Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 151 T St Ne, Washington, Dc 20002 To expand the cafeteria space which would provide additional seating. As part of this renovation, a roof infill of the triangular courtyard between wing a, the central portion of the school, and the adjacent corridor is being proposed. The roof framing is a steel structure supported on steel columns within the courtyard space. ![]() ![]() Client: Department Of General Services Dgs Dcps | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1309334 |