Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 6711 Georgia Avenue Nw Washington Dc New bus stop location in front of 6711 georgia avenue nw. Work to include new concrete pad to replace existing roadway paving on georgia avenue, new concrete landing pad adjacent to existing sidewalk, tree replacement, and new bus stop signage. Date: August 21, 2015 Contractor: Edgar Moreno Client: Floca Matthew | Permit type: Paving; roadway | Permit status: Revoked | Expiration date: October 3, 2016 | |||||
SCORE 88 4801 North Capitol St Ne, Washington, Dc 20011 Building modernization. Interior renovation plus bldg addition, includes light structural and architectural work for fems eng co. 14. Replacement of apparatus bay slab-on-grade. Exist. M, p, f, e systems replaced with new. Site plan includes new water, sewer, and storm service. Parking area upgrade and new retaining wall to be built. Date: December 3, 2013 Contractor: Edgar Moreno Client: Dc Government | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1302494 | |||||
SCORE 88 6711 Georgia Avenue Nw Washington Dc Paving; roadway(s), paving; sidewalk(s), landscaping; replacement tree, landscaping; tree removal, bus stop service; commuter bus stop sign (sign + pole installation), fixture; sign (w footings)(exception) Contractor: Edgar Moreno Permit status: 5 | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 88 Date: July 12, 2012 Contractor: Edgar Moreno Permit status: Expired | Expiration date: September 7, 2012 | Permit id: Pa10065949 | |||||
SCORE 88 4801 North Capitol St Ne, Washington, Dc 20011 3rd extension for building permit b1302494 to expire 7. 3. 15 Date: February 9, 2015 Contractor: Edgar Moreno Client: Dc Government | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1504269 | |||||
SCORE 88 6825 Georgia Ave Nw, Washington, Dc 20012 Phase iii- construction of new 20,0 sf fems engine company fire station, including subgrade parking and new utility connections. Sitework to include new paving and green areas to meet swm and gar requirements. Phase ii foundation permit in process fd1600021 phase i raze permit approved & issued r1500098 Date: April 11, 2017 Contractor: Edgar Moreno Client: Dc Government | Permit type: New building | Permit status: Permit issued | Permit id: B1602791 | |||||
SCORE 88 6711 Georgia Avenue Nw Washington Dc New bus stop location in front of 6711 georgia avenue nw. Work to include new concrete pad to replace existing roadway paving on georgia avenue, new concrete landing pad adjacent to existing sidewalk, tree replacement, and new bus stop signage. Contractor: Edgar Moreno Permit status: Revoked | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 88 6711 Georgia Avenue Nw Washington Dc Paving; roadway(s), paving; sidewalk(s), landscaping; replacement tree, landscaping; tree removal, bus stop service; commuter bus stop sign (sign + pole installation), fixture; sign (w footings)(exception) Contractor: Edgar Moreno Permit status: 5 | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 88 6711 Georgia Avenue Nw Washington Dc New bus stop location in front of 6711 georgia avenue nw. Work to include new concrete pad to replace existing roadway paving on georgia avenue, new concrete landing pad adjacent to existing sidewalk, tree replacement, and new bus stop signage. Contractor: Edgar Moreno Permit status: Revoked | Expiration date: October 3, 2016 | Permit id: 0 | |||||
SCORE 88 4801 North Capitol Street Ne Washington Dc Removal and replacement of existing concrete driveway paving. No modifications to existing sizes required. Trenching and installation and replacement of existing utilities. Contractor: Edgar Moreno Permit status: Cancel/withdrawn | Expiration date: February 24, 2014 | Permit id: 0 | |||||
SCORE 88 4801 North Capitol Street Ne Washington Dc Removal and replacement of existing concrete driveway paving. No modifications to existing sizes required. Trenching and installation and replacement of existing utilities. Contractor: Edgar Moreno Permit status: Cancel/withdrawn | Expiration date: February 24, 2014 | Permit id: 0 |