SCORE 66 901 G Street Nw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) close existing, paving; mill and overlay, fixture; bike rack(s), fixture; bike share station, fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree fence(s), landscaping; tree planting Contractor: Dcpl C O Rob E. Tate Permit status: 12 | Expiration date: April 14, 2018 | Permit id: 0 | |||||
SCORE 66 901 G Street Nw Washington Dc Existing conditions have 3 curb cuts (one off 9th street nw and two along g place, nw) the curb cut along 9th street will be closed while the 1 feet wide curb cut for the loading dock will be reduced to 52 feet with 9 radius as previously approved by ddot. One new street tree will be added along g place and all existing tree pits along g place, 9th street, and g street (total of 16) will be enlarged. Ten new bike racks are proposed in public space. New bike share proposed in private space. Four trash receptacles will be removed and replaced after construction. New curb and gutter will be install along the curb closings. A new ada curb ramp will be constructed at 9th and g place, and the 2 existing ada curb ramps at 9th and g street will be replaced Date: March 6, 2017 Contractor: Dcpl C O Rob E. Tate Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Assigned | Expiration date: April 14, 2018 | Permit id: 0 | |||||
SCORE 66 901 G Street Nw Washington Dc Existing conditions have 3 curb cuts (one off 9th street nw and two along g place, nw) the curb cut along 9th street will be closed while the 1 feet wide curb cut for the loading dock will be reduced to 52 feet with 9 radius as previously approved by ddot. One new street tree will be added along g place and all existing tree pits along g place, 9th street, and g street (total of 16) will be enlarged. Ten new bike racks are proposed in public space. New bike share proposed in private space. Four trash receptacles will be removed and replaced after construction. New curb and gutter will be install along the curb closings. A new ada curb ramp will be constructed at 9th and g place, and the 2 existing ada curb ramps at 9th and g street will be replaced Contractor: Dcpl C O Rob E. Tate Permit status: Assigned | Expiration date: April 14, 2018 | Permit id: 0 | |||||
SCORE 66 901 G Street Nw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) close existing, paving; mill and overlay, fixture; bike rack(s), fixture; bike share station, fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree fence(s), landscaping; tree planting Contractor: Dcpl C O Rob E. Tate Permit status: 12 | Expiration date: April 14, 2018 | Permit id: 0 | |||||
SCORE 66 901 G Street Nw Washington Dc Existing conditions have 3 curb cuts (one off 9th street nw and two along g place, nw) the curb cut along 9th street will be closed while the 1 feet wide curb cut for the loading dock will be reduced to 52 feet with 9 radius as previously approved by ddot. One new street tree will be added along g place and all existing tree pits along g place, 9th street, and g street (total of 16) will be enlarged. Ten new bike racks are proposed in public space. New bike share proposed in private space. Four trash receptacles will be removed and replaced after construction. New curb and gutter will be install along the curb closings. A new ada curb ramp will be constructed at 9th and g place, and the 2 existing ada curb ramps at 9th and g street will be replaced Contractor: Dcpl C O Rob E. Tate Permit status: Assigned | Expiration date: April 14, 2018 | Permit id: 0 |