Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Stage, demo & rebuild approx 2 lf exterior building facade, new metal framed exterior wall, brick veneer & glazing Parcel: 14001 0014 | |||||
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 3 Mckinley Sq Boston Ma 02109 Submitting new updated drawings to reflect a change in the wall type separating the tenant spaces from the common lobby from unrated to a rated wall type (from glass storefront to drywall) Date: July 28, 2016 Contractor: Douglas Avola Client: Marriott Ownership Resorts | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: A608109 | Parcel: 0303822262 | |||||
SCORE 99 3 Mckinley Sq Boston Ma 02109 Interior commercial office renovation of existing commerical office space including: demo; millwork; doors &; hdwr; glass; drywall; act; flooring; paint; plumbing; hvac and electrical. Client: Marriott Ownership Resorts | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf548966 | Parcel: 0303822112 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Flightview: renovate an existing office space for new tenant: demo, drywall, act, millwork, doors windows, glass, paint, flooring, fp, fa, plumbing, hvac, electrical, lighting, no structural Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Demo of finishes and minor partitions of existing office space to create a new tenant space. Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Construction of new lobby, restrooms & conference room work to include drywall, act, masonry, doors, flooring, fp, fa, plbg, elec, hvac Parcel: 14001 0014 | |||||
SCORE 99 95 Wells Ave (95) Newton Ma Suite 1 (u-promise) extend act in existing board room, drywall suffits, hvac & lighting architect architecture 3s, 978-265-4779 summitted 1 hard copy and 2 pdf files Parcel: 84034 0002c | |||||
SCORE 99 102 Bridge St Newton Ma Parking lot; complete the construction of a new parking lot, including drainage, asphalt curbing, landscape, lighting, fence, striping, and sidewalk. Parcel: 14001 0013 | |||||
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Snapapp #1404sa, construction new tenant space - demo, millwork, doors, glass, drywall, act, flooring, paint, window treatments, fp, plumbing, hvac, electrical, fa, lights Parcel: 14001 0014 | |||||
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Bldg 4, lower level, ste 0 & 020: make safe & demolition; to include drywall partitions, ceiling grid, doors & hrdwr, electrical & lighting removal. Parcel: 14001 0014 | |||||
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Metasystems group, inc: demo, drywall, doors hdwr, glass, millwork, act, painting, flooring, fp, plmbg, hvac, elect., fa lighting for new tenant. Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Marketsight, llc: complete interior construction of new tenant space incl; drywall, millwork, door, hrdw, flooring, paint, fp, fa, plmbg, hvac, elect and lighting. Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma "paytronix systems"(74 bridge st): complete interior construction of new tenant space. Must meet requirements of 521 cmr Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma Curly girl designs: complete interior construction of new tenant space. Must meet requirements of 521 cmr Parcel: 14001 0014 | |||||
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma "barclay water mgmt"_ bldg 3-3rd 4th fl, suite 400. Construct new tenant space Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma "topo athletic"- new tenant space including drywall, millwork, doors, glass and meps Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma "mom central consulting"- 3rd fl, bldg 3- complete construction of new tenant space, including drywall, millwork, doors, glass, cpt, vct, paint, and meps. Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma "national brain tumor society"-building 3-2nd floor-suite 200. Must comply w 521 crm. New tenant space to include drywall, metal, millowrks, doors, glass, lighting, and mechanicals. Parcel: 14001 0014 | |||||
SCORE 99 49 Chapel St (55) Newton Ma "champ internet"- suite 030- new tenant fit-out. Must comply with 521 cmr Parcel: 14001 0014 | |||||
SCORE 99 3 Mckinley Sq Boston Ma Interior commercial office renovation of existing commerical office space including: demo; millwork; doors &; hdwr; glass; drywall; act; flooring; paint; plumbing; hvac and electrical. Client: Marriott Owners | Permit type: Short form bldg permit | Expiration date: July 19, 2016 | Current use: Comm | Permit id: Sf548966 | Parcel: 0303822126 | |||||
SCORE 99 3 Mckinley Sq Boston Ma Submitting new updated drawings to reflect a change in the wall type separating the tenant spaces from the common lobby from unrated to a rated wall type (from glass storefront to drywall) Date: July 28, 2016 Contractor: Douglas Avola Client: Marriott Ownership Resorts | Permit type: Amendment to a long form | Expiration date: January 28, 2017 | Current use: Comm | Permit id: A608109 | Parcel: 0303822176 |