Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 8 10th St Nw, Washington, Dc 20001 Install 1 kw and 125 amp panels. Primary fed from existing switch board in the basement. Approx. 585 of emt pipe. 22 receptacle outlets on dedicated circuits for wireless remote units. Install 11 small exhaust fans. Date: October 23, 2015 Contractor: Doug Sipler Client: Na Ccdc Office Llc Co Hines Interests | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1511792 |