Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 609 Maryland Ave Ne, Washington, Dc 20002 We will perform a total of four borings on the proposed site. The borings will be advanced to a depth of feet below the existing site grades and will be located within the bounds of private property. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The borings will be performed utilizing an atv-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the borings will be backfilled with bentonite slurry, which has a consistency of 2 lbs bentonite powder to 1 gallon water. Borehole abandonment will be performed by tremie-grouting via a positive displacement pump from the bottom of the borehole. Date: August 18, 2015 Contractor: Ecs Capital Ser C O Rebecca Ruschman Client: Stanton Park Development Associates, Llc C O Matt Boley | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500424 |