Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 1112 19th Street Nw Washington Dc Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) Contractor: Dennis Mitchell Oto Development Permit status: 1 | Expiration date: August 24, 2017 | Permit id: 0 | |||||
SCORE 64 1112 19th Street Nw Washington Dc Cap two existing large water connections and one sewer tap all located in the existing sidewalk Date: June 13, 2017 Contractor: Dennis Mitchell Oto Development Permit type: Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Approved (pending payment | Expiration date: August 24, 2017 | Permit id: 0 | |||||
SCORE 64 1112 19th Street Nw Washington Dc Cap two existing large water connections and one sewer tap all located in the existing sidewalk Contractor: Dennis Mitchell Oto Development Permit status: Assigned | Expiration date: September 29, 2017 | Permit id: 0 | |||||
SCORE 64 1112 19th Street Nw Washington Dc Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) Date: June 22, 2017 Contractor: Dennis Mitchell Oto Development Permit status: Permit expired | Expiration date: October 10, 2017 | Permit id: Pa207012 |