Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 30 18th St Boulder Co Remove existing water heater and boiler, replace with a 103,0 btuboiler with side arm indirect water heat. Date: February 25, 2003 Contractor: Debin Mechanical Client: Matthew Cohn | Applicant: Debin Mechanical | Permit type: Mechanical | Permit status: Cmp | Completion date: March 13, 2003 | Current use: Single family d | |||||
SCORE 59 30 18th St Boulder Co Remove existing water heater and boiler, replace with a 103,0 btuboiler with side arm indirect water heat. Client: Matthew Cohn | Permit type: Mechanical | Permit status: Cmp | Completion date: March 13, 2003 | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-00729 |