llc Permit type: Paving; curb & gutter(s), paving; mill and overlay, paving; sidewalk(s), landscaping; tree removal 2"-6", over head work; streetlight temporary removal, landscaping; tree removal 6. 1" - 12" | Permit status: Permit expired | Expiration date: January 23, 2015 | Permit id: Pa91546 |